1 / 15

Interchange Distribution Calculator Working Group (IDCWG) Update

Interchange Distribution Calculator Working Group (IDCWG) Update. NAESB BPS Yasser Bahbaz – IDCWG Chair November 9 th , 2011. IDCWG Update. Meetings/Conf Calls IDC Change Order Updates GTL Update. Meetings/Conf Calls. October 11 – 12 th , Minneapolis MN (OATI) NEASB joint Meeting

Download Presentation

Interchange Distribution Calculator Working Group (IDCWG) Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Interchange Distribution Calculator Working Group(IDCWG)Update NAESB BPS Yasser Bahbaz – IDCWG Chair November 9th, 2011

  2. IDCWG Update • Meetings/Conf Calls • IDC Change Order Updates • GTL Update

  3. Meetings/Conf Calls • October 11 – 12th, Minneapolis MN (OATI) • NEASB joint Meeting • November 11th (Conf Call) • December 7 – 8th, Atlanta GA (NERC)

  4. Implemented • CO 320: Set PGEN for Base Loaded Units to Effective Pmax for NNL • CO-321: Data Interface for TLR CMR Report Data for SPP • CO-325: Changes to TLR Event History Display • CO 334: Elimination of DFTFFG List Server • CO 335: SPP Data Request For ORS • BOF CO 10: Temp Flowgate Validation

  5. Development/Testing • CO 322: PFV Generation Priority Submissions • CO 328: Intra Hour Tag Curtailment • CO 329: Load Adjustments at the time of TLR 5 Issuance • CO 330: Authorization of OATI Use of IDC Data for DOE Studies • CO 331: IDC Interface to NAESB WebRegistry • CO 337: PJM Request to Access and Use IDC Data • SDX CO 09: Addition of Derate Validation to WebSDX

  6. DRAFT/Evaluation • CO 326: PFV Metrics • CO 332: Changes to Manitoba EAR Tag in IDC • CO 333: Include MF and NNL on TLR Event History Display • CO 336: Changes to IDC Factor Calculation Timing • CO 338: Default Timing for TLR Levels 1 and 0 • SDX CO 08: Remaining GUI Changes

  7. Other Items • CO 283 Summary Write is a working progress. • A Process For Displaying Curtailments within GTL Once in Parallel Operation Is Being Developed by IDCWG’s GUI Task Force. • A Request for Initiation of a NAESB BP Standard regarding TLR 5B re-allocation logic is drafted and ready to be presented to the BPS.

  8. IDCWG Update GTL Update

  9. IDCWG Update • GTL Calculation Testing – • Calculation Testing Sessions: • Test Plans Developed For GTL Calcs Prior To Test Sessions • Group Is Expected To Have Full Data Submission In January 2012. Testing Will be Considered To be Performed After Then. • Results: • No Outstanding Variances • Functional Testing Completed • CO-283 Developed As Specified Pending Required Changes For The Recently Reached BPS PFV Permanent Solution.

  10. IDCWG Update GTL Data Submission

  11. IDCWG Update • GTL Data Submission – • Full Data Load Submission: • Data Is Submitted but NOT at full Rate yet. • Issues With Data Mapping and Data Validity Remain But Enhanced. • OATI Will Address Implementation Issues As They Arise

  12. IDCWG Update Change Order 283 Status

  13. IDCWG Update • Change Order 283 Status – • IDCWG Approved CO-283 As Implemented On November 1 2010 • GTL Logic Has Been Implemented onto Production IDC. • Most Entities Are Submitting Data to Development Site ONLY Due To System Limitations. • IDCWG discussed the coordination of submitting data to both Testing and Production environments.

  14. IDCWG Update • IDCWG • Calculation Testing Is In Progress By Entities • Major Entities Are Not Submitting at Full Rate. Discussions at IDCWG To Prioritize Critical Data To Be Focused On First. • PFV Metrics Change Order Has Been Revised Several Times By The Group and was presented to ORS and BPS.

  15. IDCWG Update Questions?