Details of the construction procedure elaborated by CERN for the PIMS prototype. PIMS prototype construction experience. Construction sequence for standard rings type 3. Table 1: Construction sequence for standard rings type 3 (1/2). Rough machining: oversize + 1 mm. + 2 mm. + 2 mm. - 2 mm.
E N D
Details of the construction procedure elaborated by CERN for the PIMS prototype PIMS prototype construction experience G. Favre EN/MME
Construction sequence for standard rings type 3 G. Favre EN/MME
Table 1: Construction sequence for standard rings type 3 (1/2) G. Favre EN/MME
Rough machining: oversize + 1 mm + 2 mm + 2 mm - 2 mm G. Favre EN/MME
Table 1: Construction sequence for standard rings type 3 (2/2) G. Favre EN/MME
Construction sequence for pick-up rings G. Favre EN/MME
Table 2: Construction sequence for pick-up rings (1/2) G. Favre EN/MME
Table 2: Construction sequence for pick-up rings (2/2) G. Favre EN/MME
Construction sequence of central ring type 4 G. Favre EN/MME
Table 3: Construction sequence of central ring type 4 G. Favre EN/MME
Table 3: Construction sequence of central ring type 4 G. Favre EN/MME
Construction sequence of central disc type 1, type 3 and & disc type 3 G. Favre EN/MME
Table 4: Construction sequence of central disc type 1, type 3 and & disc type 3 G. Favre EN/MME
Rough machining: oversize + 1 mm G. Favre EN/MME
Rough machining: oversize + 1 mm G. Favre EN/MME