1 / 10

T. Trötscher, M. Korpås SINTEF Energy Research AS

Optimal design of a subsea power grid in the North Sea. T. Trötscher, M. Korpås SINTEF Energy Research AS. General problem description. ~. ~. ~. ?. How to connect nodes with transmission lines to achieve optimal social benefit?. 2. Input data assumptions.

Download Presentation

T. Trötscher, M. Korpås SINTEF Energy Research AS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Optimal design of a subsea power grid in the North Sea T. Trötscher, M. Korpås SINTEF Energy Research AS

  2. General problem description ~ ~ ~ ? • How to connect nodes with transmission lines to achieve optimal social benefit? 2

  3. Input data assumptions • Land connection nodes in relevant countries as latitude-longitude pairs • Selected relevant connection points from the TradeWind project • Marginal cost of generation, generation capacities and time series of load. • Official ENTSO-E scenarios, same as in TradeWind • Capacity and location of offshore wind power clusters • Selected a few large clusters as identified in the TradeWind project • Existing exchange capacity between nodes • Used the net transfer capacities as published by ENTSO-E • Cost scenarios for cables, converter stations, switchgear, and offshore platforms • Adapted from the EU-IEE project WindSpeed. Work in progress. • Wind data • Interpolated reanalysis data with added variations • Sources • TradeWind http://www.trade-wind.eu/ • WindSpeed http://www.windspeed.eu/

  4. Reanalysis wind velocity is used as basis • Adjustment factors as described in the TradeWind project are applied to better represent onshore and offshore wind conditions • A sample is drawn using empirical latin hypercube sampling • Correlation in velocity is captured • The sample size can be kept relatively small • Wind velocity is converted to power generation by applying a power curve • Power curves are made to represent large clusters • Individual power curves are used for onshore and offshore wind turbines

  5. All considered interconnectors 1000MW 8800MW • 33 considered projects • Leads to 1e25 possible configurations • Impossible to enumerate • Onshore wind, TradeWind ”2030 medium wind” scenario • Norway: 4980MW • Denmark: 7291MW • Germany: 45444MW • Netherlands: 3050MW • Belgium: 1183MW • UK: 10136MW 8000MW 4000MW 3800MW

  6. An example of an optimized grid...

  7. Locked to radial connections only... • Investement in grid infrastructure 6.5 – 13.5 billion. € • Depending on cost scenario • Savings by allowing a meshed grid: ~2 billion € • Better reliability for wind farms with a meshed grid • Meshed grid is more complex to operate • Uncertain costs of t-offs/circuit breakers

  8. ~ ~ ~ ~ Conclusions • Meshed grids give better economic benefit for the EU as a whole than do radial connections • Steps should be taken to reduce regulatory barriers • Potential of savings of around 25% of investment cost • Meshed grid have a higher utilization rate than do radial wind farm connections (~70% vs ~45%) • Cost of VSC HVDC T-offs/circuit breakers as opposed to distance to shore will influence optimal grid structure • Higher costs short distance  radial + bilateral interconnectors • Lower costs long distance  meshed grid • Meshed grids also... • ... Improves reliability of grid connection for wind farms • ... Makes it viable to connect wind farms further offshore

  9. Challenges A grid solution that is cost effective for the society must be attractive for the developers! • Sharing of costs and benefits between TSOs • Construction costs, losses, congestion rent, operation costs • Support for wind power is different around the North Sea • Different legalisation for • Permissions, system operation, grid codes, system operation • Market integration and balancing of wind power Joint ”North Sea TSO” Harmonized support schemes for wind power • Sources: • An analysis of Offshore Grid connection at Kriegers Flak in the Baltic Sea By Energinet.dk Svenska Kraftnät Vattenfall Europe Transmission • Pentalateral Energy Forum : Working plan proposal on offshore electricity infrastructure

  10. Further work • Stepwise building • Current model optimizes the grid all at once • Better assumption: The grid is built in steps to accomodate more wind power. Costs fall. • Can be achieved with dynamic programming • Generator marginal costs from TradeWind don’t give rise to price variations as experienced in the market • Result: value of grid is underestimated • Use actual prices with a sesitivity to power infeed or... • Construct better/more realistic MC curves