Functional (Performance-based) Maintenance Contracting in Denmark. By Susanne Baltzer Danish Road Directorate Denmark. Standard Danish Contracts. Road authority sets requirements for mix design, and some performance requirements 5 year warranty period for new asphalt concrete layer.
E N D
Functional (Performance-based) Maintenance Contracting in Denmark By Susanne Baltzer Danish Road Directorate Denmark
Standard Danish Contracts • Road authority sets requirements for mix design, and some performance requirements • 5 year warranty period for new asphalt concrete layer
Principles in Performance Contracts • Road authority describes performance requirements • Contractor decides product and time of laying • Road authority buys service level – not asphalt! • Long contracts, typically 15 years • Equal yearly payment
What does the contract cover? Maintenance of: • Paved roads • Shoulders and open drainage systems • Road marking • Bicycle tracks and footpaths
New procurement template Contractor
User Performance requirements based on data from PM-systems Pavement condition VEJMAN registre PM Vejman.dk
Also requirements to ... Friction Longitudinal Evenness Rutting Potholes Light reflection Road marking
Shoulders and DrainageTraffic safety and water run-off Max/min edge
Penalty / Bonus system • Exceeding the mean condition index for one or more maintenance levels • => no payments that year • Exceeding all other requirements • => penalty of Euro 1,000 - 3,000, if not OK after period of reconditioning • Bonus ?? The contract can be prolonged e.g. by 4 years
Why is it advantageous for the municipality ? • Better price • Equal yearly payment – fixed ! • Quick improvement of network standard • Maintenance level is ensured • Lack of ressources/expertice
Accounting standards in municipalities • Roads and assets belong to road authority • In the accounting system, the asset of existing roads stays unchanged as long as they remain serviceable • Wearing courses and services included in these contracts are not considered investments, - only maintenance.
Municipality Contracts 2006 • 19 contracts • Of 30-300 km • total of >3000 km
Performance based contracts generates development! • As contractors are not restricted to certain mix designs, • they use ”their network” for experiments • There is a an incentive for producing long-lasting pavements