Conducting Large-Scale Intertidal Oyster ( Crassostrea virginica ) Restoration as Mitigation in South Carolina Estuarine

Conducting Large-Scale Intertidal Oyster ( Crassostrea virginica ) Restoration as Mitigation in South Carolina Estuarine Waters. Michael Hodges*, William Anderson, Nancy Hadley, Holly Dyar , Allison Kreutzer. South Carolina Department of Natural Resource Office of Fisheries Management

jela
Download Presentation

Conducting Large-Scale Intertidal Oyster ( Crassostrea virginica ) Restoration as Mitigation in South Carolina Estuarine

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Conducting Large-Scale Intertidal Oyster (Crassostreavirginica) Restoration as Mitigation in South Carolina Estuarine Waters Michael Hodges*, William Anderson, Nancy Hadley, Holly Dyar, Allison Kreutzer South Carolina Department of Natural Resource Office of Fisheries Management Shellfish Management Section

  2. Background Information • SCDNR is conducting mitigation for seaport expansion by the South Carolina State Ports Authority • Minimum of eight acres of intertidal oyster reefs will be constructed after 5 years • 7.26 acres of shoreline have been planted at 24 sites since 2008 • Approximately 125,000 bushels of oyster shells will be planted along shorelines in Charleston Harbor watershed • Community volunteer component to the mitigation project • Oyster reefs will be monitored for certain success criteria by SCDNR staff

  3. South Carolina State Ports Authority Port Expansion • SCSPA is constructing a new 286 acre container port on the Cooper River (highlighted in red) • This will be the 5th port in the Charleston Harbor watershed(highlighted in red) • Currently there are two container terminals and two break bulk terminals • The new port will increase the capacity of the Port of Charleston by 1.4 million twenty-foot equivalent units (TEU) , currently at 2.6 million TEU Photo provided by SCSPA

  4. Required Mitigation for Port Expansion • The SCSPA’s terminal mitigation plan includes more than $10 million in environmental and community mitigation activities. • $1 million to restore 8 acres of oyster reefs for direct impacts to aquatic resources and wetlands • $2.5 million to recreate 22 acres of tidal marsh on Drum Island • $2 million for land protection for indirect environmental impacts and serve the public interest • $4 million in community programming to fund education and job training programs, establish an affordable housing trust and other projects. Photos courtesy of SCSPA

  5. Oyster Restoration Mitigation Plan • SCSPA provided funding to SCDNR to be used for the purpose of restoring, enhancing and monitoring eight acres of living oyster (Crassostreavirginica) reefs • Reefs are to be constructed in Charleston Harbor watershed • Reefs will be placed in intertidal areas pre-determined by SCDNR • Planting of shells will be contracted out to industry professionals • Planting sites will be monitored by SCDNR staff pre/post shell deployment

  6. Why Oysters? • Oysters are designated as essential fish habitat (EFH) by The South Atlantic Fishery Management Council (SAFMC) • Federally managed species that depend on oysters include red drum (Scienopsocellatus)and Penaeid shrimp • In S.C., intertidal oyster reefs generate biodiversity and are identified as critical habitats of concern in both the State Conservation Plan and DNR’s Comprehensive Wildlife Conservation Strategy • Oysters filter water, thus improving water quality and clarity • Intertidal oysters provide structure to aid in shoreline stabilization and erosion prevention Photo courtesy of Affinity Charters

  7. Charleston Harbor Watershed • Consists of Charleston Harbor (20.7 km2), 3 Main Rivers (Cooper, Wando and Ashley Rivers), and associated Tidal Creeks • Numerous Industrial, Commercial and Residential areas on Harbor and Main Rivers • Part of Intercoastal Waterway (ICW) • High wave energy from currents, container ships, recreational boat traffic • Run off from surrounding impervious surfaces, coastal development and the SC upstate • High commercial/recreational pressure from boating and fishing

  8. Challenges facing Oyster Restoration • Funding is difficult to obtain for restoration in areas closed to shellfishing • Mitigation is one of the few avenues for obtaining funding in these areas • Projects requiring mitigation often have a difficult time finding suitable projects that meet objectives • Finding suitable restoration sites can be challenging in areas of interest (i.e. wave energy/currents slope, bottom type) Pic of closed waters

  9. Restoration Sites • 10.83 acres (44 sites) of restorable shoreline has been mapped with Trimble GPS Pro® • 7.26 acres (20 large scale sites, 4 small scale) have been planted since Summer 2008 • 1.75 acres (10 sites) will be planted in 2011 • 0.625 acres will be constructed by community volunteers

  10. Shell Supply and Deployment • Oyster shell (Crassostreavirginica) and mined shell aggregates are purchased and delivered from Florida and North Carolina (700-900 bushels/delivery) • Shell prices are based on cost/bushel including delivery (increasing every year) • To date we have purchased 82,715 bushels of material • Shell is loaded onto contractors barge with bobcat and conveyor loader • Barge is able to transport 1200-1350 bushels per trip • Shell is transported to predetermined sites, Transport time is between 30-120 minutes based on site location Photo courtesy of L.Coen

  11. Large Scale Shell Planting • Shells are deployed from barge using high pressure water cannon at high tide • Outer boundary of area to be restored is marked with 10’ PVC stakes • SCDNR monitors planting of shell to insure proper placement within staked boundaries • Volume of shell planted is based on size of restoration site (10,000-12,000 bushels/acre) • Deployment time is 45-120 minutes

  12. Success Criteria for Restored Reefs • >70% vertical live oyster at the end of three years • Density, mean and max size of oysters will be within 1 SD of natural populations after three years • Population parameters of restored reefs will meet or exceed F1Strata characteristics • 1,926 bushels live oysters/acre • Size distribution after 3 years will include at least 30% recruits (<25mm) to insure reef propagation

  13. Long Term Oyster Recruitment Tray Monitoring 12 season grand mean = 4267 oysters /m2,2 Season SPA mean = 3143 oysters/m2 (6 sites)

  14. Long Term Average= 4048 oysters/m2 SPA Average= 1321 oysters/m2

  15. Ranking sites based on Natural Resource Restoration Targets

  16. Documenting Site Development August 2008 January 2010

  17. Monitoring Changes in Shoreline • Changes in sediment composition • Pre-construction vs. Post construction (annually) • Spartina Expansion • Pre-construction vs. Post construction • (annually) • Marsh edge erosion • (annually at selected sites)

  18. South Carolina Oyster Restoration and Enhancement Program (SCORE) • Community-based habitat restoration and monitoring program of SCDNR • Allows community volunteers to work with scientists to restore and monitor oyster habitat along the South Carolina coast • Increase oyster habitat at a minimum cost to taxpayers • Develop a citizen constituency for oysters • Initiate a grass-roots effort to restore oysters • Increase public awareness of the value of oysters to the ecosystem

  19. SCORE Reefs • Uses 2/3 bushel of shell per bag • Shell bags are made and deployed by volunteers • Can be constructed in higher energy environments than large scale reefs • 0.625 acres will be constructed after 5 years • Increased shoreline stabilization compared to large scale reefs • Can be used as living classrooms for school groups • Sites can be used for volunteer fish sampling efforts • Water quality is monitored by volunteers at restoration sites

  20. Volume of Shell Planted each Year

  21. Potential Impacts of Restoration • Documented Success=Future Funding for other Mitigation Projects • >8 acres of oyster reefs established • 8 acres of habitat for fish, crab, fish and organisms associated with oyster reefs • Increased water filtration Improved water quality • Denitrification • Shoreline stabilization/erosion prevention • Involving the public in restoration efforts

  22. Acknowledgments • South Carolina State Ports Authority • SCORE Volunteers and Organizations • SCDNR Employees • Contract Employees (Capt Pee Wee, Capt Hatt, Froggy, Chip, Trey) • Delivery Drivers (Disco, Brian, Todd, Jim) • Shell Suppliers

  23. Questions?