190 likes | 199 Views
Bond Proposal Facility Improvements. Mechanical Electrical Safety/Security Video surveillance Fire safety Access control Enhanced Programming Roofing/Structural/Site Work. Alma Schrader. Mechanical New boiler system HVAC system and integrated temperature controls Electrical
E N D
Bond Proposal Facility Improvements • Mechanical • Electrical • Safety/Security • Video surveillance • Fire safety • Access control • Enhanced Programming • Roofing/Structural/Site Work
Alma Schrader • Mechanical • New boiler system • HVAC system and integrated temperature controls • Electrical • New high-efficiency lighting systems • Occupancy sensors • Safety/Security • Fire system upgrades with auto 911 capabilities • Intruder prevention door hardware • Exterior door security • Video surveillance • Administrative offices relocated to control access • Enhanced Programming • Additional classrooms • Music room • Roofing/Structural/Site Work • New energy efficient roofing • Storm water upgrades
Blanchard • Electrical • Occupancy sensors • Safety/Security • Intruder prevention door hardware • Exterior door security • Video surveillance
Clippard • Mechanical • New boiler system • HVAC system and integrated temperature controls • Electrical • New high-efficiency lighting systems • Occupancy sensors • Safety/Security • Fire system upgrades with auto 911 capabilities • Intruder prevention door hardware • Exterior door security • Video surveillance • Administrative offices relocated to control access • Enhanced Programming • Additional classrooms • Roofing/Structural/Site Work • New energy efficient roofing • Storm water upgrades
Franklin • New 50,000+ square foot building • Improve safety and security • Off street drop off/pick up • Remain at current site • Architecture to remain consistent with neighborhood
Jefferson • Mechanical • HVAC system and integrated temperature controls • Electrical • New high-efficiency lighting systems • Occupancy sensors • Safety/Security • Fire system upgrades with auto 911 capabilities • Intruder prevention door hardware • Exterior door security • Video surveillance • Administrative office relocated to control access • Enhanced Programming • Additional classrooms • Music room • Roofing/Structural/Site Work • New energy efficient roofing • Storm water upgrades • Gym floor mud jacking
Central Middle School • Mechanical • Boiler replacement • HVAC integrated temperature controls • Electrical • New high-efficiency lighting systems • Occupancy sensors • Safety/Security • Fire system upgrades with auto 911 capabilities • Exterior door security • Video surveillance • Administrative office relocated to control access • Enhanced Programming • Renovation of counseling area • Roofing/Structural/Site Work • Additional parking • Upgrade stairway railing
Central Junior High School • Mechanical • HVAC integrated temperature controls • Electrical • New high-efficiency lighting systems • Occupancy sensors • Safety/Security • Fire system upgrades with auto 911 capabilities • Exterior door security • Enhance video surveillance • Enhanced Programming • New library • Roofing/Structural/Site Work • Storm water upgrades
Central High School • Enhanced Programming • Additional classrooms • Performing Arts Auditorium • Events Stadium
How will the bond proposal improve student achievement and graduation rate? • Passage of the bond proposal will provide the funds necessary for facilities; therefore, allowing operating funds to be used towards curricular expenses. • Provide an environment that is conducive to learning…basic needs of education (lighting, safety and security, heating/cooling, appropriate space, technology capabilities). • Research indicates students involved in co-curricular activities achieve at higher levels and stay in school. • District has comprehensive measures in place improve student achievement and graduation rate.
K-12 comprehensive measures to improve student achievement and graduation rate • District-wide pre school • Summer school for PK-12 grade students • After school tutoring at all building sites • Local assessment program utilized to monitor student progress throughout the year • Utilize an Academic Watch document to monitor students at-risk of academic failure • Alternative Education Center expanded to serve sixth grade • Social worker • Utilize parent liaisons • Show Me Scholars academic mentoring program for students in 8-12 grade • Provide 7-12 academic intervention classes (PAS, ACE) • Partner with United Way Education Solutions Team • Partner with Big Brothers/Big Sisters • High quality professional development activities • GED Options Program
The bond proposal will not increase the property tax rate. • pre-paid debt • low interest rates • positive bidding climate
Now is the right time to propose a bond issue. • Bidding climate • Favorable interest rates • Creation of jobs • Stimulate local economy
Shifting debt service levy to operating levy • The issue has been studied internally and with our professional team. • The dollar amount generated by asking the voters to shift a portion of the debt service tax rate to the operating levy is minimal as compared to the increased cost of postponing facility projects.
No Tax Rate Increase • Over the last ten years the district has taken advantage of a favorable lending environment and refinanced debt. Refinancing allowed for aggressive prepayment of debt. • Prepayment has placed the district in a position to propose a no tax rate increase bond issue.
What will be the cost-savings of the new projects? • Energy efficiency • New roofs • Deferred maintenance
Events Stadium • Multipurpose • Friday football • Band competitions • Track • Student participation • Cost savings • School and community pride • Generate revenue
Auditorium • Enhanced curriculum • Choir • Orchestra • Concert band • Theatre productions • Speech/Debate • Assemblies • Guest speakers • Award presentations
Franklin: New vs. Renovation • Focus on future generations • Cost comparison • Seismic standards • ADA • Mechanical, plumbing, electrical systems • Asbestos