1 / 12

METOCEAN Data Systems

METOCEAN Data Systems. SVP B Model Improvements. By Bernie Petolas, P. Eng. METOCEAN Data Systems Ltd. Dartmouth NS B3B 1R9 Canada. SVP B. Agenda. Engineering, Manufacturing and Quality Upgrades to SVP B: Mechanical Improvements

ira
Download Presentation

METOCEAN Data Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. METOCEAN Data Systems SVP B Model Improvements By Bernie Petolas, P. Eng. METOCEAN Data Systems Ltd. Dartmouth NS B3B 1R9 Canada

  2. SVP B Agenda • Engineering, Manufacturing and Quality • Upgrades to SVP B: • Mechanical Improvements • Electrical Improvements PTT, Sensor and Battery Improvements • Testing and Verification • Quality Assurance/Lean Manufacturing • Conclusions

  3. SVP B Mechanical Improvements • New Hull • Magnet Location • Mini Drogue • Tether and Attachments • Drag Ratio • Testing and Verification

  4. SVP BP Electrical Improvements • Updated PTT • New BP Sensor • New software • Batteries • Testing and Verification

  5. SVP BP Power Budget

  6. SVP B In situ Testing and Verification

  7. SVP B SVP/B vs. SVP/BW

  8. SVP B ISO 9001-2000 • Introduction to ISO • Quality Management • Feedback loop (NCRs, SCARs and ECPs)

  9. SVP B Lean Manufacturing • Introduction to Lean Manufacturing • Value Stream Mapping • Mistake Proofing • 5 S Process • 6 σ Total Management Philosophy • Continuous Improvement (Kaizen)

  10. SVP B Continuous Improvement

  11. SVP B Continuous Improvement

  12. SVP B Conclusions • Longer Operating Life of Product • Reduce Commercial Price • No reduction in reliability • Lean Manufacturing in conjunction with ISO pays for itself quickly

More Related