An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NPOESS Schedule and Processes AAWS June 8-10, 2004 ATS Information Technology EXCELLENCE THROUGH TEAMWORK

  2. NPOESS Timeline Direct Readout Software Production Schedule NPP DEMO will release a minimum of 6 Environmental Data Records (EDR) for direct readout

  3. NPOESS Timeline 2.3 NPOESS Field Terminal Support (FTS) software build will contain a complete end-to-end code from raw data to Environmental Data Record (EDR) output. Estimated +1,000,000 lines of code Direct Readout Software Production Schedule

  4. NPOESS Processes Direct Readout Lab Roadmap to NPP… and Beyond

  5. NPOESS Processes • Avg/Max/Imagery* • Requirement na/15.0/2.0 mins[PDRR 5 CPUs] • 70% clear & day 4.9/14.9/0.92 mins [6 CPUs; P = 2.5%] • 80% clear & day 4.4/14.0/0.89 mins [7 CPUs; P = 0.5%] • 90% clear & day 4.0/13.2/0.80 mins [8 CPUs; P =0.05%] • 100% clear & day 4.2/13.6/0.78 mins [10 CPUs; P =~0] • Field Terminals could require additional CPUs for any Field Terminal locations >70N - Ice regions will produce higher processing periods.

  6. NPOESS Processes VIIRS CMIS CrIS/ATMS OMPS SES GPSOS ERBS TSIS ALT APS 25 19 3 1 13 2 5 1 3 4 NPOESS Environmental Data Records 50 HRD EDRs and 29 LRD EDRs Ozone; Total Column/Profile Atm Vertical Temp Profile Cloud Top Height Atm Vertical Moisture Profile Cloud Top Pressure Precipitable Water Precipitation Type/Rate Cloud Top Temperature Sea Surface Temperature Sea Surface Winds Downward LW Radiance (Sfc) Pressure (Surface/Profile) Soil Moisture Downward SW Radiance(Sfc) Sea Ice Characterization Imagery Electric Field Sea Surface Height/Topo. Electron Density Profile Snow Cover/Depth Active Fires Aerosol Optical Thickness Energetic Ions Solar Irradiance Aerosol Particle Size Geomagnetic Field Supra-Thermal-Auroral Part. Aerosol Refractive Index Ice Surface Temperature Surface Type Surface Wind Stress Albedo (Surface) In-situ Plasma Fluctuations Auroral Boundary In-situ Plasma Temperature Suspended Matter Ionospheric Scintillation Auroral Energy Deposition Total Water Content Auroral Imagery Medium Energy Charged Particles Vegetation Index Cloud Base Height Land Surface Temperature Cloud Cover/Layers Net Heat Flux Cloud Effective Particle Size Net Solar Radiation (TOA) Cloud Ice Water Path Neutral Density Profile Cloud Liquid Water Ocean Color/Chlorophyll Cloud Optical Thickness Ocean Wave Characteristics Cloud Particle Size/Distribution Outgoing LW Radiation (TOA) EDRs with Key Performance Parameters LRD EDRs Black Text = HRD EDRs Gray Text = Additional SMD EDRs

  7. NPOESS Field Terminal Support Assumed Organizational Affiliations • DOC Commodity Jurisdiction issued • Users will be required to register for software • NPOESS will distribute software during both initial and recurring distribution phases (1&2) • Software will be controlled access provided by issued access keys

  8. NPOESS Field Terminal Support Field Terminal Support Concept Legend O&S Helpdesk • Mission Support Data • Mission Notices • Auxiliary Data • Ancillary Data The NPOESS Helpdesk will be available to support the NPOESS operational staff, maintenance staff, and the Field Terminal Sponsors or Field Terminal Representative (FTR). FT Sponsors have to be identified for each group/organization Ext. MSD Web Server • Work Order Data • Work Order • Work Order Updates • Helpdesk Coordination • New FT Sponsor Account • Requests • FT support questions • FT software delivery External Web Server FT Sponsor FT Sponsor FT Sponsor FT Sponsor Field Terminal Field Terminal Field Terminal Field Terminal