Harvesting Waste Energy: Bicycle Power Generation. RIT-MSD-II Design Review 5/18/12 2:15-2:45pm 09-4425 Winter/Spring 2011-2012 P 12414. Team Members. Daniel Tobin (ME) Aaron Sieczkarek (ME) Amina Purak (ISE) Brenda Lisitano (ME) Zheng ( Flora) Li (EE). GUIDE: Professor Brownell.
E N D
Harvesting Waste Energy:Bicycle Power Generation RIT-MSD-II Design Review 5/18/12 2:15-2:45pm 09-4425 Winter/Spring 2011-2012 P12414
Team Members • Daniel Tobin (ME) • Aaron Sieczkarek (ME) • Amina Purak (ISE) • Brenda Lisitano (ME) • Zheng(Flora) Li (EE) GUIDE: Professor Brownell
Agenda • Needs/Specs • Functional Architecture • Our Concept: Mechanical and Electrical • Final Product • Testing • Cost Worth Analysis • AMPL Program • Major Issues • Objective Evaluations • Future Considerations
Our Concept: Electrical Circuit Diagram
Our Concept: Electrical Voltage(V) Time (s) Non-linear input test
Our Concept: Mechanical Motor Housing Electronics Box
Final Product Motor Housing Electronics Box
Testing • All specifications tested • Either passed ideally or marginally • No tests failed • Examples of successes • Waterproof • Dustproof • Impact Test • Voltage Test • Aesthetic Survey
Line Balancing Program #SETS set T; #tasks set N; #stations set PreT{T}; #subset of precedence #PARAMETERS param c; #Cycle time in hours (p=10, s=7.5; c=1.5hrs) param d{j in T}; #task duration param b{j in T, k in N}; #cost of doing task "j" in station "k" #VARIABLES var X {j in T, k in N} binary; #1, if task "j" is assigned to station "k", 0, otherwise #OBJECTIVE FUNCTION minimize Stations: sum{j in T, k in N} b[j,k]*X[j,k]; #CONSTRAINTS subject to TaskAssignment {j in T}: sum{k in N} X[j,k] = 1; subject to CompletionTime {k in N}: sum{j in T} d[j]*X[j,k] <= c; subject to Precedence {j in T, k in N, i in PreT[j]:i>0}: X[j,k] <= sum{f in 1..k}X[i,f];
Line Balancing Results Feasible results will be attained for Cycle Times 9 minutes or greater. Shorter Cycle Times will require a further break down of manufacturing processing times.
Major Issues • Concept Choice in MSD I • Initially ordering parts at a low cost • Material selection
Objective Evaluation • Final product meets customer requirements as a proven, robust, functional prototype. Project is on time and under budget. • Several improvements could be made: • Reduced number of parts • Decreased complexity of design • Increased grip of spring clip design • Aesthetic appeal
Future Considerations • A better phone container could be utilized that is completely waterproof. • Decrease number of tools required to build device as to be easily constructed in Haiti • Utilize a specialized motor • Contact Industrial Design Department to find out if any students wish to work on the project as well. • Systems modeling of the motor output and circuitry with a dynamic model.