160 likes | 251 Views
1 X 700 MW BTPS STAGE-III. STATOR UNLOADING . 10-04-2014. Proposed Vehicle Movement Rout. Material Gate. Vehicle movement in forward direction. Vehicle movement in reverse direction. Stator Unloading Area. unit-III Cooling Tower. UNIT-3 POWER HOUSE. UNIT-3 BOILER. UNIT-3 ESP.
E N D
1 X 700 MW BTPS STAGE-III STATOR UNLOADING 10-04-2014
Proposed Vehicle Movement Rout Material Gate Vehicle movement in forward direction Vehicle movement in reverse direction Stator Unloading Area unit-III Cooling Tower UNIT-3 POWER HOUSE UNIT-3 BOILER UNIT-3 ESP unit-III Chimney Crane Position Pipe Rack Unit-II Conveyor unit-I Chimney fabrication yard Technical Building
SITE INCHARGE/BHEL & OTHER BHEL EMPLOYEES AT UNLOADING LOCATION