An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Power Save Calibration Date: 2015-05-11 Authors: Hyeyoung Choi, LG Electronics

  2. Abstract • This submission provides updated results for power save calibration simulations. • Many companies clarified parameters for power save simulation calibration • The PHY rate of each frame • Use ACK frame only(no B-ACK) • The details of operation in PSM test • All test cases and parameters are defined in 11-14-0980r10 Simulation Scenarios. Hyeyoung Choi, LG Electronics

  3. PSM Test • The MSDU 1500 bytes(PPDU length=1940us) DL traffic was transmitted every 200ms • We update the following operation in our calibration • When STA on PSM receives only the Data frame(no DTIM Beacon frame), STA may reset the PSM Timer. • The STA stays in Awake state during the PSM Timeout period regardless of the value of the TIM field in DTIM beacon • Use QoS Null frame without QoS Control field in MAC header Hyeyoung Choi, LG Electronics

  4. Issues of Test 5 in current SSD(1/2) • Test 5 in Current SSD is imprecise for power save calibration. • The interval between the first DL Data arrival Time and the first DTIM Beacon Time affects the time spent in sleep state in PSM Test • Ex. DTIM=[3], Timeout=[100] ms Hyeyoung Choi, LG Electronics

  5. Issues of Test 5 in current SSD(2/2) • For example, • The first DTIM Beacon is sent at 100ms • The first DL Data arrives at 200us, 95ms • Therefore, we need to clarify the interval between the first DL Data arrival time and the first DTIM Beacon transmission time. Hyeyoung Choi,, LG Electronics

  6. Simulation results for PSM Test-Time • In our calibration, the following event sequence is assumed: • The first DTIM Beacon is sent at 100ms • The first DL DATA arrives at 200us Hyeyoung Choi, LG Electronics

  7. Simulation results for PSM Test- Energy Hyeyoung Choi, LG Electronics

  8. Simulation results for PSM Test-EER • DTIM=[3], PSM Timeout=[100]ms Energy Efficiency Ratio Hyeyoung Choi,, LG Electronics

  9. PSP Test • The MSDU 1500 bytes DL traffic was transmitted every 200ms • PPDU length=1940us Hyeyoung Choi, LG Electronics

  10. Simulation results for PSP Test-Time/Energy • STA in PSP sleeps longer than PSM Test. • Time • Energy Hyeyoung Choi, LG Electronics

  11. Simulation results for PSP Test-EER • DTIM=[3] • The PSP mechanism is more Energy efficient than the PSM. Energy Efficiency Ratio cf. EER of PSM =0.3473 Hyeyoung Choi, LG Electronics

  12. UAPSD Test • The MSDU 120 bytes DL/UL traffic was transmitted every 40ms • PPDU length=244us Hyeyoung Choi, LG Electronics

  13. Simulation results for U-APSD Test-Time/Energy • Time • Energy Hyeyoung Choi,, LG Electronics

  14. Simulation results for UAPSD Test-EER Energy Efficiency Ratio Hyeyoung Choi,, LG Electronics

  15. Conclusion • In this submission, we provide simulation results for power save calibration. • Some text changes in simulation scenario are needed. • In PSM Test of current SSD, insert text as: • In Following event sequence is assumed: • The first DL DATA arrives at 200us • The first DTIM Beacon is sent at 100ms Hyeyoung Choi,, LG Electronics

  16. Reference • [1] 11-14-0980-10-00ax-simulation-scenarios.docx • [2]11-15-0103-00-00ax-power-save-calibration.pptx • [3] 11-15-0072-01-00ax-U-APSD power saving calibration results • [4]11-15-0306-03-00ax-Power-Save-Mode-Calibration-Results.pptx Suhwook Kim, LG Electronics

  17. Straw poll #1 • Do you agree to add the following text into Test 5 (Power Save Mechanism) of the latest Simulation Scenarios document • Following event sequence is assumed: • The first DL DATA arrives at 200us • The first DTIM Beacon is sent at 100ms • Y: • N: • A: Hyeyoung Choi,, LG Electronics

More Related