Ankle Linear Force Comparison

Ankle Linear Force Comparison. Risk Assessment. Plan B Actions (for those with importance rating of 4 or higher). Failure of the device while air muscles are activated Allow for the air system to be easily disconnected (quick connects)

ivan
Download Presentation

Ankle Linear Force Comparison

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ankle Linear Force Comparison

  2. Risk Assessment

  3. Plan B Actions(for those with importance rating of 4 or higher) • Failure of the device while air muscles are activated • Allow for the air system to be easily disconnected (quick connects) • Allow for the air system to be easily shut-off in case of an unexpected design failure • Pressure source attachment point failure • Allow for the air muscles to be quickly connected to the AFO by a commonly used material (zip ties) • Supply the clinic/setting with spare muscle assemblies • Popping the pressure-fed air muscles when too little or too much force is applied • Supply the clinic/setting using this device with spare air muscle assemblies • Inadequate material durability • Supply the clinic/setting using this device with spare air muscle assemblies NOTE: Due to the clinical setting of our patients, these actions are not of much concern as the patient is in a safe environment where the device can be easily manipulated and fixed

  4. Project Schedule • Upcoming priority deadlines: • Fall Quarter Week 9: Detailed Design Review Reference EDGE website for working, detailed project schedule: • Planning and Execution – Project Plans and Schedules – “Schedule of Action Items”