1 / 9

2704 Vacuum Block

2704 Vacuum Block. 1 or 3 input gauges Polyfit linearisation Scientific display in mB,Torr, Pascal Bumpless auto gauge switchover 6 On/Off setpoint outputs High vacuum gauge enable signal Roughing pump timer Leak detection routine Displays Chamber Vacuum + 2nd value with user text.

jennis
Download Presentation

2704 Vacuum Block

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2704 Vacuum Block

  2. 1 or 3 input gauges Polyfit linearisation Scientific display in mB,Torr, Pascal Bumpless auto gauge switchover 6 On/Off setpoint outputs High vacuum gauge enable signal Roughing pump timer Leak detection routine Displays Chamber Vacuum + 2nd value with user text Vacuum Feature

  3. Heating Thermocouple C Temperature Control Loop Cooling Run Temp SP Program Events Hold Reset Setpoint Programmer Program Wait Signal Hi Vac Gauge mB SP1 Vacuum Function Block SP2 Vacuum Valves Lo Vac Gauge Backing Gauge mB mB PLC Interlocks SP6 Typical Application

  4. Hi Vac Gauge mB Chamber Vacuum Switch-over block Lo Vac Gauge mB Gauge switch-over

  5. 10vdc AIM or Penning measurement range Pirani measurement range 10vdc 2vdc 1.0-E08 1.0-E06 1.0-E04 1.0-E02 1.0+E00 1.0+E03 Increasingvacuum(mB) Gauge Switch-over Switch-over region Chamber Vacuum = 50:50

  6. LEAK DET Communications Leak detect Leak detect Leak detected Start Leak Detect • Leak Detect Time • Target leak Rate Chamber Vacuum Pump off

  7. Pump off Communications Profibus-DP Roughing Pump Time-out PUMP TOUT Roughing Pump Time-out Time-out Start • Time • Target Vacuum Chamber Vacuum

  8. GON Communications Profibus-DP Hi Vac. Gauge Enable Gauge Enable Low Vacuum Gauge On Backing Vacuum • Setpoint

  9. Gauge 1 Status OR Gauge 2 Status ERR Gauge 3 Status Communications Profibus-DP Error Indication

More Related