170 likes | 265 Views
Edit this text for your title. Planer for MEK 4450 Marine operasjoner. Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA, June 2011. Lift phases. Load out Transportation Over boarding Removal of sea fastening Lift up Lifting route Start lowering
E N D
Edit this text for your title Planer for MEK 4450 Marine operasjoner Edit this text for your sub-title Presenter name, location, date etc. Kværner ASA, June 2011
Lift phases Load out Transportation Over boarding Removal of sea fastening Lift up Lifting route Start lowering Splash-zone Slamming Wave impacts Lowering Softer system,- resonance Landing Positioning
Deck layout Deck area Deck strength Lifting route
Sea fastening Limiting weather criteria (transit, WoW) Low complexity Easy, swift and cost effective installation Swift removal. Minimized need for hotwork during removal
Lifting from deck of vessel Well defined route of lift. Static capacity of crane (DAF=1.3?) Clearance to ships side Restraining load from unwanted motions Test lift for all complex routings! Vessel ballasting. Vessel roll reduction not to be used. Slewing before luffing. Sufficent analysis performed?
Splash zone Often dimensioning for crane force Vessel listed towards lifted object Bouyancy reduces mass of object Ballasting of vessel Crane wire tension Sufficient time for air to evacuate No use of AHC Stability of lifted object Internal tanks Air filled compartment
Further lowering Is the total duration understood? Fatigue issues on the load Effects on the crane and wire Load rotation control Increased weight of the wire. Generally no use of AHC Deep water resonance Deep water effects
Landing Position control vs tolerances Position, Heading and Inclination Landing speed Damage module Soil damage (stiff clay) Reduction of tension in crane wire Vessel movement and ballasting Capacity of AHC Disconnection of rigging
Recovery Rigging connection points Suction effects from seabed Water escapation Crane capacity Load control and means of load motion restraints Sufficient deck space Disconnect rigging Seafastening