1 / 25

FUTURE LAND USE MAP AMENDMENT LU-MIN-08-01 & RZ-OTH-08-08

FUTURE LAND USE MAP AMENDMENT LU-MIN-08-01 & RZ-OTH-08-08. Background and Location Map. TOTAL 8.5 ACRES Applicant/Owner – Christ the King Evangelical Lutheran Church & Preschool Inc. Background and Location Map. Current FLUM – Ag. & Timberlands, Mixed Use Proposed FLUM – Institutional

Download Presentation

FUTURE LAND USE MAP AMENDMENT LU-MIN-08-01 & RZ-OTH-08-08

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FUTURE LAND USE MAP AMENDMENT LU-MIN-08-01&RZ-OTH-08-08

  2. Background and Location Map TOTAL 8.5 ACRES • Applicant/Owner –Christ the King Evangelical Lutheran Church & Preschool Inc.

  3. Background and Location Map • Current FLUM – Ag. & Timberlands, Mixed Use • Proposed FLUM – Institutional • Current Zoning – COM-3 & Agriculture • Proposed Zoning – Public/Semipublic

  4. EXISTING FUTURE LAND USE MAP • North-Mixed Use • West- Ag. & Timberlands • South-Mixed Use & Ag. & Timberlands • East-Residential

  5. EXISTING ZONING • North- Suburban Estate-1 • West- Agriculture • South- Agriculture & Com-3 • East- Single-family Residential

  6. EXISTING USES • North-Animal Boarding • West-Vacant • South-Vacant • East-Single-family residential

  7. MAXIMUM DEVELOPMENT ANALYSIS

  8. PUBLIC FACILITIES IMPACT ANALYSIS

  9. ENVIRONMENTAL/CULTURAL RESOURCES ANALYSIS • Topography and Soil Conditions • The proposed FLUM change will not negatively impact the surrounding topography. • Floodplains • Any proposed development will comply with the City’s FEMA approved Floodplain regulation.

  10. ENVIRONMENTAL/CULTURAL RESOURCES ANALYSIS • Vegetative Communities • Upland areas exist in sufficient acreage to be developed without impacting on-site wetlands. • Protected Species Distribution/Wildlife Utilization • On-site wetlands provide the bulk of habitat resources. Staff is recommending the on-site wetlands and associated upland buffer be placed in a conservation designation. However, additional assessments will be required for site plan purposes to further verify wildlife utilization.

  11. ENVIRONMENTAL/CULTURAL RESOURCES ANALYSIS • Environmental Sensitive Features • Due to the nature of the connection to off-site wetlands, development of the site will likely not be impacted. • Groundwater Resource Protection • Due to the site’s development intensity remaining relatively the same, it is highly unlikely that the land use activities associated with the proposed FLUM change will impact the potable water supply.

  12. ENVIRONMENTAL/CULTURAL RESOURCES ANALYSIS • Historical Resources • It cannot be concluded at this time that historical resources exist on the subject property due to lack of reference material and on-site investigations; however, existing regulations exist to protect against impact to historical resources during development.

  13. LAND USE COMPATIBILITY ANALYSIS • North-Animal Boarding • West-Vacant • South-Vacant • East-Single-family residential

  14. LAND USE COMPATIBILITY ANALYSIS • North-Mixed Use • West- Ag. & Timberlands • South-Mixed Use & Ag. & Timberlands • East-Residential

  15. CONSISTENCY WITH COMPREHENSIVE PLAN POLICIES • Policy 1.1.1.1 (B) – Institutional – This FLUM designation identifies areas for public and private educational uses, public buildings, offices limited to supporting institutional uses, hospitals, civic uses, churches and religious venues, public safety, service and social clubs …

  16. CONSISTENCY WITH COMPREHENSIVE PLAN POLICIES • Policy 1.1.1.1 (F.) – Conservation – This FLUM provides for preservation of large interconnected wetland systems and other environmentally sensitive areas…

  17. CONSISTENCY WITH REZONING CRITERIA 1. Whether it is consistent with all adopted elements of the Comprehensive Plan. • Staff Finding: Staff finds the proposed rezoning consistent with the Comprehensive Plan. 2. Its impact upon the environment or natural resources. • Staff Finding: Environmental impact will depend upon the development program for the church. Factors that affect the development program and subsequently the environmental features found on the property include but are not limited to the amount of required fill material, based upon the development program, avoidance of encroachment into the floodplain and the timing of water and sewer services to the site. • Staff is recommending that a 2.0 acre wetland along with the designated upland buffer found be assigned a FLUM designation of “Conservation”. The compatible zoning district with “Conservation” is “Preservation.”

  18. CONSISTENCY WITH REZONING CRITERIA 3. Its impact on the economy of any affected area. • Staff Finding: No impact. 4. Notwithstanding any provisions of the land development regulations, its impact upon necessary governmental services such as schools, sewage disposal, potable water, drainage, fire and police protection, solid waste, or transportation systems. • Staff Finding: The proposed rezoning will not negatively impact the available public infrastructure or services.

  19. CONSISTENCY WITH REZONING CRITERIA 5. Any changes in circumstances or conditions affecting the area. • Staff Finding: Voluntary annexations results in changed circumstance requiring the City to designate the parcel in accordance with the City’s land development criteria. 6. Any mistakes in the original classification. • Staff Finding: There were no mistakes made in the original classification.

  20. CONSISTENCY WITH REZONING CRITERIA • 7. Its effect upon the use or value of the affected area. • Staff Finding: The rezoning allows the City to plan for the future of this and the surrounding area. • 8. Its impact upon the public health, welfare, safety, or morals. • Staff Finding: No impacts.

  21. FINDINGS • The proposed FLUM amendment is generally consistent with the Goals, Objectives, and Policies of the adopted Comprehensive Plan.

  22. RECOMMENDATION-FLUM AMENDMENT • Staff recommends the approval of the proposed FLUM amendment from A&T and Mixed Use to Institutional. • Staff recommends that the 2.0 acre wetland and associated upland buffer found along the western border of the parcel be designated Conservation

  23. RECOMMENDATION-FLUM AMENDMENT

  24. RECOMMENDATION-REZONING • Staff recommends the approval of the proposed zoning map amendment from COM-3 and Agriculture to Public/Semipublic Use. • Staff recommends that the 2.0 acre wetland and associated upland buffer found along the western border of the parcel be designated as Preservation.

  25. RECOMMENDATION-REZONING

More Related