uf076 What I discuss in this section <br>1. Asphalt paving work process 1 Roadbed 2. Asphalt paving work process 2 Underground roadbed 3. Asphalt paving work process 3 Upper layer roadbed 4. Asphalt paving work process 4 stratum 5. Asphalt paving work process 5 Surface layer 6. My Company Introductio
E N D
Durability Years will be Shortened of Asphalt Pavement Next Next
What I discuss in this section 1. Asphalt paving work process 1 Roadbed 2. Asphalt paving work process 2 Underground roadbed 3. Asphalt paving work process 3 Upper layer roadbed 4. Asphalt paving work process 4 stratum 5. Asphalt paving work process 5 Surface layer 6. My Company Introduction 7. Our Services 8. How We Can Be Found? Previous Next Next
MEANING OF BASIC ASPHALT PAVEMENT PROCEDURE AND PROCESS When you want to pave your driveway or parking lot you have to follow these necessary steps. Asphalt pavement construction has roughly divided into five stages, “Roadbed”, “Underlying Road”, “Upper Road”, “Substrate” and “Surface” from the bottom. Here, l will explain the contents of each process together with the effects obtained by that process. Previous Next Next
Asphalt paving work process 1 Roadbed It is the lowest layer of pavement, laying the part called “roadbed”. Since the roadbed is located at a depth of about 1 meter (for commercial use and it increases or decreases according to the use) from the road surface, I start with digging work to dig into that depth. Now you have need to lay sand in the ditches that have been dug and build a foundation for paving. Since the load on the pavement surface will eventually be received on this road floor, if the road floor is weak, problems such as ground subsidence may occur. If the ground is too vulnerable, we may reinforce the ground by burying reinforcing bars Previous Next Next
Asphalt paving work process 2 Underground roadbed “Roadbed” is a part that supports the midpoint of pavement, and it has the role of distributing loads and shocks to upper and lower layers, respectively. You will have to lay down crushed stones and gravel on the roadbed where we have finished laying. It is said that many of the crushed stones used for the lower roadbed are relatively large in order to secure the load firmly. Previous Next Next
Asphalt paving work process 3 Upper layer roadbed Here will also need to lay down crushed stone in the upper layer of the roadbed as well. The upper roadbed has the role of uniformly receiving the load transmitted from the base just above and distributing it to the lower layer, so many crushed stones are relatively small. In order to reduce the loss of load distribution as much as possible, crushed stone with the uniform size is used. After crushing the crushed stone, press it with a road roller, etc. By firmly compressing to the prescribed density, you can get a solid foundation. Previous Next Next
Asphalt paving work process 4 stratum It is a layer laid on the roadbed, the material from here becomes asphalt. Because the base layer is a layer that becomes a cushion between the upper roadbed and the upper surface layer, the asphalt used will be rich in flexibility. Although it is being done, the top road surface of the crushed stone is covered with soft asphalt, and more working to increase the adhesion to the surface layer. Previous Next Next
Asphalt paving work process 5 Surface layer The uppermost part of the pavement, the layer of asphalt that you usually see is called the surface layer. Asphalt which emphasizes durability rather than flexibility is used for the surface layer supported by the base layer. It will distribute the load and impact on the road surface to the base layer and keep the road surface flat so that user can comfortably pass through. The asphalt paving companies also do the work called “remaining bulk” which tilts towards drainage so that water does not accumulate on the road surface……. Previous Next Next
After the overgrowth has been completed, perform a “rolling” operation that treads asphalt spread as a finish with a roller or the like. The asphalt just laid is soft and fluffy, but it will become a hardened road surface by rolling pressure. In that case, care is necessary for temperature management. Asphalt softens at high temperature and solidifies as it cools, but it will cause distortion and cracking if it cools down during rolling. In order to finish on a beautiful paved surface, it is necessary to keep rolling while maintaining sufficient temperature. Special tools and materials used in the construction of asphalt pavement work. Paving work of asphalt is done by dedicated vehicle, heavy machine, and equipment. Read the topic introduction of tools used for construction together with materials. Previous Next Next
WHO ARE WE Standard Paving Inc. From roadway to driveway Previous Next Next
Our Introduction Standard Paving Inc. is one of the most famous pavers in Virginia. We have been providing our services for last 3 decades. We are experts in expedited repair as well as renewal of your of current parking lots. We have done many projects based on replacing parking lots and to repair damaged roads. We have also made a number of private roadways and commercial roads. Previous Next Next
Our Services Commercial Roads Parking Lots Parking Lots Repair Private Roadway Striping Previous Next Next
Why Choose us ? Professional Free Estimate Employment Asphalt Paving Tar and Chip Previous Next Next
How we can be found? Website: www.standardpavinginc.com Phone Number : 844 – 266 – 7283 physical address: 8803 Sudley Road, Suite 206 Manassas, VA , USA Previous