1 / 43

BEST PARCTICES IN SOLAR PHOTOVOLTAICS

BEST PARCTICES IN SOLAR PHOTOVOLTAICS. Dr. O.S. SASTRY DIRECTOR PV TESTING, SOLAR ENERGY CENTRE, MINISTRY OF NEW AND RENEWABLE ENERGY, GOVERNMENT OF INDIA PH. 0124-2579213; Fax: 0124-2579207e.mail: sastry284@yahoo.in. REQUIREMENTS OF BEST QUALITY PV SYSTEMS. HIGH PERFORMANCE SAFETY

jeneil
Download Presentation

BEST PARCTICES IN SOLAR PHOTOVOLTAICS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BEST PARCTICES IN SOLAR PHOTOVOLTAICS Dr. O.S. SASTRY DIRECTOR PV TESTING, SOLAR ENERGY CENTRE, MINISTRY OF NEW AND RENEWABLE ENERGY, GOVERNMENT OF INDIA PH. 0124-2579213; Fax: 0124-2579207e.mail: sastry284@yahoo.in

  2. REQUIREMENTS OF BEST QUALITY PV SYSTEMS • HIGH PERFORMANCE • SAFETY • LONG TERM RELIABILITY • LIFE CYCLE COST (Rs./ kWh) ( GRID PARITY ?)

  3. Best practices solar energy include …. • Programme Planning • Setting Targets (physical, performance and cost reductions) • Site specific and Need based PV Systems • Use of Standards with Indicators • Growth of Industry: through put & reliability • Creation of high quality testing laboratories • Adoption of latest developments in technology

  4. JAWAHARLAL NEHRU NATIONAL SOLAR MISSION (JNNSM)(TARGETS) PHYSICAL: • 20,000 MW Utility Grid • 2000 MW Off- Grid. • 100MW Roof –Top Installations • Lighting Systems for 20Million Houses RELIABILITY & LIFE : • 35 years for PV modules? COST: • Grid Parity by 2020

  5. JAWAHARLAL NEHRU NATIONAL SOLAR MISSION (JNNSM) (ACHIEVEMENTS) PHYSICAL: • 1050 MW Utility Grid • 155 MW Off- Grid (Including Roof-top, Lighting, pumps all Off-Grid Systems) RELIABILITY & LIFE : • 10% in 10 years and 15% in 20 years for PV modules COST: • Rs. 7- 9/ Wp

  6. MAIN PV SYSTEMS / APPLICATIONS • LIGHTING SYSTEMS - PROTABLE, FIXED HOME LIGHT AND STREET LIGHTING • PV POWER PACKS - < 1kWp POWER PLANTS • STAND ALONE POWER PLANTS - 1kWp TO 25kWp POWER PLANTS, TELECOMM • UTILITY SCALE (MW CAPACITY) GI POWER PLANTS - 1MW TO 50MW GI POWER PLANTS • PV WATER PUMPS - ½ HP TO 5HP AC/DC SURFACE OR SUBMERSIBLE • OTHER APPLICATIONS - WATER PURIFIERS, GLOW SIGN DISPLAY,

  7. PV STANDARDS ADOPTED FOR PV COMPONENTS AND SYSTEMS PV Modules : • STC PERFORMANCE • IEC 60904-2 (I-V ) • IEC 60891 ( TEMP & INTENSITY CORRECTIONS) • DESIGN QUALIFICATION • IEC 61215 (MON & MULTI CRYSTALLINE SILICON) - IEC61646( THIN FILM) - IEC 62108( CONCENTRATOR) • SAFETY • IEC 61730 (ALL MODULES) • SALT, MIST AND CORROSIVE - IEC 61701

  8. PV STANDARDS ADOPTED FOR PV COMPONENTS AND SYSTEMS PV BoS SYSTEMS: • EFFICIENCY / PERFORMANCE • IEC 61683 (PCU) • IEC 62093( CHARGE CONTROLLERS & MPPT • ENVIRONMENTAL - IEC 60068 2 (1,2,14, 30) • STORAGE BATTERIES • IEC 61427 (ALL TYPE BATTERIES) - IS 1651 - IS 13369 • CABLES, SWITCH/ CIRCUIT BREAKERS/ CONNECTORS • IEC 60947 PART I,II & III • EN 50521 • IEC 60189, IS 694, IS1554, IS/ IEC 69947

  9. PV STANDARDS ADOPTED FOR PV COMPONENTS AND SYSTEMS PV SYSTEMS : • Jn. BOXES/ ENCLOSURES • IEC 2208 • IP 65 / IP 21 • SPV SYSTEM DESIGN • IEC 62124 • INSTALLATION PRACTICES - IEC 60364 - IEC 61727 • NATIONAL ELECTRIC CODES (NEC)

  10. INDICATORS MATTERS.. • PV MODULE STC EFFICIENCY • PV ARRAY AND SYSTEM EFFICIENCY • LIFE TIME ENERGY YIELDS (YL) • PERFORMANCE RATIO (PR) • CAPACITY UTILIZATION FACTOR (CUF) • LOSS OF LOAD PROBABILITY (LOLP) • LIFE CYCLE COST (Rs./ kWh) ( GRID PARITY ?) JNNSM TARGET FOR DEGRADATION: • <10% IN 10 YEARS and <15% IN 25 YEARS

  11. PERFORMANCE INDICATORS OF PV ARRAYS • YIELD FACTOR = Yf = (kWh/kWp) or (Hours) Yf = E ( ENERGY OUTPUT)/ Po ( STC DC POWER) • REFERENCE YIELD Units (Yr) in Hours or kWh/kW Yr = H ( IN PLANE IRRADIANCE )/ G( 1000W/SQ .M) • PERFORMANCE RATIO (PR) = Yf / Yr PR is dimension less, Quantifies Effect of Losses PR depends on site Temperature, Spectrum & Technology

  12. WHAT ARE OFF-GRID PV SYSTEMS?

  13. LIGHTING SYSTEMS

  14. Components of lighting System • PV MODULE 3Wp to 74Wp • Storage Battery 12V, 4AH to 100AH (Flood Lead Acid Tubular or VRLA) • Loads: 5 to 13W CFLs OR 2W to 9 W LED • Electronics: - High Frequency Electronics ballast(87%)/ DC-DC converters (95%) - Charge Controller - Protections - Indicators • Structures

  15. PV Lighting System Quality Performance (MNRE Specs) • Conditioning of the System • On-Off Cycles (Endurance Test) • Electronic Efficiency Measurement • Charge Efficiency Measurement • Lumen and LUX Measurement • Uniformity of Light • Quality of Light out put (UV content, Speckle)

  16. PERFORMANCE ASSESSMENT OF LIGHTING SYSTEMS • Conditioning test • Electronic efficiency test • Charge discharge efficiency measurement • Protections test • Lumen measurement • LUX measurement • Spectral distribution measurement of LED • Measurement of view angle

  17. LED AND CFL PERFORMANCE COMPARISON AND SYSTEM REQUIREMENTS

  18. Color recognition SOX lamp Green-Red LEDs

  19. Residential street Before 36W TL Now 20W LED 16 lux (meter under the lamp at street level) 8 lux under lamp

  20. The Physiology Scotopic Mesopic Photopic <0,01 cd/m² |0,001 cd/m² 3 cd/m² | > 3cd/m²

  21. SPV WATER PUMPING SYSTEMS

  22. Quality Testing of PV Water Pumping System TYPE OF PUMPS  DC Surface (Centrifugal) Pumps  DC/AC Submersible Pumps  Float Pumps ? SPECIFICATIONS  IEC 62253 & 61702 AND MNES Performance Guidelines 2006-07 INSTRUMENTATION  Deep Sump Well  PV Array  PV Array Testers  Data Loggers with sensors  Flow & Pressure Gauges/Meters Main Quality Indicators  Throughput - Liters/watt/day  Average Wire to Water efficiency Peak Efficiency

  23. WHAT ARE THE MAJOR CONCERNS ? • MAIN PROBLEMS ARE : - MATCHING OF PUMP AND PV ARRAY - EFFICIENCY OF MOTOR AND PUMP - PV ARRAY STRUCTURES - PROTECTIONS ( DRY RUNNING, GROUNDING, DC SHOCK etc.)

  24. BATTERY TESTING

  25. Quality Assessment of Batteries • IEC 61427 • IS 1651, IS 13369, • JIS 8709 • PERFORMANCE TESTS - Capacity Test at C/10 or C/20 rate - Shelf Life - Cycle Life vs. DoD - Charge Efficiency - Temp. Coefficients fully computer - Spill Proof Features

  26. WHAT ARE THE MAJOR PROBLEMS ? • MAIN PROBLEMS ARE : - WRONG INSTALLATIONS (MODULE, STRUCTURE & CABLES) - POOR COMPONENTS • LOW WATTAGE MODULE AND BATTERY • POOR DESIGNS, • POOR ELECTRONICS - SYSTEM SIZING PROBLEMS ? (CONNECTION OF ADDITIONAL LOADS)

  27. TO ENSURE THE QUALITY OF SUPPLIED SYSTEMS: • A THREE STEP APPROCH FOLLOWED BY IEC TO ENSURE QUALITY - TESTING OF PROTO-TYPE - QUALITY TEST DURING MANUFACTURING - QUALITY TEST OF PRODUCT FROM THE MARKET

  28. SPV POWER PLANTS

  29. OFF-GRID PV POWER PLANTS • Stand Alone • Hybrid

  30. COMPONENTS SPV POWER PLANTS • SPV Modules • Batteries • Inverters • Charge Controllers • Loads CFLs, Pumps, Motors, Refrigerators etc. • Structures

  31. STANDARDS FOR STAND ALONE POWER PLANTS • Standards for POWER PLANT Components ( PERFORMANCE, DESIGN QUALIFICATION AND ENVIRONMENT) - PV MODULE –IEC 61215, 61646, 62108 - BATTERY – BIS , IEC (NO QUALIFIED SUPPLIER?) - INVERTER IEC-61683 ( VERY FEW INDIAN SUPPLIERS!!) , - CHARGE CONTROLLER& MPPT –IEC 62093 • Design Verification IEC - 62124 • INSTALLATION AND SAFETY IEC- 62548 IEC – 61173 (OVER VOLTAGE PROTECTION) NATIONAL ELECTRIC CODE FOR SYSTEM AND EQUIPMENT GROUNDING • Performance Monitoring, DATA exchange IEC – 61724 • I-V CHARACTERISTICS OF PV ARRAY ON SITE MEASUREMENT IEC- 61829

  32. ENVIRONMENTAL TESTS STANDARDS FOR ELECTRONICS • OPERATIONAL CONDITIONS DIVIDED IN TO FOUR GROUPS - INDOOR CONDITIONED - INDOOR UN-CONDITIONED - OUTDOOR CONDITIONED - OUT DOOR UN-CONDITIONED • IEC STANDARDS - 60068-2-1 (COLD TEST -10°C ±3°C FOR 2 HOURS) - 60068-2-2 (DRY HEAT TEST 55°C ±2°C FOR 16 HOURS) - 60068-2-14 ( TEMPERSTURE CYCLING -5°C TO 55°C ±3°C FOR 5 CYCLES) - 60068-2-30 (DAMP HEAT STUDY STATE 25°C TO 40°C ±3°C AND 93% RH 12+12 Hrs, 2Cycles) • IEC STANDARD FOR INGRESS PROTECTION (IP) - IP 21 FOR HOME LIGHTS/ LANTERNS - IP 54/ IP64 FOR STREET LIGHTS

  33. PERFORMANCE TEST STANDARDS FOR INVERTERS • IEC STANDARDS - 61683 • EFFICIENCY OF PERFORMANCE of STAND ALONE INVERTERS (at unity and .25PF) - 10% LOAD - 25% LOAD - 50% Load - 75% Load - 90-100% Load • - EFFICIENCY OF PERFORMANCE OF CHARGE CONTROLLER AND MPPT ( - IEC 62093 ( PERFORMANCE TEST, PROTECTIONS, etc.) • INSTALLATION AND SAFETY FOR OFF-GRID SYSTEMS - IEC 62548 ( SYSTEM VOLTAGE, GROUNDING, RATING OF CONTROL DEVICES, etc.)

  34. ENVIRONMENTAL TEST STANDARDS INVERTERS, CHARGE CONTROLLERS AND MPPTs • OPERATIONAL CONDITIONS DIVIDED IN TO FOUR GROUPS - INDOOR CONDITIONED - INDOOR UN-CONDITIONED - OUTDOOR CONDITIONED - OUT DOOR UN-CONDITIONED • IEC STANDARDS - 60068-2-1 (COLD TEST -10°C ±3°C FOR 2 HOURS) - 60068-2-2 (DRY HEAT TEST 55°C ±2°C FOR 16 HOURS) - 60068-2-14 ( TEMPERSTURE CYCLING -5°C TO 55°C ±3°C FOR 5 CYCLES) - 60068-2-30 (DAMP HEAT STUDY STATE 25°C TO 40°C ±3°C AND 93% RH 12+12 Hrs, 2Cyc) • IEC STANDARD FOR INGRESS PROTECTION (IP) - IP 21 FOR INDOOR INVERTERS ( IN -DOOR CONDITIONED)

  35. Quality Checks Of PV Power Plants • Standards/Specifications IEC, & IEEE Standards Inspection Criteria • Performance Indicators Energy Yields ( Yi = kWh/kWp ) Performance Ratio (PR= Yi/ Rf) LOLP Plant capacity factor/ Plant Utility Factor • Instrumentations Array Testers Data Acquisition Systems (DAS) Current Voltage Power Transducers Battery SOC Testers Loads

  36. Data Contents of SPV Power Plant

  37. WHAT ARE THE MAJOR QUALITY CONCERNS? • MAIN PROBLEMS ARE : - WRONG DESIGNS ( SELECTION OF PV ARRAY, BATTERY BANK, INVERTER & LOAD) - BATTERY RELATED PROBLES ( REDUCED LIFE SPAN) - POOR INSTALLATIONS - GROUNDING ( SYSTEM, EQUIPMENT AND LIGHTNING ARRESTERS) - SHADOWING - CERTIFICATION OF COMPONENTS - MATCHING OF PV ARRAYS, MPPT RANGE, BATTERY BANK & INVERTER

  38. WHO ARE QUALIFIED TO CERTIFY?

  39. WHAT ARE THE REQUIREMENTS FROM THE LABS? • REQUIREMENTS ARE : - NABL or EQUIVALENT ACCREDITATION - PART OF THE REQUIRED TEST EQUIPMENT - MANPOWER - INDEPENDENT TEST LABORATORY PREFERRD

  40. AUTHORISED TEST CENTRES IN INDIA • SEC PV MODULES, BATTERY , LIGHTING SYSTEMS (PERFORMANCE ONLY), WATER PUMPS & INVERTERS • OATCs ERTL (KOLKATA) – BATTERIES, LIGHTING SYSTEMS & INVERTERS ETDC ( BANGALORE) – PV MODULES, BATTERIES AND INVERTERS CPRI ( BANGALORE) - BATTERIES, LIGHTING SYSTEMS (CFL), INVERTERS • ADDITIONAL CENTERS FOR PV MODULES TUV AND UL BANGALORE • ADDITIONAL CENTERS FOR BATTERIES CECRI OR ANY OF THE NABL CERTIFIED • NABL ACCREDITED ADDITIONAL CENTERS FOR IELECTRONICS , LIGHTING SYSTEMS , NVERTERS & MPPTS ETDC (Bangalore), UL, TUV, INTER TEK (Noida), ERTL (kolkata), ETDC Pune, ETDC Maholi and ETDC (G) • ALL TESTING LABS WITH NABL ACCREDITATION FOR ENVIRONMENTAL , MECHANICAL & IP TESTS ARE APPROVED

  41. QUESTIONS ??

  42. THANK YOU FOR YOUR ATTENTION!!

More Related