Version 4: Illinois TRM Final TRM Update List 24 th June 2014

Version 4: Illinois TRM Final TRM Update List 24 th June 2014. TRM Request Tracker. Thank you for updating your tracker items! Since last call 11 removed from list leaving: On-hold - 36 Open - 57 High – 32 [18 Exist, 10 New, 4 Question] Medium – 18 [4 Exist, 14 New]

jaimie
Download Presentation

Version 4: Illinois TRM Final TRM Update List 24 th June 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Version 4: Illinois TRM Final TRM Update List 24th June 2014

  2. TRM Request Tracker • Thank you for updating your tracker items! • Since last call 11 removed from list leaving: • On-hold - 36 • Open - 57 • High – 32 [18 Exist, 10 New, 4 Question] • Medium – 18 [4 Exist, 14 New] • Low – 7 [1 Exist, 6 New] • About 2/3rd open items Commercial/ Industrial, 1/3rd Residential /Multifamily Version 4.0: Illinois TRM. Item Prioritization

  3. Impact of Open Measures on Budget • Budget was set up for 40 tracker items • We have reviewed the measures and if set at current budget we would suggest: • Include 32 High Priority • Include 4 medium existing changes and pick 4 of the new • Not included: 10 new medium and 7 low • Based on the measures, we can address all 57 in the time frame for the V4.0 update. • Hour impact – 128 hours • Budget impact - $21,400 Version 4.0: Illinois TRM. Item Prioritization

  4. Now we need work papers… New simplified format of the work papers: • Summary of new measure or change • If new measure – blank template to provide content • If existing measure – copy version from V3.0 and apply redline changes. (Add ‘comment’ for additional context that should not be in final characterization) • Section for stakeholder input Version 4.0: Illinois TRM. Item Prioritization

  5. Who and by when (assumes 57 items)? August 1: Work papers for existing measures will  be completed October 1: Work papers for new measures will be completed Let us know ASAP if you are unable to create work paper for your issue – e.g. because the original modeling was performed by another party. Version 4.0: Illinois TRM. Item Prioritization

  6. High Priority Version 4.0: Illinois TRM. Item Prioritization

  7. Medium Version 4.0: Illinois TRM. Item Prioritization

  8. Low Priority Version 4.0: Illinois TRM. Item Prioritization

  9. On-hold? • “New measure request for adding doors to refrigerated cases” - equivalent to “Night Covers - Refrigerated Display Case” (Open/Low)? • “Variable Refrigerant Flow” and • “Cycling refrigerated compressed air dryer”– apparent activity last round Presentation title to go here