1 / 6

Final Lab

Final Lab. Objectives Presentation Time Slot Logistics Team Option Final Presentation Dry Run ~1:45 (P4) or ….. Prototyping – Report Assembly Time Tuesday DEC 12 – Tentative Schedule for EMS-W220 Team 1: 8:30 – 10:20AM Team 2: 10:30 – 12:20PM Team 3: 1:30 – 3:20PM

irina
Download Presentation

Final Lab

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Final Lab • Objectives • Presentation Time Slot Logistics • Team Option • Final Presentation Dry Run ~1:45 (P4) or ….. • Prototyping – Report Assembly Time • Tuesday DEC 12 – Tentative Schedule for EMS-W220 • Team 1: 8:30 – 10:20AM • Team 2: 10:30 – 12:20PM • Team 3: 1:30 – 3:20PM • Team 4: 3:30 – 5:20PM Note: Lab 10 will not be graded unless teams present P4 and request grading

  2. Suggested Final Slide Order • Project Definition & System Design • All Project Proposals including block diagrams (Appendix) • Selection Process including systematic scoring system (Appendix) • Recommended Project – Summary Page • Refined Block Diagram • Perf Requirements Summary – Showcase Key Requirements • Std Requirements Summary – Showcase Key Requirements • Product Safety Requirements/Standards Summary Slide(s) – Lab 2A • Product EMC Requirements/Standards Summary Slide(s) – Lab 2B • Basic Business Case • Block Diagram Description Page • Requirements Spreadsheet: Project Level Tabs (Excel File – Appendix) • Requirements Spreadsheet: Block Level Tab Flowdowns (Excel File – App) • Key Risk Areas • 3 Key Patents (IP) Found for Product Area Labs 1A-B Lab 1C

  3. Suggested Final Slide Order • Project Detailed Design • Product Level Design Plan Summary & Gantt Chart Slides – Lab 3 • Overall Prototype Plan – Lab3 • Product Overall Reliability Rollup Summary Slide(s), Final Warranty – Lab 4 • Product Overall Reliability Growth Plan (Optional) Slide(s) – Lab 4 • Product Overall Mfg Assembly and Test Process Diagram – Lab 6 • User Manual (show a few key pages or hilights) – Lab 9 • Overall Integration and Lab Testing – Demo Setup Insert Block Design Slides Here

  4. Suggested Slide Order for Design Blocks • Block Design Slides • Block Description and Purpose Slide(s) – P2 • Include location of Block in overall block diagram, Describe Purpose of Block • Block Performance & Standard Requirements Summary – P3 • Include ALL Safety, EMC and Reliability Requirements • Show All % Allocations from Product Level • Block Breakdown Diagram Slide (Block Diag of the Block) – P2 • Block Signal Input/Output Summary Slide(s) – Lab 2A • Block Prototype Schematic – Lab 3 • 5-6 Bullets Describing Theory of Operation

  5. Suggested Slide Order for Design Blocks Block Design Slides Continued • Detailed Design Calculations & Component Selections – P3 • Show all Calculations and Selection Rationale for ALL Components and Their Attributes • Device Package Type Rationale • Nominal Resistance, Capacitance, Inductance Values & % Tolerance Calculations • Resistor Compositions, Capacitor Dielectric, Inductor Winding; Selection Rationale • Resistor, Capacitor, Inductor, Diode, Transistor & IC Max Voltage Calculations • Resistor, Inductor, Transistor, Diode, Xfmr, & IC Max Power Calculations • Power Electronics Heat Sink qj Calculations and Max Die Temp Rise Above Ambient • EMC Devices including filters, ferrites, transient absorbers, etc • Safety Devices such as Current Limiters incl Fuses, Breakers, GFCI, etc • Wire Gauges, Interconnect Contact, & Trace Width Ratings • Op-Amp Selections including Ib, Vio, CMRR, Slew Rate, Iout & Error Voltage Calculations • Logic Family Selection including Interface Compatibility, Speed, Power • CPU and/or PLD Types and Clock Speed, Performance Capabilities • Regulator Basic Performances incl % line and % load regulations • Nominal Time Domain Operational Simulations • Nominal Frequency Domain Operational Simulations • Worst Case or Monte-Carlo Simulations • Additional Analog Circuit DFM Analysis as applicable • Additional Digital Circuit DFM Analysis as applicable (Lab 8) • Additional Power Circuit DFM Analysis as applicable (Lab 8) • Firmware & Programming Design Descriptions as applicable • Flow Charts • State Diagrams and Bubble Charts • Description of Development Tools and Environment • Configurations and Setup

  6. Suggested Slide Order for Design Blocks Block Design Slides Cont • Block Prototype BOM – Lab 3 • Block Production BOM – Lab 5 • Block Prototype Netlist – Lab 3 • Block Prototype Layout – Lab 3 • Block Production Schematic, Netlist & Layout (Optional)– Lab 5 • Block Parts Count Reliability Estimation Slide – Lab 4 • Block Life Cycle Obsolescence Analysis– Lab 9 • Block Prototype Lab Verification Results • Dig O-scope ePictures • Dig Photos of Prototype • Dig Photos of Laboratory Testing • Dig Videos of Laboratory Testing

More Related