An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRACTICAL SEAMANSHIPSAR Crew ManualChapter 05 DEC 2011

  2. Seamanship • Seamanship is covered by three fundamental principles 1. Order - every to be kept in its place so it can be easily found when required 2. Redundancy - critical systems doubled up - actions and procedures double checked 3. Habit - ingraining habits e.g. lines are coiled, closed loop communication is used, and correct helm orders are used

  3. Ropes

  4. Types of Rope Lay • Cable laid (Left hand) • Hawser laid (Right hand) • Plaited • Braided

  5. Types of Rope Lay • Cable (Left Hand) Laid • In this example three right laid ropes (top) are turned into the cable laid rope (bottom).

  6. Types of Rope Lay • Hawser (right hand) laid

  7. Types of Rope Lay • Plaited

  8. Types of Rope Lay • Braided

  9. Components of a Line

  10. Parts of a Line

  11. Rope Materials

  12. Rope Materials • Ropes may be made out of many materials. • Natural fibres - sisal, manilla, hemp, and cotton - not generally used on rescue vessels • Artificial fibres - polypropylene, nylon, polythene, polyester and certain proprietary materials.

  13. Rope Materials • There are other sorts of artificial fibre rope such as Kevlar, Bahamas, Tendon, Kapron, which have their own properties.

  14. Polypropylene • The most common rope in use is polypropylene. It melts at 160 degrees celcius and therefore has the lowest melting point of the artificial fibre ropes. • If you are putting a wet polypropylene rope under tension, if you see rising steam from it, stand back as it could be about to break. • It is light and it floats. • It is susceptible to ultra violet damage.

  15. Line Handling

  16. Line Handling • Line handling is carried out by the crew. This involves: 1. crew safety in their part of the vessel 2. ensure that the docking/undocking plan is clear 3. inspecting lines are in good condition 4. stow away loose gear and coil lines 5. keep colleagues safe by warning of bights and lines under tension

  17. Line Handling 6. keep lines clear of the propeller and warn coxswain when they are not 7. give feedback on progress of operations involving lines

  18. Coiling a Rope

  19. Samson Posts • When making fast a line on a samson post, first make one full turn, before starting belaying the line around the staghorns.

  20. Samson Posts • On turning up on a samson post or tow post, locking tucks are not to be used.

  21. Heaving Lines

  22. Heaving Line Use • Ensure line’s bitter end is secure to own vessel. • The best way to prepare a heaving line is to make a small diameter (18”) coil. Once enough line has been coiled, split the coil in two, holding half the coil and heaving line knot in the right hand, and the other half of the coil in the left hand.

  23. Heaving Line • Extend both arms to your right, look at where you are throwing. • Swing the heaving line coils anti clockwise and upwards at about 30 degrees, releasing both parts of the coil when on line with the target.

  24. Heaving Line

  25. Line Inspection

  26. Line Inspection • All lines should be checked regularly along their length for: 1. Broken fibres, cuts, abrasion, unlaying, reduction in diameter, all of which mean a reduction in strength. 2. Powder within the lay which can be a sign of excessive wear. 3. Absorption of oils or chemicals that may adversely affect the rope.

  27. Signs of Overload during Use • Warning signs 1. Groaning, creaking or popping sounds 2. Rotating and/ or stretching 3. Shrinking in diameter 4. Loss of shape 5. Yarns or fibres (and ultimately strands) breaking and peeling 6. Steam rising from a wet rope (polypropylene)

  28. Dangers of Overload • The biggest danger with overload of a artificial fibre lines, where they have a larger capacity for stretching or shock absorbency, when they do break they will return instantly to their unloaded length, causing a severe whip lash. • This can injure an inattentive crew member.

  29. Danger Zone

  30. Knots

  31. Knots • All good knots should 1. Be easy to tie 2. Be easy to undo after being loaded 3. Be safe when properly used • Knots in ropes will reduce the breaking strain of that rope in way of the knots, by about 50%

  32. Reef Knot Used for joining two ropes of the same size together Not to be used for lines under load

  33. Clove Hitch Perhaps the most widely used of the hitches is the clove, or ratline, hitch. It is especially practical for making a rope fast to a pole or similar object.

  34. Round Turn and Two Half Hitches This is a very useful knot for tying a rope to a post. It can be tied in a rope that is under tension making it useful for boat mooring

  35. Figure of Eight This knot is best when acting as a stopper knot, tied at the end of a line to stop it being pulled through an eye.

  36. Bowline The Bowline is by far one of the best-known and oft used knots. Used to form a fixed loop at the end of a line, the Bowline can be tied with one hand, does not jam and is reasonably secure.

  37. Sheet Bend • The sheet bend is very fast to tie and when slipped, is one of the easiest bends to work with. It is also useful when joining two ropes of different diameters. In this example the red line would be the smaller diameter.

  38. Mooring and Securing the Vessel

  39. Mooring Lines

  40. Mooring Lines When one end of the mooring line is made fast on the vessel, and is to be a slip rope, the line is to be passed under the object on the dock before returning on board and making fast.

  41. Cleats Mooring rope should be belayed on a cleat, without use of any locking tuck

  42. Anchors

  43. The Anchor Shank Fluke Stock Crown

  44. The Anchor • Shank - aids in setting and weighing the anchor • Flukes - dig into the bottom to increase holding power Shank Fluke

  45. The Anchor • Crown - the swivel between flukes and shank • Stock - the part of the anchor to discourage toppling or turning of the anchor Stock Crown

  46. The Anchor • At the top of the anchor shank, there is a swivel and then a length of chain, normally the length of the boat, to which is attached the anchor line. • The chain adds weight to the anchor and also takes the chafing of the sea floor.

  47. The Anchor • Once the chain or rode is shackled to the anchor, the shackle must be moused with a wire to stop the pin coming out.

  48. The Anchor

  49. Anchoring • Anchoring is a process with steps that cannot be skipped. • If you wish to do it right the first time, double check your gear. • The bitter end of the anchor line must be tied to the boat, generally with a weak link - a line of lesser diameter and strength to the rode. • Know the type of sea floor where you are intending to anchor - rocks, sand, or mud.