100 likes | 429 Views
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL. Outline Data Communication Roadmap Voice Communication Roadmap Spectrum & Frequency Management Roadmap. European Organisation for the Safety of Air Navigation. General Datalink Roadmap: ANSPs & Avionics.
E N D
Communication RoadmapACP WGW04 – AI5Jacky Pouzet, EUROCONTROL Outline • Data Communication Roadmap • Voice Communication Roadmap • Spectrum & Frequency Management Roadmap European Organisation for the Safety of Air Navigation
General Datalink Roadmap: ANSPs & Avionics Future Communications Technology 2010 2013 2017 2020 2025 2030 Data-link Today 4D Trajectory Messaging Deployment Data-Link Service Implementation Initial Data Link LINK 2000+ Evolution to Full 4D Initial 4D VDL M2 VHF VDL M2 LDACS L-BAND LDACS Transition Co-existence Current Satellite Systems Satellite Future SatCom SATCOM AeroMACS CBAND AeroMACS Development AeroMACS operations EUROCAE MOPS 2010 2013 2020 2025 2030 2017
Military Datalink Roadmap Future Communications Technology 2010 2013 2017 2020 2025 2030 Data-link Today 4D Trajectory Messaging Deployment Data-Link Service Implementation Initial Data Link LINK 2000+ Evolution to Full 4D Initial 4D VDL M2 VHF VDL M2 LDACS L-BAND LDACS Satellite Future SatCom SATCOM 2010 2013 2020 2025 2030 2017
General Datalink Roadmap Future Communications Services 2010 2013 2017 2020 2025 2030 Today CPDLC & ADS-C (4DTRAD + D-OTIS + DCL + D-TAXI + D-RVR) Evolution to Full 4D Business Trajectories Services CPDLC (sup. ACL, ACM, AMC) Services over Data-Link APT Domain Services Surface Vehicle Com Electronic Flight Bag Airport Sensor Data Airport Automation Diversity Path Security/Video Surveillance Services overAeroMACS 2010 2013 2020 2025 2030 2017
General Messaging & Flight Plan Roadmap Directory Services AMHS/IP(ATM) TYPE X (Airlines) Integrated Messaging Services Transition Future Communications Technology 2010 2013 2017 2020 2025 2030 Today Messaging AFTN-CIDIN(ATFM) Implem. & Security deployment G/G IP¨V6 Deployment SJU/WP15 Validation SESAR Flight Plan FMTP (cf FMTP Database) Flight Objects (ICOG/SWIM) MMHS MIL SWIM Mil Messaging Mission Planning Military Networks Mission Trajectory Management 2010 2013 2017 2020 2025 2030
Voice Communication Roadmap Today Operations with 8.33 ICAO Doc 9896 ed.2 SJU15.2.10 Validation Standards Implem. & Security G/G VOIPV6 Deployment 2010 2013 2017 2020 2025 2030 A/G Voice Equipment 8.33KHz below FL195 Interim Phase Final phase Voice Standard G/G Voice (cf AGVN Database) Analogue Voice Network ATS-R2 ATS QSIG Voice Network Voice Intercentre Telephony (+A/G Voice Ground Segm.) National Voice over IP European-wide Voice Over IPV6 Others VPN- EXT- G/G COM voice & Data (PENS) PENS PENS Extension SWIM SWIM Infrastructure Network X25…………………………IPV4 IPV6…………………………..........................…. 2013 2017 2020 2025 2030 2010
General Spectrum Management Roadmap 2010 2013 2017 2020 2025 2030 Today Recom ITU Spectrum Mananagement WRC WRC Voice HF-Europe (2850-22000kHz) Allocated & Required for Oceanic Allocated & Required to complement and backup SATCOM VHF-voice-Europe (117.975-137 MHz) Allocated & Required (25/8.33kHz channel spacing) Allocated & Required (8.33 kHz channel spacing) Additional spectrum maybe necessary Data VHF Data Europe (112-137MHz) Allocated & Required LDACS Europe (960-1164 MHz) Allocated Allocated & Required SATCOM-Europ (1545-1555.5MHz & 1646.5-1656.5MHz) Required AeroMACS-Europe (5091-5150MHz) Allocated Allocated & Required 2017 2020 2025 2030 2010 2013 2017 2020 2025 2030
Questions on Communication Roadmap? European Organisation for the Safety of Air Navigation