170 likes | 187 Views
1.tBrands of asphalt<br>2.tAsphalt pavement classification<br>3.tHow to compact asphalt?<br>4.tHow is an asphalt parking lot or driveway made?<br>5.tEssential working steps when making parking lot:<br>6.tPoints to remember when making a parking lot on a weak ground<br>7.tWhat happens if you do not reach the required thickness of the gravel layer<br>8.tAsphalt is recommended for parking pavement<br>9.tAsphalt parking lot pavement is rich in type<br>10.tConstruction cost is cheap including maintenance<br>11.tMy Company Introduction<br>
E N D
TYPES AND BRANDS OF ASPHALT PAVEMENT Next Next
WHAT I DISCUSS IN THIS SECTION 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Construction cost is cheap including maintenance 11. My Company Introduction 12. Our Services 13. How We Can Be Found? Previous Brands of asphalt Asphalt pavement classification How to compact asphalt? How is an asphalt parking lot or driveway made? Essential working steps when making parking lot: Points to remember when making a parking lot on a weak ground What happens if you do not reach the required thickness of the gravel layer Asphalt is recommended for parking pavement Asphalt parking lot pavement is rich in type Next Next
BRANDS OF ASPHALT • Hot Type “B” Brand 3: The mixture is made from viscous bitumen, which gives good traction performance. This asphalt is used for the arrangement of the upper layer of highways, city roads and sidewalks, bridges, and other spaces. … • Hot Type “B” Mark 2 and Hot Type “A” Mark 1: The maximum crush size of such a mixture is 20 mm. For the manufacture of this type of coatings use oil bitumen of a certain viscosity…… • Cold type “Вх” mark 2: It is used for patching of motorways, for arranging areas adjacent to buildings of areas, flat roofs. This type of asphalt pavement also serves as a waterproofing agent…… • Coarse Grain Brand 1: Hot mix with a maximum granule size of up to 40 mm. For its preparation using viscous oil bitumen. Resistant to acids, alkalis, moisture, and mechanical stress. Laying of this brand of asphalt is carried out at a temperature of 120C…… • Hot type “B” brand 2 and hot type “B” brand 1: The main difference between the types is their composition. In the application, both the first and second options are similar – they are used for arranging places with high traffic…… Previous Next Next
ASPHALT PAVEMENT CLASSIFICATION • Fine-grained asphalt – particles of such asphalt have sizes from 5 to 15 mm. They have a tight connection with each other….. • Medium-grained asphalt – the size of the particles ranges from 15 to 25 mm. It can be used for asphalting the streets and squares of the city. • Coarse-grained asphalt – has a large fraction, which can be up to 40 mm. The use of such a mixture is necessary for asphalting road routes, especially where there is a large cluster of cars, including trucks. Such large grains of asphalt can withstand heavy loads of different types of road transport….. Previous Next Next
HOW TO COMPACT ASPHALT? • Proper and high-quality compaction of asphalt determines its service life. How to roll and compact asphalt? Asphalt can be vibrated, rolled and rammed. Vibrating plate, manual roller, light vibratory roller. • The temperature of the asphalt for laying should have a value not lower than 105 degrees Celsius. The colder the asphalt, the more passages the roller will need to make. The channel can be wetted with water to avoid sticking of asphalt on the shaft surface. The movement of the roller should be made without reversal movements, smoothly and have the same number of times along all the laying strips…… Previous Next Next
HOW IS AN ASPHALT PARKING LOT OR DRIVEWAY MADE? • Asphalt is often used when making parking lots or driveways by the asphalt paving contractors usually. Paving work of the parking lot using asphalt is roughly divided into four steps to be completed. I will introduce the process from making the ground to compacting the asphalt in an easy-to-understand manner. • Asphalt pavement may be possible even in places where the ground is weak. Even weak grounds that seems to be unable to be made into asphalt, such as rice fields and fields, can strength by laying gravel and can make parking lots with asphalt pavement. In this document, I will explain the asphalt pavement by touching the difference with concrete pavement as following; Previous Next Next
ESSENTIAL WORKING STEPS WHEN MAKING PARKING LOT: The process of asphalt pavement is divided into four main parts. Let's see how the asphalt will be completed at the ground. • Step 1: Drilling :– First of all, do the work of diggings. This work is under preparation for asphalt paving. Using a digging machine (like tractor), dig the soil and remove unnecessary soil….. • Step 2: Correcting the roadbed :- Before laying asphalt, lay rough material called crushed stone on the dug ground and adjust the roadbed….. • Step 3: Lifting the asphalt :- Here is the arrival of asphalt. The asphalt mixture is laid on the surface of the correct ground bed. In the case of a small area pavement, we use a tool called Reiki to lay it down with the hand of a person. …. • Step 4: Asphalt rolling :- Finally, do the rolling work. Compress the asphalt with about 120 degrees of heat by compressing it from the top with a rolling machine. It can be used if the surface temperature of the asphalt cools down to about 50 degrees…… Previous Next Next
POINTS TO REMEMBER WHEN MAKING A PARKING LOT ON A WEAK GROUND • When changing ground with weak ground such as field etc. to asphalt parking lot, construction method is different from usual. That is because we need to strengthen the ground. • Although it is possible to make asphalt pavement even on a weak ground, it is not only easy to deteriorate the pavement but also there is a danger that an unexpected accident may occur so that what can happen is that the ground does not have enough hardness. We have to perform pavement work on the assumption. Let's take a look at three points to be careful when paving a site with weak ground. Previous Next Next
WHAT HAPPENS IF YOU DO NOT REACH THE REQUIRED THICKNESS OF THE GRAVEL LAYER • As mentioned earlier, the gravel is about 10 cm in height and said that it adjusts according to the height of drainage, but what kind of thing happens if the thickness of the gravel is insufficient? • Asphalt which cannot remove water speeds up the deterioration. It seems that sometimes the small crack grows gradually and the hole is collapsed in the asphalt. It will cost money to re-pave if holes become empty. It is important to pay attention to wastewater so that the foundation work is carried out firmly so that asphalt is not likely to deteriorate because it is too concerned about the cost………. Previous Next Next
ASPHALT IS RECOMMENDED FOR PARKING PAVEMENT • Concrete is widely used as a material for paving as well as asphalt. Which pavement is better for creating a parking lot? • Here, i will introduce the merit obtained by choosing asphalt for parking pavement. Previous Next Next
ASPHALT PARKING LOT PAVEMENT IS RICH IN TYPE • Parking pavement has various designs. Especially, if you ask from skilled person to pave with concrete with abundant color variation and high design, you can make it a fashionable and nice parking lot. For example, using light concrete can produce a soft impression, and by combining with block tiles, lawn etc. You can express your own personality different from other houses. • The asphalt is black and dark gray impression, but color asphalt of conspicuous hue including red tea is also used. Besides concrete, if you incorporate gravel and tiles, it becomes a unique parking lot with a different flavor. Previous Next Next
CONSTRUCTION COST IS CHEAP INCLUDING MAINTENANCE Asphalt, the price of which is cheap, can be done cheaply. Also, it is difficult to increase the design, so it will not be less expensive to design and expensive. • Previous Next Next
WHO ARE WE STANDARD PAVING INC. FROM ROADWAY TO DRIVEWAY Previous Next Next
OUR INTRODUCTION Standard Paving Inc. is one of the most famous pavers in Virginia. We have been providing our services for last 3 decades. We are experts in expedited repair as well as renewal of your of current parking lots. We have done many projects based on replacing parking lots and to repair damaged roads. We have also made a number of private roadways and commercial roads. Previous Next Next
OUR SERVICES • Commercial Roads • Parking Lots • Parking Lots Repair • Private Roadway • Striping Previous Next Next
WHY CHOOSE US ? Professional Free Estimate Employment Asphalt Paving Tar and Chip Previous Next Next
How we can be found? Website: www.standardpavinginc.com Phone Number : 844 – 266 – 7283 physical address: 8803 SUDLEY ROAD, SUITE 206 MANASSAS, VA , USA Previous