Spent most of last week raising the bunch number and setting up rebucketing Progress of beam work Energy and storage ramp mechanics are worked out Transmission efficiency > 98% Polarization ~65% at flattop Currently working on getting through rebucketing with high bunch number

keefe
Download Presentation

RHIC Status Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Spent most of last week raising the bunch number and setting up rebucketing • Progress of beam work • Energy and storage ramp mechanics are worked out • Transmission efficiency > 98% • Polarization ~65% at flattop • Currently working on getting through rebucketing with high bunch number • Losses with 109 on 109 pull the permit RHIC Status Update Time Meeting, V. Schoefer 2/7/12

  2. RHIC Status Update Time Meeting, V. Schoefer 2/7/12 • Speed bumps • Rebucketing setup took somewhat longer than expected • Essentially re-commissioning LLRF this year • Several trips of x-arc due to AC problem in 1000P • Cryo software and communication problem • Frequent trips of the 9 MHz RF while at store • Cavity trips due to a very fast rise in vacuum. Not explained yet • Yellow carbon polarimeters are swamped with noise after rebucketing. • Blue and yellow bunch distributions are the same