BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg realignment & bank erosion reduction. River is 260 ft wide Gravel-sand bed

jeri
Download Presentation

Neosho River Project Specifications

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSASConstructed May-July 2000Using Bendway Weirs for thalweg realignment & bank erosion reduction

  2. River is 260 ft wide • Gravel-sand bed • Project is 2,200 ft long, Outer bank is 25 ft tall, it eroded 178 ft laterally in 6 years time • 11 Bendway Weirs, are all 70 ft long, spaced 210 ft apart & constructed of “shot rock”, 400 lb max. • First set of velocities (March 15, 2001) water was 6 ft over the weirs, second set of velocities (Mar 16, 2001) water was a measured 12 ft over the top of the weirs!! • Velocities were measured with floating oranges Neosho River Project Specifications

  3. Pre-Project. Looking upstream at the near vertical eroded bank PRE-PROJECT-NEOSHO RIVER @ GEFFERT’S-PIX BY PHIL BALCH 8/25/99

  4. Keyway for Bendway Weir doubling as a haul road. CONSTRUCTION-NEOSHO RIVER @ GEFFERT’S- PIX BY PHIL BALCH 5/23/00

  5. Placing key stone in the keyway. CONSTRUCTION-NEOSHO RIVER @ GEFFERT’S- PIX BY PHIL BALCH5/23/00

  6. Dozier pushing stone to form Bendway Weir #3. Note the thalweg is already being moved toward the center of the channel by the upstream weirs. CONSTRUCTION-NEOSHO RIVER @ GEFFERT’S- PIX BY PHIL BALCH 5/30/00

  7. 1 year later. Looking DS at the Neosho River on the flood 1 YEAR LATER-NEOSHO RIVER @ GEFFERT’S-PIX BY PHIL BALCH 5/01

  8. 2 years later. Looking US @ Bendway Weirs & stable bank 2 YEARS LATER-NEOSHO RIVER @ GEFFERT’S-PIX BY PHIL BALCH 9/2002

  9. 2 years later. Looking US at Bendway Weirs & stable bank 2 YEARS LATER-NEOSHO RIVER @ GEFFERT’S-PIX BY PHIL BALCH 9/2002

  10. 3 years later. Looking US at stable bank 3 YEARS LATER-NEOSHO RIVER @ GEFFERT’S-PIX BY PHIL BALCH 9/6/2003

  11. HIGH WATER – LET’S GET SOME VELOCITIES(We have a sack of oranges & time on our hands)

  12. The Thalweg left the bank a measured 200 ft US of BW#1 Neosho River, Allen County, Kansas 6 ft of water over weirs (estimated) Top water velocities within the weir field never exceeded 1.00 ft/second 2.72 2.79 0.33 BW #3 1.03 The Thalweg hit the bank a measured 150 ft DS of BW#11 2.04 0.60 Data collected March 15, 2001 1.61 BW #7 Mini case study: 1 of 3 BW #11

  13. Looking US at weirs at low water on the Neosho River, KS. This is not when the velocity data was taken. Mini case study: 2 of 3

  14. Neosho River, Allen County, Kansas 12 ft of water over weirs (measured) Top water velocities within the weir field never exceeded 3.00 ft/second 4.64 4.54 BW #3 2.63 4.97 4.07 2.92 6.08 Data collected March 15, 2001 6.47 BW #7 2.88 Mini case study: 3 of 3 BW #11

  15. SINCE PROJECT CONSTRUCTION THE RIVER HAS BEEN OUT OF BANK SEVERAL TIMES - IN JULY 2007 THE RIVER EXPERIENCED THE 100 YEAR FLOOD

  16. 7 years later. Looking US. Note deposition between weirs. 7 YEARS LATER-NEOSHO RIVER @ GEFFERT’S-PIX BY PHIL BALCH 11/9/2007

  17. 8 years later. After a 100 year flood. Looking US @ the Bendway Weirs & snow AFTER A 100 YEAR FLOOD-NEOSHO RIVER - PIX BY DERRICK 12/11/2008

  18. 8 years later. After a 100 year flood. Looking DS @ the Bendway Weirs AFTER A 100 YEAR FLOOD-NEOSHO RIVER - PIX BY DERRICK 12/11/2008

  19. 8 years later. After a 100 year flood. Looking DS @ lower end of the bend AFTER A 100 YEAR FLOOD-NEOSHO RIVER - PIX BY DERRICK 12/11/2008

  20. 8 years later. After THE 100 YEAR FLOOD. Looking DS. Erosion has laid the bank back to a stable angle. Note how flat the bank is at the toe AFTER A 100 YEAR FLOOD-NEOSHO RIVER - PIX BY DERRICK 12/11/2008

  21. After a 100 year flood. Looking DS. Large Woody Debris is indicative of slower velocities & good for aquatic habitat. AFTER A 100 YEAR FLOOD-NEOSHO RIVER - PIX BY DERRICK 12/11/2008

  22. This PowerPoint presentation was developed & built by Dave Derrick. Any questions or comments, call my personal cell @ 601-218-7717, or email @ d_derrick@r2d-eng.comEnjoy the information!!