HIGHWAY RANKING MODEL

HIGHWAY RANKING MODEL. HIGHWAY RANKING MODEL. – Based on Future Congestion and Its Relief Per Cost – (Congestion Relief is only one of many criteria for selecting projects for construction). Bill Mann, P.E. Transportation Planning Section Northern Virginia District July 25, 2006.

jaeger
Download Presentation

HIGHWAY RANKING MODEL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HIGHWAY RANKING MODEL HIGHWAY RANKING MODEL – Based on Future Congestion and Its Relief Per Cost – (Congestion Relief is only one of many criteria for selecting projects for construction) Bill Mann, P.E. Transportation Planning Section Northern Virginia District July 25, 2006

  2. HIGHWAY RANKING MODEL PURPOSE • No standardized model exists to objectively rank highway improvements. • VDOT has developed a method to do this ranking. • The method piggybacks off MPO traffic forecasting models to rank highway projects. • This tool is just one objective tool in the final ranking process that addresses gridlock.

  3. HIGHWAY RANKING MODEL WHY RANK IMPROVEMENTS? • There is a funding shortfall of $15 billion to meet • the needs of the 2030 Transportation Plan for the • Northern Virginia District. • [TransAction 2030, January, 2006]

  4. HIGHWAY RANKING MODEL • INPUTS (Nothing New is Required) • Area’s Future Highway Networks (Transit networks may be added in later model versions.) • Area’s Future Highway Trips • Improvement Costs • OUTPUTS (Two Ways of Measuring Benefit/Cost Ratios) • Option 1 - Ranking of Improvements by Vehicle Hours of Delay (VHD) Reductions (above LOS _) Per Cost • Option 2 - Ranking of Improvements by Vehicle Miles of Travel (VMT) (above LOS _) Reductions Per Cost • Note: Thresholds for both options are user defined (LOS C, D, E, F, G)

  5. HIGHWAY RANKING MODEL • CODING REQUIRED FOR RANKING • (Took about two weeks for Northern Virginia) • For each network link affected, code: • -- ID Number • -- New Lanes (if needed) • -- New Functional Class Code (if needed) • Provide table of construction costs for each improvement ID • ______________________________________________ • Note: Once all CLRP elements are coded, one could rank selected elements for any forecast year.

  6. HIGHWAY RANKING MODEL MODELING PROCESS (Assumes 70 Improvements as Identified in the CLRP) • Phase I (First Iteration; 70 Individual Assignments) • Calculate VHD for Base Network (with no improvements). • Add Improvement No. 1 to Base and calculate VHD Reductions with this Improvement. • Delete Improvement No. 1 and add Improvement No. 2 to Base; Calculate VHD Reductions with this Improvement. • Repeat Step 3 until all 70 improvements are tested. • Rank all 70 improvements based on their VHD Reductions/Cost.

  7. HIGHWAY RANKING MODEL MODELING PROCESS (Cont’d.) • Phase II (Second Iteration; 69 Individual Assignments) • Add the highest-ranked Improvement from Phase I to the Base Network to get a new Permanent Base. • Calculate VHD for the new Permanent Base. • Repeat Steps 2 through 5. • Remaining 68 Phases • Do 68 Individual Assignments, then 67, 66, etc. • Repeat Steps 6 through 8 until all 70 improvements are ranked. • Summarize results.

  8. HIGHWAY RANKING MODEL MODEL OUTPUTS • Phase I Output shows for each improvement when compared to the • Base the following (tested individually): • -- UserBenefits • 1) Vehicle hours of delay reductions (VHDR) or • 2) VMT at LOS F reductions (VMTR) • -- Construction Costs • -- User Benefit/Cost Ratio expressed as VHDR/C or VMTR/C • ________________________________________________________________________ • Phase II Output shows for each improvement as it is incrementally • added to Base (synergistic effect) what its contribution is relative • to the entire plan: • -- User Benefits (VHDR or VMTR) • -- Construction Costs • -- User Benefit/Cost Ratio

  9. HIGHWAY RANKING MODEL ADVANTAGE OF MODELING IMPROVEMENTS • Improvement A and Improvement B might both be • excellent improvements by themselves based on • gridlock relief per cost. • If A is implemented first, the regional benefits of B • might diminish and may not reduce regional • congestion any further on the regional system until • post-2010/2030. • This process most likely spreads the ranking of • improvements around the region, irrespective of • geography or political boundaries.

  10. HIGHWAY RANKING MODEL WHY HASN’T THIS BEEN DONE BEFORE? • It is cost prohibitive without new software. • One would have to code thousands of computer networks • and run thousands of computer traffic assignments to • rank 70 improvement projects in CLRP (e.g., 70 + 69 + 68 • + 67 + 66 + 65 + etc.) = 2485 runs. • Coding and running 3 networks and 3 traffic assignments • per week in sequential order is all one could do with • traditional modeling techniques. • This approach would take years to accomplish manually.

  11. HIGHWAY RANKING MODEL EXECUTION TIME WITH NEW VDOT MODEL -- 6 days of computer time to rank 70 improvement projects in Northern Virginia CLRP using a PC with Intel 3.06 GHz processor.

  12. HIGHWAY RANKING MODEL THE NEXT SLIDES SHOW REAL SAMPLE RESULTS • VDOT’s Central Office selected 52 Northern • Virginia District arterial candidates for possible • inclusion in the next Six-Year Plan. • These were run through the Highway Ranking • Model using 2005 trips from MWCOG.* • (We could have used 2010 trips.) • *MWCOG=Metropolitan Washington Council of Governments

  13. HIGHWAY RANKING MODEL

  14. HIGHWAY RANKING MODEL RANKING RESULTS EXAMPLE: Project 24 reduces 347 vehicle hours of delay (daily) per construction cost ($ millions). Final Output showed that after adding the top 16 improvements, the bottom 36 did little to reduce VHD.

  15. HIGHWAY RANKING MODEL COST EFFECTIVENESS OF IMPROVEMENTS NOTES: 1. This is total cost ($) divided by the vehicle hours of delay saved assuming an interest rate of 5% per year for annualizing capital investments. 2. Delay is measured if LOS D or worse. LOS is user defined.

  16. HIGHWAY RANKING MODEL WHO IS AFFECTED BY IMPROVEMENTS? • COLLECTOR ROADWAYS. Users living in the • immediate area and those using the road and • parallel roads. • FREEWAYS. This can affect users from parallel • roads as far away as 10 miles.

  17. HIGHWAY RANKING MODEL WHERE DOES ALL THE NEW TRAFFIC COME FROM? • In modeling (and in the real world) a roadway • widening could result in a LOS F after the widening • with great benefits to the road and on parallel roads. • Someone may ask: Where did all this “new” traffic • come from? It came from the three “S”s: • -- mode shift, • -- time shift, and • -- diversion shift.

  18. HIGHWAY RANKING MODEL MODEL OUTPUT CORRELATES WITH TTI DATA FOR 2003 NETWORK • Texas Transportation Institute (TTI) estimates 69 hours • of delay per year, per peak period traveler in 2003. • [Source: Washington Post, May 10, 2005] • VDOT/COG model estimates 108 hours of delay per • year, per peak period traveler in Northern Virginia. • ________________________________________________ • Explanation of Differences: • TTI measures delay on Freeways and Major Arterials only. • VDOT measures delays on all roadways, including Minor • Arterials and Collectors.

  19. HIGHWAY RANKING MODEL RECOMMENDED APPROACH FOR IMPROVED TRANSPORTATION PLANNING PROCESS • Rank all plan elements (Comp, CLRP, SYIP) • using future land uses, trips and networks by • forecast year. • For those at bottom half of priority list, investigate • to see why they are low in the ranking. What could • be changed to improve their ranking? • Take results to decision makers for plan updates. • This is an ongoing, continuous, iterative process.

  20. HIGHWAY RANKING MODEL EXAMPLE OF IMPROVED TRANSPORTATION PLANNING PROCESS (Post Processing) ROUTE Z SUBURBS A • Project: Widen Route Z from 4 lanes to 6 lanes; grade separate 3 intersections. • Ranking Model Results: Low • Analysis: Delete interchanges. • Results: Less VHDR, less cost, but benefit/cost ratio improves. • Plan Update: Widen roadway now but postpone building interchanges until after 2020/2030 when LOS drops to F/G based on forecast 2020/2030 land uses. B C ACTIVITY CENTER

  21. HIGHWAY RANKING MODEL OUTPUT OPTIONS • Rank all improvements or only selected improvements. • Rank selected Functional Classification improvements • (Freeways, Major Arterials, and/or Collectors). • Example: Rank only primaries assuming: • -- All planned secondary and freeway improvements • are built, or • -- All planned secondary and freeway improvements • are not built.

  22. HIGHWAY RANKING MODEL OUTPUT OPTIONS (Cont’d.) • Select threshold for LOS delays. • Rank improvements based on: • -- VHD Reductions • -- VHD Reduction/Cost • -- VMT at LOS F Reductions • -- VMT at LOS F Reductions/Cost • Select small or large area or specific jurisdictions • for comparing VHD Reductions.

  23. HIGHWAY RANKING MODEL CONCLUSION With new and better computer models, we can now help decision makers: • Maximize area-wide traveler benefits at minimum • cost • Develop more cost effective transportation plans

  24. HIGHWAY RANKING MODEL Thank You! Questions? Comments ?

  25. HIGHWAY RANKING MODEL CONTACT INFORMATION HIGHWAY RANKING MODEL Bill Mann Bill.Mann@VDOT.Virginia.gov 703-383-2211 Mazen Dawoud Mazen.Dawoud@VDOT.Virginia.gov 703-383-2229