Demand Response in Ontario Past Present and Future. July 17, 2014. Rodan is a provider of smart grid and energy management solutions for power producers, consumers and distributors throughout North America Our full suite of services includes: EnerShift Demand Response
E N D
Demand Response in Ontario Past Present and Future July 17, 2014
Rodan is a provider of smart grid and energy management solutions for power producers, consumers and distributors throughout North America • Our full suite of services includes: • EnerShift Demand Response • Metering & Smart Grid Services • Energy engineers (Energy Audits) and measurement and verification • Conservation and Demand Management Implementation Services • EnerVu Energy Monitoring • Power Reliability • Power Systems Engineering & Construction Introduction to Rodan Energy Confidential
Rodan is the only Ontario based DR3 aggregator licensed by the OPA with our Head Office and Operations Centre located in Mississauga, Ontario • We have over 30 years experience on the ground around the province. • First DR Aggregator in Ontario with the York DR program • Worked as an advisor to the OPA in development of new DR programs • Largest DR 3 aggregator with over 50% of provincial load – over 170MW Introduction to Rodan Energy Confidential
Short term cost effective reduction in Electrical Demand based on a signal from the System Operator What is Demand Response? Typical Forecast Reduced Demand Source IESO June 2014 Confidential
How do you Participate? • Water Treatment • Curtail or postpone pumping • Generator use • Cold StorageTurn off coolers • Plastics • Curtail Regrinding • General • Sub Processes, Battery Charging etc • General Curtailment Strategies • -Air Handler – Cycle on/off • -VFD’s – reduce speed by 10% to achieve 27% reduction in power • -Elevators – can one or more be turned off for 4 hrs • - Chillers – pre cool • Lighting • Roof top AC Units – can they be controlled outside of BAS to respond to DR activations Confidential
Interruptible Rate • York DR • DR 1 and DR 2 • DR3 • Peak Saver • ICI ( Global Adjustment Avoidance) Demand Response Past and Present Confidential
LTEP – 10 % or approx 2400 MW by 2025 • Transition to the IESO • Transitional Pilot ProgramJan 2015 - 2017 • Capacity Markets 2016 and beyond Demand Response -Future Confidential
Enabling tomorrow’s Smart Grid today Q&A Thank you! William Grove, Business Development, Demand Response RODAN ENERGY SOLUTIONS INC.165 Matheson Blvd. East, Suite 6 Mississauga, ON L4Z 3K2 (905) 625-9900 x236 William.grove@rodanpower.com www.enershift.com www.rodanenergy.com Confidential