An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TDCB Status report Bruno Angelucci, Stefano Venditti NA62 meeting, 14/12/2011

  2. Outline • Delivery of 11 TDCBs (last meeting) • Firmwareimprovements • TDC windows: a non-problemsolved • First tests on rates and cross-talk • Future plans

  3. TDCBs delivery 11 TDCBsdeliveredtoallgroupswhorequestedthem • Mountingproblems on theTDCBs: • Oneboard’s RAM mountedupside-down (back to the firm) • Glue on oneboard’s PP connector (scratchedaway) • Some componentsadded (connectors, pins, resistances) • Firmwaretestedstep-by-step (TDC-TDCB-PP exchangetokens, wordslossespatched) and installed on eachof the TDCBs • TDCB manualupdated: severalpointsmadeclearer, manymistakescorrected • VHDL/Tell1/TDCB startupsession at CERN with at leastonepersonfromeachinterestedgroup (18/10/2011)

  4. Firmwareimprovements • The first issueaddressedafter the last meeting was the long-time “recompiling” problem(unstablefirmwareafterrecompilation, loss ofwords and/or tokens). • The problemhas (probably) beentraced back to some signalsused in the TDCB logic, whose clock wasthatfrom the TDCs. Firmwarerecompilingwasalwayssuccessfulsincethesecorrectionswereintroduced • not a proof, but a strong hint! • FIRMWARE CONVERSION TO MENTOR HDL DESIGNER • TDCB firmwareconversionfromQuartus II toMentorstartedby Marco • severalblocksmadeclearer/lesscumbersome • the conversionisalmostcompleted, the “new” firmwarewillbetested in the nextweeks

  5. TDC & TDCB functioning • 1 TDCB → 4 TDCs→ 128 channels • TDCs output: leading and trailingwords (info on TDC index, channelnumber, timemeasurement at ~100 ps resolution) • Words go into a 4 word-deepderandomizer, then in a 256 word deep L1 buffer (through a round-robinof the 8 ch. group) • Eventsfrom the 4 L1 buffers are passedto the readout FIFO ld/tr. (0x4/5) TDC channel(32) 01010100010111010101100100010101 eventtime (19 bit) TDC number & board (4x4) • TDCBsgetwordsfromTDCs end deliversthemtoPPsthrough a tokenexchangemechanism (no hand-shaking) • A time-stamp (rollover ~107 s) and a word counter (#lead+#trail+time-stamp) are attachedto the bunchreceivedfromone TDC followingone trigger

  6. TDC windows The secondissueaddressedis the optimalconfigurationfor the TDC time windows (set through the TDC configurationstring) TRIGGER OFFSET (TROFF): trigger latencyforeachincoming trigger REJECT OFFSET (REJOF): rejectlatencyforeachincoming trigger MATCHING WINDOW(MAWIN): timeinterval in whichwords are taken SEARCHING WINDOW(SEWIN):timeinterval in whichwords are searched Whenrunning in trigger mode the matching windows MUST cover all the acquisitiontime (and possiblyavoidrepetitions) • timeinterval are in 25ns steps • MAWIN= N = (N+1) x 25 ns • REJOF at least 1 c.c. > TROFF • SEWIN at least 8 c.c. > MAWIN

  7. Anatomyof a non-error In orderto look forpossible data loss we set the acquisition system asfollow: • 12.8 µs cyclic pattern from pattern generator, 1 LVDS 25 nssignal/channel, 32 channelsfired; • Trigger to TELL1 sent by the pattern generatoritself at the end of the pattern, using the TRIGOUT port TDC windows settings: 32 CH. PATTERN TROFF: 0xE00 (-12.8µs) REJOF: 0xDF0 (-13,05µs) MAWIN: 0x1FF (12.775µs) SEWIN: 0x209(13.025µs) TDCB TDCB TDCB TDCB TELL-1 PG The idea wastohave a whole pattern from the PG in each TDCB trigger, making the searchforpossible data loss easier. ETHERNET LTU TRIGGER

  8. Anatomyof a non-error Aftercollecting ~1M data, about 0.1 % eventswith 1 missingleading/trailingwereobserved. POSSIBLE EXPLANATION: a “blindspace” betweentwocontiguous windows If so, increasing the TROFF and/or MAWIN windows shouldleadtoaninclusionofallwords in the packet (and severalrepetitions, curable via software) . A simple C++ programwaswrittento eliminate repetitions in contiguousevents, and several ~1M eventpacketswerecollectedvarying the windows (TROFF up to -13µs, MAWIN up to 12.825µs) However once the repetitionswereeliminated the samepercentageofmissingleading/trailingscame out Moreoverthe packets sent by the ethernet portswerenottime-ordered: thiscaused mixing betweendifferentpackets and furtherconfusion. SOLUTION: only 1 ethernet usedfor the tests (SL registermodified)

  9. Anatomyof a non-error In the end the “non-problem” wasspottedtobe due to the slightlydifferentdurationof the PG pattern wrt the TDC matchingwindow: ...... ...... 12,8+ε µs 1 “loss” Right # events 12,8 µs ONLY the numberof total wordscomparedto the numberoftriggersshouldbeconsidered, disregarding the numberofwords in the single packet. Sending the TELL1 clock to the PG wouldallowfor a pattern lastingexactlylike the TDC window, butwedidn’t manageto do this so far.

  10. First rate tests After fixing all the problems, some first rate testswereperformed: • Data collectedusinganinternal trigger for the TELL1 (ratherthansendingitfrom the PG) and sending a knownnumberofeventsfrom the PG; • At higherrates the useof 1 ethernet cableonlylimits the output MORE RATE TESTS SOON CROSS-TALK: one single channelwaspulsed at 80 KHz and masked in the acquisition. No signals in the other TDC channelsafter ~2h datataking MORE CROSS-TALK TESTS SOON

  11. Conclusions and outlook • The acquisition system isreadytoperformsystematictestsofrates and cross-talk, tobepresentedduring the next meeting • Eachgroupisinvitedtoaskforspecifictests in case ofneed • The firmwaretranspositionto HDL Designer willbefinalizedassoonaspossible

  12. Spare slide: PP & SL dataflow