8-Pack LLRFStatus & Schedule Steve Smith July 23, 2002
RF Processing Channel RF Generator Digital I/O Trip RF Trip (x8) Octal Down-converter IQA Digitizer SIS Mux Address Enable Reset Cal RF (x8) IF (x8) I&Q (x8) LO1 Peak Hold ADC VMIC 3122 RMS IF Mon Thresh Mon LO2 Ppeak Scope / DVM
CPU VME Crate Layout LLRF VME Crate #1 Layout (FAST) VMIC2534 VMIC3122 VMIC4132 BK Trig BLANK BLANK Special Special Special BLANK BLANK BLANK XYCOM VMIC4132 VMIC4132 VMIC4132 VMIC4132 VMIC3122 BLANK BLANK RF Monitor VME Crate #2-3 Layout (SLOW) BLANK BLANK BLANK BLANK BLANK BLANK BLANK BLANK BLANK CPU BLANK BLANK BLANK BLANK BLANK BLANK BLANK BLANK BLANK BLANK SCANNER CPU BLANK SIS SIS SIS SIS SIS SIS SIS SIS IQA IQA IQA IQA Special Joeger Joeger Joeger LO PLL RF PLL Special
Status & Issues • First 2 downconverter chassis are ready • remaining ones soon complete. • RF generator chassis assembled • Needs mixer I&Q driver boards • And switch driver • Still designing stuff • Coupling, attenuation • Panels • Control algorithms • We are ~ 4 weeks late • Constrained by manpower, lab priorities.