1 / 23

Functional (Performance-based) Maintenance Contracting in Denmark

Functional (Performance-based) Maintenance Contracting in Denmark. By Susanne Baltzer Danish Road Directorate Denmark. Standard Danish Contracts. Road authority sets requirements for mix design, and some performance requirements 5 year warranty period for new asphalt concrete layer.

italia
Download Presentation

Functional (Performance-based) Maintenance Contracting in Denmark

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Functional (Performance-based) Maintenance Contracting in Denmark By Susanne Baltzer Danish Road Directorate Denmark

  2. Standard Danish Contracts • Road authority sets requirements for mix design, and some performance requirements • 5 year warranty period for new asphalt concrete layer

  3. Administrative Units 2006

  4. Principles in Performance Contracts • Road authority describes performance requirements • Contractor decides product and time of laying • Road authority buys service level – not asphalt! • Long contracts, typically 15 years • Equal yearly payment

  5. What does the contract cover? Maintenance of: • Paved roads • Shoulders and open drainage systems • Road marking • Bicycle tracks and footpaths

  6. New procurement template Contractor

  7. User Performance requirements based on data from PM-systems Pavement condition VEJMAN registre PM Vejman.dk

  8. Visual survey of road condition

  9. Condition SurveyCondition index

  10. Condition Index = 1,5

  11. Condition Index = 5

  12. Condition Index = 15

  13. Performance Requirements

  14. Max. Percentage of Patching

  15. Also requirements to ... Friction Longitudinal Evenness Rutting Potholes Light reflection Road marking

  16. Shoulders and DrainageTraffic safety and water run-off Max/min edge

  17. Penalty / Bonus system • Exceeding the mean condition index for one or more maintenance levels • => no payments that year • Exceeding all other requirements • => penalty of Euro 1,000 - 3,000, if not OK after period of reconditioning • Bonus ?? The contract can be prolonged e.g. by 4 years

  18. Payment Model

  19. Why is it advantageous for the municipality ? • Better price • Equal yearly payment – fixed ! • Quick improvement of network standard • Maintenance level is ensured • Lack of ressources/expertice

  20. Accounting standards in municipalities • Roads and assets belong to road authority • In the accounting system, the asset of existing roads stays unchanged as long as they remain serviceable • Wearing courses and services included in these contracts are not considered investments, - only maintenance.

  21. Municipality Contracts 2006 • 19 contracts • Of 30-300 km • total of >3000 km

  22. Performance based contracts generates development! • As contractors are not restricted to certain mix designs, • they use ”their network” for experiments • There is a an incentive for producing long-lasting pavements

  23. Thank you for your attention sub@vd.dk