Interchange Distribution Calculator Working Group (IDCWG) Update. NAESB BPS Yasser Bahbaz – IDCWG Chair November 9 th , 2011. IDCWG Update. Meetings/Conf Calls IDC Change Order Updates GTL Update. Meetings/Conf Calls. October 11 – 12 th , Minneapolis MN (OATI) NEASB joint Meeting
E N D
Interchange Distribution Calculator Working Group(IDCWG)Update NAESB BPS Yasser Bahbaz – IDCWG Chair November 9th, 2011
IDCWG Update • Meetings/Conf Calls • IDC Change Order Updates • GTL Update
Meetings/Conf Calls • October 11 – 12th, Minneapolis MN (OATI) • NEASB joint Meeting • November 11th (Conf Call) • December 7 – 8th, Atlanta GA (NERC)
Implemented • CO 320: Set PGEN for Base Loaded Units to Effective Pmax for NNL • CO-321: Data Interface for TLR CMR Report Data for SPP • CO-325: Changes to TLR Event History Display • CO 334: Elimination of DFTFFG List Server • CO 335: SPP Data Request For ORS • BOF CO 10: Temp Flowgate Validation
Development/Testing • CO 322: PFV Generation Priority Submissions • CO 328: Intra Hour Tag Curtailment • CO 329: Load Adjustments at the time of TLR 5 Issuance • CO 330: Authorization of OATI Use of IDC Data for DOE Studies • CO 331: IDC Interface to NAESB WebRegistry • CO 337: PJM Request to Access and Use IDC Data • SDX CO 09: Addition of Derate Validation to WebSDX
DRAFT/Evaluation • CO 326: PFV Metrics • CO 332: Changes to Manitoba EAR Tag in IDC • CO 333: Include MF and NNL on TLR Event History Display • CO 336: Changes to IDC Factor Calculation Timing • CO 338: Default Timing for TLR Levels 1 and 0 • SDX CO 08: Remaining GUI Changes
Other Items • CO 283 Summary Write is a working progress. • A Process For Displaying Curtailments within GTL Once in Parallel Operation Is Being Developed by IDCWG’s GUI Task Force. • A Request for Initiation of a NAESB BP Standard regarding TLR 5B re-allocation logic is drafted and ready to be presented to the BPS.
IDCWG Update GTL Update
IDCWG Update • GTL Calculation Testing – • Calculation Testing Sessions: • Test Plans Developed For GTL Calcs Prior To Test Sessions • Group Is Expected To Have Full Data Submission In January 2012. Testing Will be Considered To be Performed After Then. • Results: • No Outstanding Variances • Functional Testing Completed • CO-283 Developed As Specified Pending Required Changes For The Recently Reached BPS PFV Permanent Solution.
IDCWG Update GTL Data Submission
IDCWG Update • GTL Data Submission – • Full Data Load Submission: • Data Is Submitted but NOT at full Rate yet. • Issues With Data Mapping and Data Validity Remain But Enhanced. • OATI Will Address Implementation Issues As They Arise
IDCWG Update Change Order 283 Status
IDCWG Update • Change Order 283 Status – • IDCWG Approved CO-283 As Implemented On November 1 2010 • GTL Logic Has Been Implemented onto Production IDC. • Most Entities Are Submitting Data to Development Site ONLY Due To System Limitations. • IDCWG discussed the coordination of submitting data to both Testing and Production environments.
IDCWG Update • IDCWG • Calculation Testing Is In Progress By Entities • Major Entities Are Not Submitting at Full Rate. Discussions at IDCWG To Prioritize Critical Data To Be Focused On First. • PFV Metrics Change Order Has Been Revised Several Times By The Group and was presented to ORS and BPS.
IDCWG Update Questions?