120 likes | 267 Views
METOCEAN Data Systems. SVP B Model Improvements. By Bernie Petolas, P. Eng. METOCEAN Data Systems Ltd. Dartmouth NS B3B 1R9 Canada. SVP B. Agenda. Engineering, Manufacturing and Quality Upgrades to SVP B: Mechanical Improvements
E N D
METOCEAN Data Systems SVP B Model Improvements By Bernie Petolas, P. Eng. METOCEAN Data Systems Ltd. Dartmouth NS B3B 1R9 Canada
SVP B Agenda • Engineering, Manufacturing and Quality • Upgrades to SVP B: • Mechanical Improvements • Electrical Improvements PTT, Sensor and Battery Improvements • Testing and Verification • Quality Assurance/Lean Manufacturing • Conclusions
SVP B Mechanical Improvements • New Hull • Magnet Location • Mini Drogue • Tether and Attachments • Drag Ratio • Testing and Verification
SVP BP Electrical Improvements • Updated PTT • New BP Sensor • New software • Batteries • Testing and Verification
SVP BP Power Budget
SVP B In situ Testing and Verification
SVP B SVP/B vs. SVP/BW
SVP B ISO 9001-2000 • Introduction to ISO • Quality Management • Feedback loop (NCRs, SCARs and ECPs)
SVP B Lean Manufacturing • Introduction to Lean Manufacturing • Value Stream Mapping • Mistake Proofing • 5 S Process • 6 σ Total Management Philosophy • Continuous Improvement (Kaizen)
SVP B Continuous Improvement
SVP B Continuous Improvement
SVP B Conclusions • Longer Operating Life of Product • Reduce Commercial Price • No reduction in reliability • Lean Manufacturing in conjunction with ISO pays for itself quickly