1 / 25

Consortia Costs

Consortia Costs. Carol Dawe Library Integrated Network Consortium Paul Mills Prairie Area Library System March 8, 2006. Please take a moment to turn off your cell phone, or switch to silent mode . Show me the numbers!. SirsiDynix Consortia Customers: 80-100*

jerrod
Download Presentation

Consortia Costs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Consortia Costs Carol Dawe Library Integrated Network Consortium Paul Mills Prairie Area Library System March 8, 2006

  2. Please take a moment to turn off your cell phone, or switch to silent mode.

  3. Show me the numbers! • SirsiDynix Consortia Customers: 80-100* • Consortia Active in SIG: 30+ • Respondents: 22 • Sites represented at SIG Conference 21 in September 2005 *according to SirsiDynix-this is just Unicorn customers and includes about 20-30 in Canada alone.

  4. What’s is your job title? 16 different titles!

  5. We are an experienced group: • Total number of years at our current jobs: 217 years • Average years at current job: 9.86 years • Median 8.5 years • Mode 5 years • “Newbies” (Less than 2 years at a job) 3 • “Seasoned” (Over 10 years at your job) 10

  6. Libraries Served:Public: 351 Academic: 43 School: 4 Special: 21 Total Libraries 488

  7. Population Served: From 2 thousand to 2 million!

  8. PORTS 8 out of 22 libraries have some sort of annual or monthly fee bases on a port or a user and sometimes other charges were factored in as well $3,000.00 per year $1,500.00 per year $1,000.00 per year $95,000 per year for unlimited access. Other Models based on: Population Circulation “Library size” A combination of borrowers, items, and transactions How do we charge our customers?

  9. Five cost models Summaries from the survey and detailed e-mails

  10. Four-part Invention • Each library pays an equal share of 50% of the total budget • The remaining costs are determined proportionately • 15% is based on Item Count ($0.0423 per item record) • 15% is based on Circulation Count ($0.0191 per charge) • 20% is based on patron counts ($0.9690 per patron) • Count is determined by resident with valid library card • First 3,000 patrons are free • Helps small libraries keep costs down • Academic library escapes this cost completely

  11. Three-part Harmony • Three Components • Flat Charge • Each library pays an equal share of 40% of the budget • Circulation Charge • 30% of the budget is based on each library’s percentage of 5 year’s average total circulation • Workstation • 30% of the budget is based on the number of Workflows sessions at each library

  12. A Fifty-Fifty approach • Annual costs are comprised of • Sirsi maintenance costs • including I-Bistro/Content • Authority maintenance • Training and continuing education • Staff salaries/benefits • 10% contingency fee • Costs are divided between the members based on: • Each library’s total titles (at least one call number attached) • Each library’s total operating expenditures for the previous fiscal year

  13. Building by building • 75% of the operational budget is divided equally by building (not library but individual buildings) • Built into this cost is 3 simultaneous staff logins for WorkFlows • 25% of the operational budget is divided by the total number of additional simultaneous staff logins at all the libraries • Each library pays that amount per additional logins • Each building also contributes a “per building” amount to the Capital Reserve Fund

  14. Change, Change, Change Prairie Area Library System’s Fee Structure Project

  15. Quick History • 3 regional library systems (RLS) into one • 4 consortia in new RLS (three full and one union-listing)

  16. Why merge? • Efficiency • Service • Simplicity

  17. PALS Pre-Merger Cost Models • Model based on ports • Model based on circ, items, patrons, and flat library fee • Model based on ports and flat fees for certain service • Model based on flat fee

  18. New Formula 25% Circulation 25% Items 25% Patrons 25% Flat Library Fee

  19. The “Why’s” of the Formula • Most fair way to do it • Easily measurable in Unicorn • Wanted Pay to Play aspect

  20. Transitioning to New Formula • 83 Full Members of existing consortia • 58 costs go down • 6 costs go up less than 10% • 19 costs go up, 9 go up more than 40% and 1 more than 100%

  21. PALS Next Step Program • Awards for libraries whose increase was more than 10% • 10 % to 40%, 10% added to FY06 costs • 41% to 100%, 15% added to FY06 costs • 100%, 20% added to FY06 costs • Difference between FY06 costs + % increase and formula paid by PALS Award

  22. PALS Next Step (cont.) • Awards would be paid until the library’s fee comes within 10% of what the formula calls for • Projected to have formula eased in by FY13

  23. Questions and Comments Audience Participation

  24. Contact Information • Carol Dawe cjdawe@linc.lib.il.us • Paul Mills paulm@palsnet.info Thank you for attending!

More Related