An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Advanced Nuclear Technology (ANT)Construction Speed and Quality Task Group NESCC MeetingNovember 7, 2013

  2. IC Ranking Process

  3. 2014 ANT Ranking

  4. Ranking of NDE projects – red: concrete projects 158 33

  5. Specific Technology Implementation Timeline Specific Technology Incorporated into new designs Vendors Specific Technology Used in New Builds Primary Research Conducted Codes Changed NRC Endorsement Industry Other Research Input Others Timeline

  6. Results of the October 23rd Meeting in Charlotte • 11 attendees • Top Topics: • ACI 318 and 349 Conflicts (tolerances and interpretation) • High Speed Welding (ASME III & IX, AWS non-pressure vessel, NQA-1) • Advances in Modular Construction (AISC N690) • Construction Data (ISO-15926, NQA-1) • Self Consolidating Concrete (Div 2) • Blast and Impact Resistant Concrete (ACI 370, 349, 359, 544) • NQA-1 (Part II, Subpart 2.5 Sections 603 and Section 502) • Moisture Tolerant Coatings • Automated Real-time Rebar and SC Module QC Inspection and Documentation

  7. Results of the October 23rd Meeting in Charlotte • Additional Topics: • Deep Containment Placement issues • Low activation concrete • Passive heat removal using structural components • Nanoparticle Coating • Custom Fabrication of Structural Steel • Fiber Reinforced Concrete and “White Tanking” admixture

  8. Next Steps • Develop full project proposals for the top technical topics • Develop Timeline considerations for all proposals • Vet the proposals with the CS&Q Team • Propose the projects to the ANT Integration Committee for 2015 funding consideration. • NESCC White Paper?

  9. Together…Shaping the Future of Electricity