Ankle Linear Force Comparison. Risk Assessment. Plan B Actions (for those with importance rating of 4 or higher). Failure of the device while air muscles are activated Allow for the air system to be easily disconnected (quick connects)
E N D
Plan B Actions(for those with importance rating of 4 or higher) • Failure of the device while air muscles are activated • Allow for the air system to be easily disconnected (quick connects) • Allow for the air system to be easily shut-off in case of an unexpected design failure • Pressure source attachment point failure • Allow for the air muscles to be quickly connected to the AFO by a commonly used material (zip ties) • Supply the clinic/setting with spare muscle assemblies • Popping the pressure-fed air muscles when too little or too much force is applied • Supply the clinic/setting using this device with spare air muscle assemblies • Inadequate material durability • Supply the clinic/setting using this device with spare air muscle assemblies NOTE: Due to the clinical setting of our patients, these actions are not of much concern as the patient is in a safe environment where the device can be easily manipulated and fixed
Project Schedule • Upcoming priority deadlines: • Fall Quarter Week 9: Detailed Design Review Reference EDGE website for working, detailed project schedule: • Planning and Execution – Project Plans and Schedules – “Schedule of Action Items”