CS280 Manipulator Movements. Responsible: Patrick Johnson Approved by: S. Przybelinski. GTG: . G. G. Is / Was. Description: CS manipulator does not move consistently during floor install Closure Criteria: 3 consecutive Ship sets with manipulator and laser
E N D
CS280 Manipulator Movements Responsible: Patrick Johnson Approved by: S. Przybelinski GTG: G G Is / Was • Description: CS manipulator does not move consistently during floor install • Closure Criteria: 3 consecutive Ship sets with manipulator and laser • system giving consistent readings Applicability: -9 -10 -8 Line no. Target : 105 (Pull-Up) Status: Reasons: Perform. Cost Maint. Produce. Rate Supplier / Partner Focal: N. Norman/K. Helms Originating Organization: ME Anticipated Benefits: Customer:________Program__ Weight reduction:______N/A__ Labor hrs reduction:____TBD_ Cr path reduction:_____12 hr__ Complete Closed Per PST BOEING PROPRIETARY ECCN 9E991