BLT-Standalone Analysis. Checkout Runs Summary. Run#401395. North MUID. Trigger Timing Check. No obvious cut off. Number of Tubes. nroads. ~1300 entries @ nroads =2882. 1222 entires 0< n roads <50. RadioGraph for large nroads >1000.
E N D
Run#401395 North MUID
Trigger Timing Check No obvious cut off Number of Tubes
nroads ~1300 entries @ nroads=2882 1222 entires 0<nroads<50
RadioGraph for large nroads>1000 Looks somehow systematic pattern. Remove from the consideration anyway since nroads>1000 sounds too unrealistic.
RadioGraph (nroads<50) No horribly hot area. Don’t apply any mask.
Run#401438 South MUID
QA Cut off Number of Tubes
Number of Roads ~900 entries 50<nroads<200
RadioGraph Hot Spots Removed nroads<50
Summary • North has many large nroadsentires. • South has hot area. • RadioGraph looks good after removing large nroads and hot area. • # of roads are found 60/min for North, 300/min for South. Takes 4 hours/run to achieve 80k goal.