An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Evaluation ResultsIT Hardware: First Round 11 January 2019

  2. RFP Opening – December 13th 1 p.m. AST IT Hardware The Secretary of the Bid Board conducted the opening and got 7 responses. A “Best Value” method is used for evaluating the proposals. This method evaluates both price and technical factors and uses both to arrive at the best value for the government. The key feature of this method is that the winner may not have the lowest price. • The factors to be evaluated for arriving at the Best Value offer are: Pricing ProposalsProposers provide best possible prices for each of the product and services listed. • Evaluate price reasonableness • Evaluate unit pricing Technical Proposals Proposers provide detailed approach for meeting each of the technical requirements. • Evaluate and score qualitative technical response CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  3. Price Reasonableness Evaluation IT Hardware Purpose A price reasonableness test examines whether prices offered by proposers represent normal market pricing for the items being proposed. Price reasonableness was established by comparing bid prices from all suppliers competing in the RFP to determine whether higher or lower-than-normal prices are being proposed On all received bid prices for the items, the statistical method of establishing the reasonable price range between (Mean ± 2*Standard Deviation) was used for identifying the outlier prices. Mean – (2 * Std. Dev) Mean + (2 * Std. Dev) Reasonable Price Range Mean of the Quoted Prices for all items Outlier Prices Outlier Prices Results The outliers found on the bid prices from suppliers highlight a higher than normal prices on the bidders the suppliers. Based on the statistical analysis, it could be said that none of the suppliers quoted outlier prices. CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  4. Savings Scenarios IT Hardware Purpose The savings scenarios are different award combinations. Following scenarios have been evaluated as a part of this RFP for the original items proposed and a mix of original and alternative items proposed: • Highest combined evaluation score for each configuration type • Highest combined evaluation score for each hardware type • All items to a single supplier Price Evaluation Score The Proposer that provides the lowest Total Quoted Price will achieve the maximum 100 points for pricing. Other Proposers will then achieve points proportionally based on their Total Quoted Price as compared to the lowest Total Quoted Price. CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  5. Technical Approach Evaluation IT Hardware Purpose The answers provided by Proposers in response to the Technical Approach section were evaluated by ASG evaluators to determine the extent to which they demonstrate the Proposer’s ability to fulfill the technical requirements. Any Proposer could score a maximum score of 100. Scoring done by 3 evaluators were averaged to calculate the technical evaluation score. Results in descending order * Proposer 6 did not submit the Technical Approach responses, hence scored ‘0’ in all the performance areas. CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  6. Technical Approach Evaluation Summary IT Hardware 72.0 79.3 72.0 Proposer 2 Proposer 3 Proposer 7 69.0 37.7 52.2 Proposer 4 Proposer 5 Proposer 1 Account Management Warranty & Returns Technical Support Offerings Reporting Ordering CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  7. Savings Scenarios – Including Technical Evaluation IT Hardware Savings have been calculated considering the total baseline spend of $14.1 million for all IT Hardware under this RFP – Laptops, Desktops, Monitors, Tablets, Serversand Peripherals. Results * Supplier 3 didnot bid theadditional Tablet configuration of Apple Ipad CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  8. Award Scenario Recommendation IT Hardware Purpose Combined Evaluation Scores for each proposal are used to determine the proposals which represent Best Value to the Government. The combined score is calculated as follows: • Combined Evaluation Score = Pricing Evaluation Score + Technical Evaluation Score Results The savings target for IT Hardware was $1.5mn and we are getting maximum savings of $3.77mn. If the board would like to get even more aggressive pricing, it can elect to request a best and final offer from proposers. Based on our schedule, we will need to request this from suppliers by January 14, 2019. CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  9. Appendix

  10. Details of Suppliers and the Documents submitted IT Hardware Apart from Cover Letter and Pricing Worksheet, suppliers submitted the following documents as a part of their proposal. CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  11. Savings Scenario – With Technical Evaluation Highest Combined Evaluation score for each Configuration – Original Items CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  12. Savings Scenario – With Technical Evaluation Highest Combined Evaluation score for each Configuration – Original Items Spend Breakdown Additional Savings from Incentives CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  13. Savings Scenario – With Technical Evaluation Highest Combined Evaluation score for each Hardware Type – Original Items CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  14. Savings Scenario – With Technical Evaluation Highest Combined Evaluation score for each Hardware Type – Original Items Spend Breakdown Additional Savings from Incentives CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  15. Savings Scenario – With Technical Evaluation Highest Combined Evaluation score for each Configuration – Mix of Original and Alternative Items CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  16. Savings Scenario – With Technical Evaluation Highest Combined Evaluation score for each Configuration – Mix of Original and Alternative Items Spend Breakdown Additional Savings from Incentives CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  17. Savings Scenario – With Technical Evaluation Highest Combined Evaluation score for each Hardware Type – Mix of Original and Alternative Items CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  18. Savings Scenario – With Technical Evaluation Highest Combined Evaluation score for each Hardware Type – Mix of Original and Alternative Items Spend Breakdown Additional Savings from Incentives CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  19. Savings Scenarios – Without Technical Evaluation IT Hardware Savings has been calculated considering the total baseline spend of $14.1 million for all the IT Hardware under this RFP – Laptops, Desktops, Monitors, Tablets and Servers. Results * Supplier 3 didnot bid theadditional Tablet configuration of Apple Ipad CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  20. Savings Scenario – Without Technical Evaluation Highest Pricing score for each Configuration – Original Items CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  21. Savings Scenario – Without Technical Evaluation Highest Pricing score for each Configuration – Original Items Spend Breakdown Additional Savings from Incentives CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  22. Savings Scenario – Without Technical Evaluation Highest Pricing score for each Hardware Type – Original Items CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  23. Savings Scenario – Without Technical Evaluation Highest Pricing score for each Hardware Type – Original Items Spend Breakdown Additional Savings from Incentives CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  24. Savings Scenario – Without Technical Evaluation Highest Pricing score for each Configuration – Mix of Original and Alternative Items CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  25. Savings Scenario – Without Technical Evaluation Highest Pricing score for each Configuration – Mix of Original and Alternative Items Spend Breakdown Additional Savings from Incentives CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS

  26. Savings Scenario – Without Technical Evaluation Highest Pricing score for each Hardware Type – Mix of Original and Alternative Items CONFIDENTIAL – IT HARDWARE EVALUATION RESULTS