Can we make injection solid, or at least less wobbly? How to define, track and enforce envelope of allowed operational parameter space through commissioning? Do we need a more formal process for authorising progress steps in the commissioning plan ? Who decides??
E N D
Can we make injection solid, or at least less wobbly? • How to define, track and enforce envelope of allowed operational parameter space through commissioning? • Do we need a more formal process for authorising progress steps in the commissioning plan? Who decides?? • Can the sequencer be made safer? • For LBDS (and other critical MPS systems) what are validations needed after fault/repair/reconfiguration? • Is collimator/protection device interlock threshold management adequate? • Easy overview of collimator positions needed… • Is SMP rock-solid? BCT redundancy?? • What are criteria to move up in intensity once we’re above safe beam limit? Discussion points for MP session