1 / 10

Ind-Barath Group

Ind-Barath Group. Group Structure Has grown under the leadership of Mr. K. Raghu, Promoter, Chairman & Managing Director. . Power & Energy has been the ONLY focus of the Promoters. Various Project SPVs. PT Ind Bharath Energy. . Power generation as well as the mining assets housed

ita
Download Presentation

Ind-Barath Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ind-Barath Group

  2. Group Structure Has grown under the leadership of Mr. K. Raghu, Promoter, Chairman & Managing Director  Power & Energy has been the ONLY focus of the Promoters Various Project SPVs PT Ind Bharath Energy  Power generation as well as the mining assets housed under subsidiaries of IBPIL Private equity investor base - Citi Venture Capital Investments (“CVCI”), Sequoia Capital, Bessemer Venture Partners (“BVP”) and UTI Ventures [At holdco level] and 3i [at SPV level]  Projects Under Construction 1830 MW Total: 3546 MW Projects in Planning Stage 1340 MW Coal Mines in Indonesia 32.5 million tonnes of coal resources Operational Projects 376 MW  FOCUSSED BUSINESS APPROACH, PROVEN RECORD, ALL PROJECTS ON TRACK…. IBPIL ALL SET IN THE GROWTH PATH !

  3. Corporate History Corporate History ▪Fin. closure of IBPML – 660 MW.▪ Financial closure of IBTPL Expansion – 1x150 MW. ▪ USD45 million Investment from 3i More than a decade of Experience in developing power projects IBPIL has commissioned 376 MW of projects at 8 different sites across 5 states with varied fuel Base [113 MW – Gas; 189 MW – Coal ; 74 MW - RE ] Successfully raised over US$200 million in 3 rounds of funding from Private Equity funds in 2007, 2009 and 2011    PLANNED GROWTH....PLANNED RESOURCE MOBILISATION ….PLANNED BANDWDTH MANAGEMENT

  4. Overview of Power Projects • IBPIL has experience in • Successfully commissioning power projects across the country with varied fuel types –coal, gas, biomass, hydel and wind Total Operational Capacity 376 MW DHPL - Hydro Total Under 1830 MW Construction Operational Capacity 10 MW Mauji, Himachal Pradesh Total Under Planning 1,340 MW   IBPML (660MW), IBPGL (189MW) and IBTPL (450MW) projects strategically located near Thootukudi (Tuticorin) port with access to imported coal IBEUL (700MW) project located near Mahanadi Coalfields with proximity to Coal mines IBEL, RRREL, IBETL, IBEML – Biomass / Coal Operational Capacity 64 MW IBPIL - Wind Operational Capacity 0.8 MW IBPML – Coal Maharashtra Orissa, Utkal Andhra Pradesh Tamil Ramnathpuram Ramnad Thootukudi Port Thoothukudi IBTPL - Coal IBEUL – Coal Under Construction 700 MW Planning Stage 660 MW AERL – Natural Gas Operational Capacity 113 MW under expansion 18 MW IBPGL - Coal Significant existing capacity offers a scalability to the business model to propel further expansion Nadu Kerala Under Planning 18MW  IBPIL was a pioneer in setting up projects as group captives/Third party Operational Capacity 189 MW Under Construction 450 MW Under Construction Planning Stage 660 MW 660 MW FOOT PRINTS IN MIX OF FUELS…GEOGRAPHICAL DIVERSIFICATION….LOCATIONAL ADVANTAGES 9

  5. Long History of Proven Track Record in Implementing Projects Strong project execution capabilities  Significant existing capacity offers a scalability to the business model to propel further expansion  TOTAL

  6. Projects in Advanced Stages of Implementation Strong project execution capabilities  Strong pipeline of projects under Construction  Financial closures achieved and EPC contracts in place for projects under construction Land, a critical project enabler, acquired for all of the projects under construction  

  7. Indonesian Mines Thoothukudi Imported Coal            IBPIL’s subsidiary, PT Ind Bharath Energy, has the right to operate which hold estimated coal resources of 32.5MT   All the mines are in South Kalimantan in Batulicin area within 80km distance of each other and 30-40 Km away from nearest jetty. Expected commencement of mining operations by March 2012 to be supplied to group coast based projects 10  A STRATEGIC MOVE ENSURING LONG TERM FUEL SECURITY FOR THE PLANTS

  8. GROUP CONSOL FINANCIALS Sound financial track record registering healthy growth due to new capacity additions Figures in Million USD, (1USD = INR 45)

  9. VERSATALITY + EXPERIENCE + TECHNOLOGY = IND BARATH EXPERIENCE AND TRACK RECORD COLLABORATION WITH REPUTED VENDORS WELL EXPERIENCED HUMAN RESOURCES TECHNOLOGY [SUPER CRITICAL, CFBC, ACC] COST MANAGEMENT OF PROJECTS VERSATALITY IN BUSINESS MODEL

  10. THANK YOU……

More Related