1 / 10

RHIC Machine Status

RHIC Machine Status. Wolfram Fischer — Run Coordinator for Run-4 Gold-Gold Operation — For the C-A RHIC Team RHIC Spin Collaboration Meeting 19 March 2004. Content. Run-4 Au-Au luminosity development Low energy run preparation Summary. enhanced luminosity. design luminosity.

inga
Download Presentation

RHIC Machine Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RHIC Machine Status Wolfram Fischer — Run Coordinator for Run-4 Gold-Gold Operation — For the C-A RHIC Team RHIC Spin Collaboration Meeting19 March 2004

  2. Content • Run-4 Au-Au luminosity development • Low energy run preparation • Summary

  3. enhancedluminosity designluminosity RHIC Run-4 17 March 2003 Stores during last week, Monday to Monday 60e9 Auintensity beam experiments

  4. physics target minimumprojection maximumprojection RHIC Run-4 17 March 2003 Delivered 1196 (mb)-1 to Phenix [week ago : 1060] 136 (mb)-1 last week [best week: 158] As of 03/14/04 24:00 Star 0.9 Phobos 0.3 Brahms 0.4

  5. RHIC Time in store new target including: 11h beam exper. 10h maintenance [last month] [last month] [last month] [last month] [1st 8 weeks] [Best week withoutmaintenance: 66%] Comments: - Not all store time used by experiments (initial background, detector turn-on, etc.) - Usable store time differs from experiment to experiment

  6. RHIC Run-4 17 March 2003 • Low energy run: 31.2GeV/u total beam energy • Tested ramp without beam (Al, George, Johannes) • Thursday: test ramp with beam (10 hrs) Accelerated and stored beam, started rf re-commissioning • Wednesday 24-March, 8am: switch to low energy Need to reach production fast, only small changes after setup • 24h shifts scheduledfor 3 days • Finish ramp development • Re-commission rf storage system • Other systems (ZDC, BLM,gap cleaning, collimation) 3/8/04

  7. RHIC Run-4 Set-up for 62.4GeV/u cm energy 1st ramp to 31.2GeV/u successful M. BaiJ. van ZeijtsG. Ganetis A. Marusic

  8. RHIC Run-4 Set-up for 62.4GeV/u cm energy Beam rebucketed at lower energy M. BrennanM. Blaskiewicz

  9. RHIC Run-4 Set-up for 62.4GeV/u cm energy About 50Hz ZDC rates (gains not adjusted, 23 bunches/ring) T. SatogataJ. van Zeijts

  10. Summary • Delivered Au-Au luminosity exceed most optimistic assumptions:delivered >1200(mb)-1 to PHENIX in 11 weeks(almost the same to STAR, 1/3 to BRAHMS and PHOBOS) • Calendar time in store increased to 50% • Low energy run setup on track

More Related