1 / 4

Robert Kahler Branch Chief EP Inspection and Regulatory Improvements Branch

Beyond Sirens and Radios: Advances in Public Alert and Notification Systems. Robert Kahler Branch Chief EP Inspection and Regulatory Improvements Branch Division of Preparedness and Response. Alert and Notification System (ANS) Regulations. 10 CFR 50.47(b)(5)

irisa
Download Presentation

Robert Kahler Branch Chief EP Inspection and Regulatory Improvements Branch

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beyond Sirens and Radios: Advances in Public Alert and Notification Systems Robert Kahler Branch Chief EP Inspection and Regulatory Improvements Branch Division of Preparedness and Response

  2. Alert and Notification System (ANS) Regulations • 10 CFR 50.47(b)(5) • means to provide early notification and clear instruction to the populace within the plume exposure pathway Emergency Planning Zone have been established • Appendix E to 10 CFR Part 50 • licensee shall demonstrate that administrative and physical means have been established for alerting and providing prompt instructions to the public within the plume exposure pathway EPZ • alerting and notification capability shall additionally include administrative and physical means for a backup method of public alerting and notification 2

  3. Implementation of Backup Means • December 24, 2012 • Implement if already existed on December 23, 2011 • June 24, 2013 • Submittal of revised ANS design report to FEMA • Implemented within 365 days after FEMA approval • June 22, 2015 • Must have backup ANS means implemented 3

  4. NRC Point of Contact Bob Kahler, Chief (301) 415-7528 robert.kahler@nrc.gov 5

More Related