An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OPS IMP Inspection Process Workshop on the Integrity Management Rule for Large Liquid Pipelines Paul Wood August 7, 2001

  2. OPS Process Implemented in Stages • Initial Review Focused on Presence of Framework Containing All Program Elements • Appropriate Decision Processes • Reasonable Plan for Improvement • Success in Initial Review will not Imply Long-Term “Acceptability”of Operator’s Process

  3. OPS Process Implemented in Stages, cont. • Subsequent Reviews will Examine Operator Performance against “Roadmap” in Framework • Will Examine Improvements in the Process

  4. Comprehensive Review of Baseline Assessment Plan & IM Framework Objectives: • Inspect for Compliance with Requirements of Baseline Assessment Plan and IM Framework • Promote Continuous Improvement

  5. Features of Inspection Process • Focused at Company Level (Not Region-by-Region) • Separate from Normal Compliance Inspections • Multi-Discipline, Multi-Region Teams will Conduct Inspections • Reasonable Team Size Requires Focused State Participation

  6. Inspection Process Issues • Evaluation Basis & Consistency • The Inspection Process Itself • Team Composition & Expertise • Nature of Feedback to Operators • Schedule • Enforcement (Addressed Later by Chris Hoidal)

  7. Evaluation Basis & Consistency • Criteria being Developed to Guide Evaluation of Performance-Based Aspects • Examine Operator Data Collection & Analysis Process • Examine Operator Analytical Processes • Examine Effectiveness of Operator Processes • Criteria will Evolve with Time & Allow Some Implementation Flexibility • Quality Documentation of Inspection Results is Essential to Support Follow-up Inspections.

  8. Inspector Expertise • Pipeline Design & Operations • Assessment/Inspection Technology • Management Systems & Processes • Risk Analysis Methods

  9. Type of OPS Feedback to Operators • Direct Operator to Modify Program to Address Clear Deficiencies • Identify Aspects of Process or Tools to Consider Modifying • Encourage Operator to Consider Adopting “Noteworthy Practices” • Promote Consideration of Use of Demonstrated New Technologies

  10. OPS Inspection of Operator IM Program Implementation • Confirmation of Integrity Assessments • Confirmation of Repairs • Review of “Notifications” • Review of Assessment Results and Integration with Other Data • Review Basis for Repair Method Selection and Schedule

  11. OPS Inspection of Operator IM Program Implementation, Cont. • Review Operator Risk Analysis and Determination of Need for Additional Risk Controls (e.g., EFRDs and leak detection enhancements) • Review Basis for Re-assessment Method Selection and Schedule • IM Program Development • Operator’s Internal Performance Evaluation

  12. Separate vs Integrated Inspection • Some Aspects could be Integrated with Standard Inspections • Other Aspects may be Better Performed in Separate, In-depth Inspections • Expect Evolution from Entirely Separate Inspections to Largely Integrated with Standard Inspections

  13. Scheduling On-going IM Program Implementation Inspections • Base Frequency on Results of Inspection of Comprehensive Plan and Framework • Program Maturity and Quality • Operator Performance • Progress in Implementing Assessment Plan • May Involve Multiple Company Locations • Complete One Round of IM Program Implementation Inspections by 9/30/04 (for large liquid operators)

More Related