PALM-3000 Status
PALM-3000 Status. A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010. PALM-3000 status. The big picture: We are integrating the new PALM-3000 components in the lab, while a few remaining subsystems are in detailed design. We are on track for a pre-ship review in early July.
436 views • 19 slides