HRS-IF part Agenda. IF Design and Performances Modifications between QM and FM Planning Philippe Caïs. HRS / HIFI bilateral meeting T oulouse 14 September 2004. IF ‘simplified’ schematic. Functional diagram Ampli : G = 59 ±7.5dB 3 mixers Equivalent Frequency plan LO : 175 steps.
E N D
HRS-IF partAgenda IF Design and Performances Modifications between QM and FM Planning Philippe Caïs HRS / HIFI bilateral meetingToulouse14 September 2004 Bilateral Meeting
IF ‘simplified’ schematic • Functional diagram • Ampli : G = 59±7.5dB • 3 mixers • Equivalent Frequency plan • LO : 175 steps Bilateral Meeting
IF Performances • Some performances (worries) • Other concerns • Emergency mode cable loss to high compared to internal loss balance. >2 dB extra loss and extra cable slope… • Will come along test with correlator… coming soon Bilateral Meeting
IF AIV program Bilateral Meeting
IRM rejection Bilateral Meeting
QM Rejection Bilateral Meeting
Output spurious Bilateral Meeting
Spurious test Bilateral Meeting
Linearity • Linearity >1% • Soft correction? Bilateral Meeting
Linearity test Bilateral Meeting
Dynamic range • 4GHz BW cut into small 250MHz Bw independently adjusted in output power (0.5dB step). • IF intrinsic smooth ripple over 4GHz is translated into attenuator settings variations for each sub-band. • That reduces the window of ‘fine tuning’ for efficiency optimisation and I call that ‘IF internal dynamic range’. • Budget seems to fit (see slide) Bilateral Meeting
Dynamic range test Bilateral Meeting
Ripple budget 1/3 • Output BW to correlator 250MHz • Element ripples are ± cumulative • QM ripple over 250MHz is about 3dB. Bilateral Meeting
Ripple 2/3 • QM results (Room temp.) Bilateral Meeting
Ripple Budget 3/3 • Ripple FPU (from Nick data) • Overall ripple : FPU+ Cable + Internal 7.5dB w.c. Bilateral Meeting
Change QM FM • Frequency prescaler Hybrid (see slide) • Due to VCO output power QM NC • New VCO spec for FM and new hybrid design (coupling decreased, power supply filtering resistor) • Correlator speed: new filter design (see slide) • CPPA procurement: RLC footprint changed new layout for IRM • LO pcb : slight changes for DRC compliance (precap) • Mechanical weight reduction work in progress • Varnish (IRM and 3C) Bilateral Meeting
Coupler 1/5 5Ohms Instead of 10Ohms The right angles have been replaced by rounded angles to decrease risk of failure of 10mils alumina substrate.. 11dB coupler (spacing between the two 50Ohms lines : 60µm) instead of 12.5dB coupler (spacing : 90µm) Bilateral Meeting
Coupler 2/5 Bilateral Meeting
Coupler 3/5 Bilateral Meeting
Coupler 4/5 Bilateral Meeting
Coupler 5/5 Bilateral Meeting
BW reduction • Due to GaAs freq. Limitation (TBC) IRM output filter to be change/tuned • New LC values to be sorted for new filter shape/same constr. • Some parts may be re-ordered thru CCPA? • Slight gain variation compensated by atten. pads. Bilateral Meeting
CPPA • Capacitor ATC120 proc. pending needed for hybrid manufacture. Planning driver. Commercial lot available at MEUSONIC (the one used for QM hybrid manufacture) • VCO procurement delivery date TBC Bilateral Meeting
FM improvements • FM performances improvement • Power consumption no change expected • Mass a few % lower expected • Rejection ? Worries about new CPPA parts (footprint increase, resonnant freq. decrease) • Output spurious Major change • need to add filter in both LOs but changes to mech. design. • new substrates to be realised (pb of schedule) • Linearity 15dB margin for noise is sufficient/power consump. • Dynamic range Bilateral Meeting
Planning • Miteq • Delivery FM#1 end May 04 • Delivery FM#2 end May 04 • LO • Hybrid lot delivery end April 04 • LO manufacture mid June 04 • IRM • Manufacture mid May 04 • Alignement & tuning Mid July 04 polar H • Alignement & tuning Mid Sept 04 polar V • IF delivery to CESR FM polar H mid Sept 2004 • IF delivery to CESR FM polar V mid-Nov 2004 Bilateral Meeting