210 likes | 311 Views
Initial Step to go beyond 200E30. Ted TDWG, Sept 1st 2006. The Sunday night phone call…. Last Sunday night, Ted got a call from control room: “Ted, where are you? We have 40% dead time here!!!” “well, I am home. what’s the luminosity?” “200 E30”
E N D
Initial Step to go beyond 200E30 Ted TDWG, Sept 1st 2006
The Sunday night phone call… • Last Sunday night, Ted got a call from control room: • “Ted, where are you? We have 40% dead time here!!!” • “well, I am home. what’s the luminosity?” • “200 E30” • “OK! Relax, that is expected... Thanks for the call though” • Have been waiting for this phone call since Jan. 2006 when 1st GUT table was commissioned… • Back then, had plan for 200E30 (see TDWG talk on Jan 20th) • But needed high lumi data points to guide us the details… • Machine folks tried ~200E30 on Feb. 14th with 418E10 pbars, but failed badly: The “Valentine’s day massacre of pbars!” • Now > 200E30 is here! Yesterday morning: 223E30! • And we were hit really badly, had to drive the system “by hand”: hand prescaled a few high rate triggers! (high Pt CMX and MET+2JETs by PS200 etc!) …
People are extremely supportive:Thanks! • Our ass has been kicked, 1st time in the past year! • GUT table got burned at high luminosity ~ 200E30 • Many people came talk to me to show their full support! Willis/Peter, Jonathan, Rob/Jaco, Henry, Beate,Vadim, Larry,Tom, Mary, Oscar, Viktor, Cheng-Ju, Marcel/Ankush/Ulrich… • Received LOTs emails in the past few days about this… from many. • Time to fight back… • Can we handle this? You bet! • Key to success: work together as a coherent team! • TDWG/Physics Groups/Trigger Hardware&Software/DAQ/Offline/OPS/… • Next: Some details
CDF Trigger Performancein 24 seconds… • L1A bandwidth: ~ 30KHz, no longer a bottleneck for RunIIb • L2 Decision crate and SVT upgrade • XFT upgrade will also improve the L1 purity • L2A bandwidth: ~1 KHz, not enough for RunIIb • Tons of work went into EVB/L3 upgrade, DAQ improvements … • Significant improvements from ~ 300 Hz to ~1 KHz • Still not “enough”: 40% deadtime at 200E30 • The problem: L2A cross section grows rapidly with luminosity • Why? Mostly JUNK
Last Sunday run (4928, Aug 27, 2006) • . Slope: > ~150Hz/10E30
Soft Readout deadtime wall Hard Busy deadtime wall . The two great Walls competing for attention…
Last Sunday run (4928, Aug 27, 2006) • . Slope: ~190Hz/10E30 after dead time correction
L2 triggers with high growth term:two types of L2 triggers gone wild… Track/mu related: e.g. CMX etc L2CAL related: e.g. MET+2JETs . Why? Probably Bad names… JET: JUNK Enhanced Trigger MET: MESS Enhanced Trigger CMX: Could Match beamX
L2A rate increase from 160 to 200E30 • High rate L2 triggers: • CMX6_PT8_TRK5/CMX6_PT15: 100/340 Hz@160/200E30, 240 Hz jump ! • CJET10_JET10_L1_MET25: 100/180 Hz @ 160/200E30, 80 Hz jump • TWO_CMU1.5_PT2_DPHI120_OPPQ_PS2: 50/120Hz, 70 Hz jump CMU1.5_PT2_CMX1.5_PT2_DPHI120_OPPQ_PS2: 30/140 Hz, 110 Hz jump • BJET15_D120_JET10_ETA1.8: 24/64 Hz @160/200E30, 40 Hz jump • Sum of all 5 triggers above: 300/840 Hz @ 160/200E30, 540 Hz jump • The slope is: 540 Hz/ 40E30 or ~130 Hz / 10E30 for the 5 triggers above • The overall L2A slope for current table: ~200 Hz/10E30 around 180E30 • The slope gets bigger at higher luminosity ! • Conclusion: • The 5 triggers fill up the bandwidth at 200E30 (840Hz) • their growth or slope dominates (130Hz/10E30 vs 200Hz/10E30 total) • At 220E30, had to prescale away four of them (except J/Psi CMU) in order to keep deadtime below 30%… run 222413
Initial step to go beyond 200E30: next table (v7) next week • CMX6_PT8_TRK5/CMX6_PT15: • Add new CMX trigger with SLAM confirmation at L2 (not at L1 yet), test version first with a PS • Physics groups should help XFT folks to validate the new triggers as soon as we have the data • Keep the existing one at low luminosity, as it is more efficient, either by DPS or lumi_enable • Can keep a copy of the existing one with heavy PS, to higher luminosity (for normalization etc) • CJET10_JET10_L1_MET25: • Add a test version with PS for: CJET10_JET10_L2_MET27 • Add a test version with PS for: CJET25_JET10_L1_MET25 • Keep the existing one, with DPS or lumi_enable at L2 • J/Psi CMU and CMX version with PS2: • Switch over to the new J/Psi triggers with MT and asym Pt (already tested), with DPS • For the existing ones, change PS2 to PS50 • (near future: Work with B group to implement new J/Psi triggers for higher luminosity) • BJET15_D120_JET10_ETA1.8: DPS or lumi_enable • Change to MET_BJET_DPS: currently L1 fully enabled while L2 DPSed • L2 DPSed started to relax only below 150E30 • L1 is at 9KHz @ 220E30, and only 2.5KHz at 150E30 • Lumi_enable L1_MET15_JET15_TWO_TRK5 below150E30 for next table
Fresh high lumi data for trigger studies:Run 222413, lumi 170-220E30! • Taken yesterday with table v6 • High PT CMX triggers prescaled by PS200, as agreed back in Jan. for a test run (as agreed, CMX was marked bad) • MET+2JETs trigger prescaled by PS200 • J/PSI CMX version prescaled by PS50 • New muon phi-gap trigger disabled at L1 (was at 6.8KHz at 220E3) • Deadtime was about 20% at 210E30 • Also has new test triggers with SLAM confirmation in this data • Under trigger paths: TETS_ELECTRON_CENTRAL_L13D, L23D etc… • Physics groups: please help the XFT folks to look at the data! • This run is perfect data sample for all other trigger studies!
Future Plan • Only focused on next table at this meeting, more work ahead of us in the near future • More triggers will be on DPS/lumi_enable in the near future, as we move into higher luminosity • This next table is good up to 210E30. This is just the 1st step • More changes coming very soon! Will be BUSY this fall…. It’s fun time, Join us! • Need help from Physics Groups to validate/commission the new XFT • The new capabilities likely available at different times • Needs careful planning on how to commission/integrate new triggers into trigger table • Use common sense: Do and push for what we need most first, e.g. high Pt then low Pt… • DPS accounting and accounting: we need it NOW • Core software work done… Jonathan needs physics groups to help for validation… • (near future: Work with B group to implement new J/Psi triggers for higher luminosity) • Push for L1 MET improvement • Feasibility study already done by Peter… time to make it work in system. Needs help here • Continue to improve the bandwidth: EVB/READOUT/L3/CSL on going • L2CAL upgrade
backups • Some online plots.
TriggerPath: MET_BJET_DPS [14] • Level 2: L2_TWO_TRK2_D100_&_BJET15_&_MET15_DPS [2] Level 3: L3_MET20_TWO_TRACK [1] • TriggerPath: MET_L2PS4K_L1_MET15_&_JET5_&_TWO_TRK2 [1] Level 2: L2_PS4K_L1_MET15_&_JET5_&_TWO_TRK2 [1] Level 3: L3_NULL [1] Lumi_enable this one at L1