1 / 7

Division of Water and Audits (DWA)

Division of Water and Audits (DWA). Water-Energy Nexus Operational Energy Efficiency Program (OEEP) D.08-11-057 California Public Utilities Commission. ENERGY EFFICIENCY. LIGHT BULB. INDUCTION MOTOR. EVOLUTION. REVOLUTION. Efficiency = Output = Input – Loss

jenaya
Download Presentation

Division of Water and Audits (DWA)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Division of Water and Audits (DWA) Water-Energy Nexus Operational Energy Efficiency Program (OEEP) D.08-11-057 California Public Utilities Commission

  2. ENERGY EFFICIENCY LIGHT BULB INDUCTION MOTOR EVOLUTION REVOLUTION

  3. Efficiency = Output = Input – Loss Input Input Water-Energy Nexus: Phase I – Reduce 10% in Losses Phase II – Reduce 30% in Losses Reduction greater than or equal to 30% should result in incentives to Water IOU’s while reduction less than 30% should result in penalties from the Water IOU’s Defining Loss

  4. Step I • 300hp motor is running at full speed

  5. OPERATIONAL ENERGY EFFICIENCYNovember 18, 2008 data MOTOR SIZE 300 hp = 223.8 kW Efficiency Loss • Step I – System with no VFD & Program 39.80% 134.73 kW’s • Step II – System with VFD & No Program 49.00% 114.14 kW’s • Step IIA – System with VFD & with Program 57.60% 94.89 kW’s Reduction in Loss39.84 kW’s KWH’S savings per year (Estimated) 348,966.86 kWh’s Percentage improvement 44.72%

  6. kW Demand Reduction & kWh Energy Savings February 2, 2009 10:00 to 10:59 AM 35.671 kW Reduction = 891 – Forty-Watt Light Bulbs

  7. Conclusions • Real – Reflect actual improvements • Additional – In addition to existing programs • Quantifiable – Reliably measured – SCADA system • Verifiable – Continuously monitored and verified • Permanent – Irreversible and guaranteed • Enforceable – Backed up by contracts & legal requirements Operational Energy Efficiency Projects can be coordinated with demand response and RPS programs

More Related