1 / 37

GEOCONSULT GROUP

GEOCONSULT GROUP. Geoconsult Offices. Head Office: Wals/Salzburg (Austria). Branches, Liaison Offices, Affiliated Companies, Representatives . Vienna, Innsbruck, Graz (Austria) Bratislava (Slovak Republic) Bucarest (Romania). New Delhi (India) Singapore Santiago (Chile)

jenis
Download Presentation

GEOCONSULT GROUP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GEOCONSULT GROUP

  2. Geoconsult Offices • Head Office: • Wals/Salzburg (Austria) Branches, Liaison Offices, Affiliated Companies, Representatives • Vienna, Innsbruck, Graz (Austria) • Bratislava(Slovak Republic) • Bucarest (Romania) • New Delhi (India) • Singapore • Santiago (Chile) • Buenos Aires (Argentina)

  3. Projects 35 years experience, more than 1500 projects in more than 50 countries Austria France – Switzerland A9 Pyhrn MotorwaySection Klaus CERN – LHC Metro Delhi Metro Washington Wheaton Station India USA Route Transandino MRT Singapore Argentina/Chile Singapore Ger-many Selected Projects HSR Cologne – Frankfurt Metro Santiago Chile Turkey HEPP Birecik

  4. Fields of Activity • TRANSPORTATION & INFRASTRUCTURE • WATER MANAGEMENT & HYDRO POWER • ENVIRONMENTAL ENGINEERING • STRUCTURAL ENGINEERING • TUNNELLING • GEOTECHNICAL ENGINEERING • GEOLOGY • ENGINEERING GEODESY • GEOTECHNICAL MONITORING & INSTRUMENTATION • SOFTWARE & INFORMATION TECHNOLOGY LAST VIEWED PROJECTS

  5. Services • STUDIES Regional, traffic, feasibility, environmentalund economic • INVESTIGATION PROGRAMS Geology, hydrogeology, geophysics, survey • PLANNING/DESIGN General planning, cost estimating, preliminary design,tender documents, detailed design • PROJECT DEVELOPMENT Project management, technical consulting, legal andeconomic coordination, training programs,public relations • MONITORING AND CONTROLLING Planning coordination, construction supervision, quality control, cost controlling, instrumentation

  6. Organisation GC Group GC Project OfficeGraz Graz, Austria GC Project Office Innsbruck Innsbruck, Austria Geoconsult ZT GmbH Salzburg, Austria Geoconsult Deuschland GmbH Freilassing, Germany Geoconsult Holding GmbH Salzburg, Austria Geoconsult s.r.o. Bratislava, Slovakia GC Representative Office Bucaresti Bucarest, Romania Geoconsult, Inc. Atlanta, USA OWNERS GC Mexico S.A. de C.V. Mexico City, Mexico GeoconsultBuenos Aires S.A. Buenos Aires, Argentina Geoconsult LatinoamericaChile Ltda. Santiago, Chile Geoconsult Asia Singapore Pte. Ltd. Singapore Geoconsult IndiaPvt. Ltd. Gurgaon, India Geoconsult Asia Taiwan Co. Ltd. Taipei, Taiwan Geoconsult Wien ZT GmbH Vienna, Austria

  7. Transportation & Infrastructure • ROADS AND MOTORWAYS • RAILWAYS • RAPID MASS TRANSPORT SYSTEMS • URBAN TRAFFIC PLANNING • TRAFFIC MANAGEMENT • TOURISM DEVELOPMENT FIELDS OF ACTIVITY

  8. Transportation & Infrastructure TYPICAL PROJECTS • Anatolian Motorway, Adana-Gaziantep,Turkey Motorway section (4 km) incl. bridges and4 tunnels: Tunnel Tasoluk (2 x 376 m), Tunnel Ayran (2 x 595 m), Tunnel Kizlac (2 x 2,850 m) and Tunnel Aslanli (2x 1,230 m), all tunnels two tubes, 3 lanes each, excavation area: 125-145 m2 • Izmir Aydin Motorway, Turkey Total length: more than 150 km; 4 maintenance and operation centers, 2 service areas, 5 parking areas and 7 toll plazas with up to 15 lanes FIELDS OF ACTIVITY

  9. Transportation & Infrastructure TYPICAL PROJECTS • Motorway D1, Skala – Nemsová,Slovak Republic Motorway section; total length: 6.7 kmwidth: 26.5 m, length of bridges: 1.189 kmlength of drainages: 10.3 km • Motorway D61, Horná Streda – Nové Mesto nad Váhom, Slovak Republic This section is part of E75 as well as transeuropean corridor IV.Total length: ~ 14 km3 intersections, 16 bridges (longest bridge: 751 m across river Váh and Váh channel) FIELDS OF ACTIVITY

  10. Transportation & Infrastructure TYPICAL PROJECTS • Motorway D61, Nové Mesto nad Váhom –Chocholná, Slovak Republic Motorway section; total length: ~ 15.2 km20 bridges, river relaying, anti-noise-barriers • Motorway D61, Chocholná – Skala, Slovak Republic 10.3 km long motorway section incl. bypass ofcity Trenècín; 14 bridges (longest bridge: 247 m crossing main railway line), several sloperetaining structures like anchored pile walls etc., Zlatovce maintenance centre for 58 kmlong section FIELDS OF ACTIVITY

  11. Transportation & Infrastructure TYPICAL PROJECTS • A9 Motorway Section Schön-Lainberg Nord,Austria Motorway sectionLength: 13.5 km including 6 tunnels (total length: 8.5 km) and several bridges (spans up to 370 m) • S35 Expressway Bruck/Mur – Graz, Austria Motorway section (11 km) incl. tunnel Kaltenbach (appr. 1.1 km), tunnel Kirchdorf (appr. 2.8 km), tunnel Mixnitz (appr. 0.7 km), bridge constructions, intersections, embankment/cut areas, retaining walls, slope stability measures. FIELDS OF ACTIVITY

  12. Transportation & Infrastructure TYPICAL PROJECTS • Route Transandino, Argentina/Chile Transboundary railroad connection in mountainous region, altitude up to 4,500 mTotal length of corridor: between 68.9 and 94.5 km Tunnel length: between 18.5 and 69 km • HSR Lahore – Rawalpindi, Pakistan Feasibility Study for a New High Speed Bullet Train (250-300 Km/h) on double track between Lahore to Rawalpindi; Total length: 290 km.Survey, route selection, geological, geotechnical investigations, hydrology, initial environmental examination, traffic survey, economic & financial analysis FIELDS OF ACTIVITY

  13. Water Management & Hydro Power • HYDROLOGICAL AND SURFACEWATER MODELLING, E.I.S., NUMERICAL MODELLING (SURFACE AND GROUNDWATER) • FLOOD PROTECTION SCHEMES • HYDROTECHNICAL ENGINEERING ENVIRONMENTAL ANALYSIS • WATER SUPPLY AND RESTORATION • HYDRO POWER PROJECTS FIELDS OF ACTIVITY

  14. Water Management & Hydro Power TYPICAL PROJECTS • Shahid Rajaee Dam, Iran128 m high concrete dam, concrete volume 140,000 m3Reservoir volume191.000.000 m3Design of site installation, construction supervision • HEPP Machupicchu, Peru Headrace tunnel: 17 m2,3,3 km; Underwater discharge tunnel: 22 m2, 2 km; Site supervision, technical assistance formixshield specification and approval. FIELDS OF ACTIVITY

  15. Water Management & Hydro Power TYPICAL PROJECTS • Birecik HEPP, Turkey Concrete gravity & clay-cored sand gravel filled dam; total crest length: 2.510 m; max. dam height: 62,6 m, catchment area: 100.702 km2; reservoir area: 56 km2, total storage capacity:1,2 billion m3; geological works, geophysical investigations, supervision • Water Reservoir Kapuzinerberg, Austria Total excavation: approx. 60.000 m3 (solid), Cross section: 2 – 190 m2, NATM; preliminary design, tender documents, tender design and evaluation, detailed design, etc. FIELDS OF ACTIVITY

  16. Water Management & Hydro Power TYPICAL PROJECTS • Danube, Flood Protection Scheme Machland, Austria 7 communities in a district of Upper Austria,two-dimensional modelling (90 km²),visualisation, public consultation, environmentimpact analysis, detailed design of Lot 5 • B100, Lengholz – Dellach, Austria Length 15 km in the inundation area of river Drau,flood protection scheme for different alternatives,risk and hazard analysis, design of specific measures FIELDS OF ACTIVITY

  17. Environmental Engineering • LANDFILLS, CONTAMINATED SITES, WATER POLLUTION CONTROL • ASBESTOS ABATEMENT, ECOLOGY OF CONSTRUCTION MATERIALS,INDOOR AIR QUALITY • ENVIRONMENTAL AUDITING, ENVIRONMENTAL COMPATIBILITY,WASTE MANAGEMENT, NOISE PROTECTION • GROUNDWATER MODELLING, INFORMATION SYSTEMS FIELDS OF ACTIVITY

  18. Environmental Engineering TYPICAL PROJECTS • Industrial recycling BBU Arnoldstein, AustriaFormer lead-zinc industry Review of prior data, alternative studies, cost planning and construction program, borehole logging, state of art project adaptation • Risk & Hazard Mitigation of the Mining Sector, Romania Mitigation of risk for water pollution from mining accidents: Investigation and assessment of risk, proposal of pilot projects, establishment of monitoring system and environmental guidelines, design of emergency plan FIELDS OF ACTIVITY

  19. Structural Engineering • STRUCTURAL ENGINEERING& INDUSTRIAL BUILDINGS • BRIDGES • REHABILITATION OF STRUCTURES • CAR PARKS • CIVIL DEFENSE STRUCTURES • CUT & COVER TUNNELS FIELDS OF ACTIVITY

  20. Structural Engineering TYPICAL PROJECTS • Salzburg Arena, Austria Multi functional event hall:Length 118 m, width 89 m, height 24 m, area 2,650 m2, max. number of visitors: 6,800 • New Railway Line Munich – Verona, Austria Railway tunnels in Cut & CoverNorthern access to the Brenner Base Tunnel FIELDS OF ACTIVITY

  21. Tunnelling • RAILWAY AND ROAD TUNNELS • SUBWAY SYSTEMS • HYDRO TUNNELS & CAVERNS • SHAFTS • SHELTERS AND UNDERGROUND STORAGES • MINING AND EXPLOITATION FIELDS OF ACTIVITY

  22. Tunnelling TYPICAL PROJECTS • Brenner Base Tunnel, Italy/Austria Two single track tunnel tubes, rescue tunnel, multipurpose facilities, access tunnel and drainage tunnel; Total length: approx. 64,3 km incl. bypass tunnel (main tunnel: 55.6 km), mined (NATM, TBM) and cut & cover tunnel sections • Pir Panjal Tunnel, T80, India Railway tunnel, single tube, single track andmaintenance passageLength: 11,5 kmCross section: 70 m2 FIELDS OF ACTIVITY

  23. Tunnelling TYPICAL PROJECTS • A 9 Pyhrn Motorway, Plabutsch Tunnel, Austria Expressway tunnel; Length: approx. 10 km,Cross section: 88 – 104 m²2 Ventilation caverns: 420 m² • Pakuashan Tunnel,Hanbao – Tsorotwen Expressway, Taiwan Two tubes, two-lanes each, length: 2 x 4,930 mcross section: 120 m², NATM shallow tunnel in soft ground (gravel), max. overburden: 250 m FIELDS OF ACTIVITY

  24. Tunnelling TYPICAL PROJECTS • Bochum Metropolitan Railway, ConstructionLot E 1 “BHF Rathaus Süd”, Germany Total length of lot: approx. 860 mMined running tunnel: approx. 1.360 m, Station (roof slab construction): approx. 110 m • Jubilee Line Extenstion, Contract 102Waterloo Station, Great Britain 2.5 km twin-tube tunnels under the ThamesWestminster and Waterloo Stations and other associated structuresin NATM Total length of NATM tunnels: approx. 3 km FIELDS OF ACTIVITY

  25. Tunnelling TYPICAL PROJECTS • MRT Singapore, North East Line, Contract 704,Singapore MRT bored tunnels, single track, two tubeslength: 2 x 1000 m, 2 x1500 m, inner diameter: 5.8 m • Metro Santiago, Lines 2, 4 & 5, Chile Various stations and running tunnelsLine 5: 3 mined stations (NATM), Cross section: 2 x 100 m2 and 1 x 150 m2, approx. 2 km running tunnel (NATM), cross section approx. 60 m2, ventilation shaft, construction pits, access tunnel FIELDS OF ACTIVITY

  26. Geotechnical Engineering • GEOTECHNICAL INVESTIGATION • SOIL AND ROCK MECHANICS • RETAINING STRUCTURESAND SLOPE PROTECTION • FOUNDATIONS • GEOTECHNICAL MEASUREMENTS • TUNNEL AND CAVERN DESIGN • COMPUTER MODELLING FIELDS OF ACTIVITY

  27. Geotechnical Engineering TYPICAL PROJECTS • Ertan HEP Lot II, China Total excavation volume: 3.7 Mio m³.Capacity: 17,000 GWh/year,numerical analysis of rock masses, using complex material models for the prediction of stability and risk assessment • Chelopech Mine Upgrading Project, Bulgaria 30.000 m2 of unstable slope area, 100 m of tunnel,cross section of tunnel: 30 m2; Geotechnicalassistance, numerical calculations and simulations, design works, training of personnel, geotechnical 3D monitoring system FIELDS OF ACTIVITY

  28. Geology • GEOLOGICAL MAPPING • SUBSURFACE SITE INVESTIGATIONS • ALIGNMENT AND CORRIDORINVESTIGATION PROGRAMMES • HYDRO-GEOLOGICAL INVESTIGATIONS • GEOPHYSICAL ENGINEERING • MINERAL DEPOSIT PROSPECTING • PERPETUATION OF EVIDENCE FIELDS OF ACTIVITY

  29. Geology TYPICAL PROJECTS • Tunnel Enlargement El Salvador Enlargement of 6 road tunnelsLength 40 – 600 m, total length approx. 1,5 km Engineering geological and hydrogeological surface and underground investigation • HSR Vienna – St. Pölten, Tunnels Perschlingtal, Austria Geological investigation for preliminary design, investigation program, geological prognosisand report, preparation of characteristicallyrock mass types and of the geomechanical rock mass model FIELDS OF ACTIVITY

  30. Engineering Geodesy • TUNNEL SURVEYING • CONSTRUCTION SURVEYING ANDSETTING OUT • NETWORK AND CONTROL SURVEYS • PRECISION GYROSCOPEMEASUREMENTS • DEFORMATION MONITORING • MAPPING, DIGITAL TERRAIN MODELS AND QUANTITY SURVEYS • CHECK OF PROFILE OF UNDERGROUND EXCAVATIONS • CUSTOMIZED SYSTEM DEVELOPMENT • STEERING SYSTEMS FOR TBM AND CONTINUOUS MINER FIELDS OF ACTIVITY

  31. Engineering Geodesy TYPICAL PROJECTS • Penstock Kaprun, HPP Glockner-Kaprun, Austria New penstock: 870 m long 45° inclined shaft and 450 m long shallow tunnel;Tunnel surveying of the TBM excavation, networks measurement and azimuth determinations by using the Gyromat 2000 • Lötschberg Basetunnel North, Switzerland North section of the 35 km long railway tunnel, overall length of 24.9 km; Tunnel surveying and heading control with motorised laser theodolites FIELDS OF ACTIVITY

  32. Geotechnical Monitoring & Instrumentation • SUPPLY OF GEOTECHNICAL INSTRUMENTS • INSTALLATION AND MONITORINGOF INSTRUMENTS • TAKING AND ANALYSINGMEASUREMENTS • SUPPLY AND DEVELOPMENT OFAUTOMATIC DATA ACQUISITION SYSTEMS • SOFTWARE FOR ANALYSING AND VISUALIZING MEASUREMENTS • TRAINING AND CONSULTING FIELDS OF ACTIVITY

  33. Geotechnical Monitoring & Instrumentation TYPICAL PROJECTS • Metro de Santiago, Santiago, Chile Extension of Lines 5 and 2,6 km NATM tunnel excavation D-displacement monitoring, precise levelling, geotechnical instrumentation and automatic data acquisition system during river undercrossing • Taiwan High Speed Rail C240, Miaoli, Taiwan 11 tunnels, total length of 7.4 km Optical 3D displacement measurements, geotechnical instrumentation (Extensometers with electrical displacement transducers, electrical radial pressure cells and strainmeters) FIELDS OF ACTIVITY

  34. Software & Information Technology • DATA ACQUISITION ANDDATA MANAGEMENT • GIS SERVICES AND PROJECTS • GRAPHICAL PROCESSING AND PREPARATION OF DATA • DATA MANAGEMENT, OBJECT RECONSTRUCTION AND 3D VISUALISATION • WORKFLOW, COMMUNICATION ANDDOCUMENT MANAGEMENT • INTERNET APPLICATIONS • SOFTWARE DEVELOPMENT FIELDS OF ACTIVITY

  35. Software & Information Technology TYPICAL PROJECT • Data Management System (DMS)for example:High Capacity Railway Line Graz – Klagenfurt, Koralm Section, Austriaor Brenner Base Tunnel, Austria-ItalyDMS for up to 300 clients in all fields for technical and organisationalprocessing of such interdisciplinary projects • Flood Protection Golling, Austria 3-D Groundwater modelling of Golling basin incl. two rivers and integration in a Geographic Information System (GIS), simulation of flood event, proofing of dam and wall constructions FIELDS OF ACTIVITY

  36. Selected Project Descriptions • MRT North East Line Singapore Contract 704 • MRT North East Line Singapore Contract 706 • Pakuashan Road Tunnel • Plabutsch Motorway Tunnel • Rehabilitation of Water Treatment System Matagalpa • Risk & Hazard Mitigation Romania • Road Tunnel Zell am See • Salzburg Arena • Storebaelt Railway Tunnel • Taiwan HSR, C 240 • Tunnel Porto 4 • Tunnel Pir Panjal • Xiaolangdi Multipurpose Dam • Arlberg Escape & Rescue Tunnels • BEG H7 • BEG H4-3 • Birecik Dam & HEPP • Bolu Tunnel • Bypass Trieste • Central Hydroelectrica de Machu Picchu • Lowari Tunnel • Copper Mine Los Pelambres • Ermesinde Tunnel Porto • Ertan HEPP • Fire Load DesignLainzer Tunnel LT 22 • Fire Load Design Munich-Verona • Flood Protection Golling • Hai Van Pass Tunnel • Izmir Aydin Motorway • Koralmtunnel • Large Hadron Collider CERN • London Underground Jubilee Line Extension • Matosinhos Port Crossing • Metro New Delhi • Metro Porto • Metro Santiago Line 2 • Metro Santiago Line 5 • Montenegro Mojovac • Motorway D 1 Skala • Motorway D 61 Chocholna • Motorway D 61 Horna • Motorway D 61 Nove Mesto • Motorway Section Vransko-Blagovica Trojane Tunnels • MRT Hong Kong • MRTA Bangkok

  37. GEOCONSULT CONSULTING ENGINEERS HEAD OFFICE: HOELZLSTR. 5 / A-5071 WALS/SALZBURG – AUSTRIA TEL. ++43-662-65 9 65-0 / FAX ++43-662-65 9 65-10 office@geoconsult.at / www.geoconsult.at

More Related