60 likes | 161 Views
Request For Proposals. Book 1. Contract Components; Interpretation of Contract Documents Obligations of Contractor Information Supplied to Contractor; Responsibility for Design; Disclaimer Time Within Which Project Shall be Completed Control of Work
E N D
Book 1 • Contract Components; Interpretation of Contract Documents • Obligations of Contractor • Information Supplied to Contractor; Responsibility for Design; Disclaimer • Time Within Which Project Shall be Completed • Control of Work • Access to Site; Utility Relocations; Environmental Mitigation • Equal Employment Opportunity; Subcontracts; Labor • Surety Bonds • Insurance • Risk of Loss • Payment • Contract Incentives • Changes in the Work • Suspension of Work • Termination for Convenience • Default • Damages • Indemnification • Partnering; Claims for Adjustment and Disputes • Acceptance of Project • Warranties • Documents and Records • Miscellaneous Provisions
Book 2 • General • Project Management • Public Information • Environmental Compliance • Third-Party Agreements • Utilities • Right of Way • Geotechnical • Land Surveying • Earthwork • Roadways • Drainage • Structures • Vegetation • Visual Quality Management • Signing, Pavement Marking, Signalization, and Lighting • Intelligent Transportation Systems • Maintenance of Traffic • Maintenance During Construction • Bicycle and Pedestrian Facilities
Book 3 • List of Standards • Modifications to Manuals • Modifications to Technical Memoranda • Modifications to Standard Specifications • Modifications to Special Provisions
Reference Information Documents • Environmental Documentation • Existing Information • Other Documents • Preliminary Design Drawings • Project Analysis and Calculations • Project Studies and Reports • Utilities