50 likes | 172 Views
IEC Compound, part B and C. Concrete pad, 10 x10 m. Warehouse. Bldg No 5. Bldg No 4. Crossroad cutting details. 85 m. 32.6 m. 32.6 m. 8 m. 8 m. 8 m. 8 m. 8 m. 8 m. Cutting A-A. 20 m. 20 m. 24.4 m. 13.5 m. 21.1 m. 18 m. 24.5 m. 25 m. 35 m. 11 m. 47 m. 20 m. 288 m.
E N D
IEC Compound, part B and C Concrete pad, 10 x10 m Warehouse Bldg No 5 Bldg No 4 Crossroad cutting details 85 m 32.6 m 32.6 m 8 m 8 m 8 m 8 m 8 m 8 m Cutting A-A 20 m 20 m 24.4 m 13.5 m 21.1 m 18 m 24.5 m 25 m 35 m 11 m 47 m 20 m 288 m 8.5 m 8 m 8 m Metal Gate 8 m VMU 68 m 10 m 26 m UNOPS Compound IEC Vehicles Parking Place VMU 45 m 12 m 6.3 m
Main Entrance Road Cutting(A-A) 10,80 m slope of plane- 3-5 degrees 0,25 m 10 m 0,15 m Kerbs stone, Layer of Concrete Steel mesh fabric reinforcement 0,15 m Layer of gravel
Driveways Cutting(to the Office buildings) 3,5 m slope of plane- 3-5 degrees 0,25 m 2,7 m Kerbs stone 0,15 m Layer of Concrete 0,15 m Layer of gravel
Drive ways Cutting(to the parking place, Vehicle Maintenance Unit, Warehouses, Power Sub Station and storage areas) 5,80 m slope of plane- 3-5 degrees 0,25 m 5 m 0,15 m Kerbs stone, Layer of Concrete Steel mesh fabric reinforcement 0,15 m Layer of gravel
Crossroad Cutting Main Road Center line Driveway Center line Drainage Channel Kerbs Stone R = 1.5 m R = 1.5 m