An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Centreville Public Schools 2013 Bond Proposal

  2. How did we get here? • Enrollment / state funding figures • Facility assessment • Bond program • What does this mean to me?

  3. FTE Enrollment

  4. Allowance Per Pupil

  5. What We Found • A facility assessment by TowerPinkster determined: • Facility condition • Life Safety needs • Building capacity • Mechanical / Electrical / Structural • Technology needs • Transportation

  6. Current Debt Mills

  7. The Master Plan • 1 vote… 3 phases… 8 years • Phase 1 – 2014, $4 million • Phase 2 – 2017, $3.5 million • Phase 3 – 2021, $5.2 million • Increase millage by 2.95 mills level term

  8. Financing Strategy • Minimize Taxpayer Burden • Conservative interest rate and property tax value assumptions • Time phased with needs assessment • Similar impact to 1999 election • Total debt mills <7 • Increase to current <3

  9. The Impact of a 2.95 Mill Increase • www.mytaxcalc.com/centreville

  10. Lifespan of Building Systems

  11. Investment by Type & Phase

  12. Work To Be Done - Snapshot • District wide technology upgrades • Bus replacement

  13. District Wide Technology Plan • Networking Infrastructure • Current network is 10 years old • Cannot accommodate today’s technology demands • Wireless • Network wiring • Server replacement • Backup storage system

  14. District Wide Technology Plan • Classroom Setup/Wiring • Electrical, Networking, Audio/Video, Proper mounts and outlets • Devices/Equipment • Mobile devices & carts • New workstations • Interactive classrooms

  15. Current Bus Inventory

  16. Bus Purchase Plan

  17. PHASE I – Elementary [2014] Building Renovations • Hydronic piping, replace ventilators in 1954 wing, replace HVAC in commons (1954) • Replace half of roof • Flooring • Landscaping, asphalt & pavement • Update select furnishings

  18. PHASE I - Elementary [2014] Security • Doors & hardware (interior & exterior) • Paging system • Security cameras • Secure main entryway

  19. PHASE I – Jr./Sr. High School [2014] Building Renovations • HVAC upgrade • Interior work • Roof Replacement • Motorized bleacher/backboard • Parking Lot Upgrade • Relocate Administration Office to Jr./Sr. High School

  20. PHASE I – Jr./Sr. High School [2014] Athletics • Replace track • Locker room • Replace visitor bleachers at football field

  21. PHASE I – Jr./Sr. High School [2014] Security • Doors & hardware (interior, exterior & corridor) • Paging system • Lab & maintenance safety • Secure main entryway • Security cameras

  22. PHASE II - Elementary[2017] Building Renovations • Complete roof • Replace exterior windows • HVAC • Landscaping

  23. PHASE II - Elementary [2017] Building Renovations • Interior work • Classroom Boards • Replace clock system • Stage curtain • Interior doors & hardware • Furnishings • Flooring • Replace lighting • Replace ceiling • Remodel restrooms

  24. PHASE II - Jr./Sr. High School [2017] Building Renovations • Patch building exterior • Interior finishes • Replace ceilings • Enclose soffits • Flooring • Classroom boards • HVAC

  25. PHASE II - Jr./Sr. High School [2017] Athletics • Locker room remodel • Finishes • HVAC • Ceilings & lighting Security • Interior doors & hardware

  26. PHASE III - Elementary [2021] Building Renovations • Casework & exterior window replacement • Interior furnishings • Remodel multi-purpose area • Flooring • Boiler replacement • Water softener

  27. PHASE III - Elementary [2021] Building Renovations • Parking, landscaping, playground improvements • Security • Card access control system • Gym upgrades • Digital sign • Gym lighting • Replace bleachers

  28. PHASE III – Jr./Sr. High School [2021] Building Renovations • Replace exterior windows • Patch exterior walls • Water softener • Interior work • Replace lighting • Remodel music room • Digital sign • Flooring

  29. PHASE III – Jr./Sr. High School [2021] Building Renovations • Replace boiler • New car and bus loading areas • Gym balcony guardrail • Fitness room doors & windows • Furnishings (Phases I, II, III)

  30. Additional Work Covered Bridge Upgrades • Technology & furnishings • Phase I, II & III Agricultural Building • New Roof - Phase I Transportation Building • Demolish and Rebuild – Phase II

  31. Covered Bridge Upgrades

  32. Covered Bridge Upgrades

  33. Covered Bridge Upgrades

  34. Community Meetings • Tuesday, September 10th at 7:30 PM • Tuesday, September 24th at 7:00 PM • Tuesday, October 8th at 7:00 PM • Tuesday, October 22nd at 7:00 PM

  35. What are we asking for? Get out and Vote!! November 5th 2013