1 / 8

News

News. Ted & Kirsten June 10, 2005 TDWG. Meet Trigger Reps today?. Exotic Trigger Reps: Vadim and Oscar doing great work QCD Trigger Rep: Mary herself EWK Trigger Reps: have one “good candidate” Top Trigger Reps: have one “good candidate”

ismail
Download Presentation

News

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. News Ted & Kirsten June 10, 2005 TDWG

  2. Meet Trigger Reps today? • Exotic Trigger Reps: Vadim and Oscar doing great work • QCD Trigger Rep: Mary herself • EWK Trigger Reps: have one “good candidate” • Top Trigger Reps: have one “good candidate” • B Trigger Reps: have “several good candidates” Deadline: find your trigger reps by next TDWG meeting!

  3. Plans to train trigger experts • Will have meetings dedicated to training: Level 1 and 2 and 3 • Invite trigger experts to explain trigger system from trigger table point of view: tracks, electrons, muons, JETs, ScalerMon, XMON … etc. • Have trigger reps involved in documentation • Have trigger reps deeply involved in trigger table design, implementation, table testing and performance analysis, to speed up the process • Each trigger rep is expected to become an expert on at least one trigger subsystem: understand and monitor the lower level triggers and their behaviors … How to improve the communication, speed up trigger table testing?

  4. Improving the procedures for trigger table testing… • (1) Trigger heads come up with a list of changes, with help from Trigger Reps. Each new trigger have a name behind it (who will check it offline). • (2) Once the new table is made, Trigger Reps should carefully check the changes for their own triggers. Then we request for beam test. • (3) Trigger heads and trigger Reps (take turns) perform the actual beam test in the control room. Check the rates. • (4) Once the data is taken and processed, each trigger reps should make sure that the data is looked upon for their triggers within one week. • (5) Report the results back to trigger heads… The details of each step should be posted in the trigger table e-log! This is just initial thoughts, let’s finalize the procedures at next meeting (Kirsten will be back next Monday)

  5. New High Lumi Table performance • New High Lumi table performance offset by CAL LER update Date: April 29 May 21 June 2 Run: 197186 198416 198881 Table: old old new CAL LER Update: No YES YES L1A 9KHz @104E30 12KHz 12KHz L2A 290Hz 340Hz 290Hz L3A 70Hz 80Hz 70Hz DT: 0.6% 1.5% 1.7%

  6. Other News • L1 transverse mass firmware ready! Need a plan for commissioning. See Christopher’s talk. • XMON is doing well. Charles will give an update soon • Good progress on “Straw Trigger Table” study • See Vadim’s talk on June 7th at RunIIb Physics Trigger meeting • tools developed can be soon apply to other triggers … • New version of L2 build script without building Alpha executable (Daniel). Now it runs in ~ 30 seconds (was ~10 mins).

  7. Plan for next two weeks • Move the changes for high lumi into default • Need B group’s plan for reducing J/Psi to mumu rate • Need EWK group’s plan for high Pt J/Psi to mumu … etc (See Chris Hays talk) • Get remaining test triggers into default table • Show your results on the test run (198597) for PHYSICS_TEST_3_02[9,656,571] • Chris Neu’s talk (?) on Z to bbbar • How about others? * Start expanding # of L2 bits from 128 to 192 (Daniel coordinates this effort) * Commission the L1 transverse mass cut and adjacent linker veto

  8. Goals for this summer • Include the remaining test triggers into default table • Finish L2 bits expansion (128 to 192 bits) • Offline code available for handling prescaled trigger • Have the L1 Mt cut and adjacent linker veto working in physics table • Testing/implementing CLC multiplicity trigger • Goal: have a default table good to 150E30 while fully efficient at low lumi. • Prototyping an unified trigger table, and first use it to measure the system performance with the new EVB…. to see where is the next new wall. It should be flexible enough to test the system performance with new SVT as well. This summer will be exciting. Great time for young people to get involved...

More Related