1 / 13

BLT-Standalone Analysis

BLT-Standalone Analysis. Checkout Runs Summary. Run#401395. North MUID. Trigger Timing Check. No obvious cut off. Number of Tubes. nroads. ~1300 entries @ nroads =2882. 1222 entires 0< n roads <50. RadioGraph for large nroads >1000.

Download Presentation

BLT-Standalone Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BLT-Standalone Analysis

  2. Checkout Runs Summary

  3. Run#401395 North MUID

  4. Trigger Timing Check No obvious cut off Number of Tubes

  5. nroads ~1300 entries @ nroads=2882 1222 entires 0<nroads<50

  6. RadioGraph for large nroads>1000 Looks somehow systematic pattern. Remove from the consideration anyway since nroads>1000 sounds too unrealistic.

  7. RadioGraph (nroads<50) No horribly hot area. Don’t apply any mask.

  8. Run#401438 South MUID

  9. QA Cut off Number of Tubes

  10. Number of Roads ~900 entries 50<nroads<200

  11. RadioGraph Hot Spots Removed nroads<50

  12. RadioGraph (After removed hot area)

  13. Summary • North has many large nroadsentires. • South has hot area. • RadioGraph looks good after removing large nroads and hot area. • # of roads are found 60/min for North, 300/min for South. Takes 4 hours/run to achieve 80k goal.

More Related