Stormwater Overview. Board of County Commissioners Planning Conference March 1, 2007. Stormwater Ordinance . Required to meet Phase II Regulations Proposed to address secondary and cumulative impacts related to: 12 Mile WWTP expansion to 6 mgd 42-inch water transmission main

ingrid
Download Presentation

Stormwater Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007

  2. Stormwater Ordinance • Required to meet Phase II Regulations • Proposed to address secondary and cumulative impacts related to: • 12 Mile WWTP expansion to 6 mgd • 42-inch water transmission main • 74 ByPass, Carolina Connector • Expected to be required for future projects

  3. Proposed Ordinance • Section I – Stormwater Design Manual • Section II – General Drainage • Includes requirements in Land Use Ordinance • Concentrated flow to adjacent properties • Permanent drainage easement recordation • Section III – Riparian Buffers • Streamside Zone • Undisturbed land along stream channel • Exemptions include limited access and utility crossings, gravity sewer and stormwater bmp’s with no alternative, fences, dam maintenance, stream restoration

  4. Proposed Ordinance • Section III – Riparian Buffers (continued) • Upland Zone • Vegetative land along Streamside Zone • Allowable uses include exemptions from Streamside Zone, storage buildings less than 150 sq ft, limited grading, greenways, recreational equipment

  5. Proposed Ordinance • Section IV – Stormwater Requirements • Applicability: • Cumulatively disturb > 1 acre • Total impervious surface > 20,000 sq ft • Exceed 6% impervious in protected watersheds • Runoff Control • Downstream hydrologic analysis • High Density (exceeds 24% built-upon) control 1-inch rain, discharge equals pre-development rate, 85% TSS removal, post equals pre-development run-off rate for 1, 10, and 25-year storm • Convey upstream drainage assuming build-out conditions • 100-year storm elevations defined

  6. Proposed Ordinance • Section IV – Stormwater Requirements • Final Plat Requirements • Streams, ponds, wetlands, buffers, base flood boundary and elevations • Permanent drainage easements • Statement lot contains stormwater management facility • As-Builts • Annual Inspection Report • Performance Security • Plan Review Fee

  7. Schedule • May 2007 - Presentation to Planning Board • June 2007 – Public Hearing and comment period • August 2007 – Presentation to Board of County Commissioners