1 / 11

Civil-Military Workshop Operational requirements for ASM systems

Civil-Military Workshop Operational requirements for ASM systems. Giuseppe Acampora EUROCONTROL DNM/COO/NOM/OPL/PRO. ASM System Requirements. ANT/52 Approved the ASM Improvements Initiative System Requirements Document. Local assessment. Network assessment. Planning.

Download Presentation

Civil-Military Workshop Operational requirements for ASM systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Civil-Military WorkshopOperational requirements for ASM systems Giuseppe Acampora EUROCONTROL DNM/COO/NOM/OPL/PRO

  2. ASM System Requirements ANT/52 Approved the ASM Improvements Initiative System Requirements Document

  3. Local assessment Network assessment Planning Data Transmission Upgrading Data Repository Airspace Status Notification Interoperability ASM System Requirements Document

  4. ASM System Requirements - Questionnaire Verify the current status of the system implemented or under development in respect of the user requirements described in the documents.

  5. ASM System Requirements – Questionnaire Outputs • 9 replies (8 States + NATO ACCS) • Weak points: • • What if functions; • • Interoperability with NM systems (CIAM).

  6. 16.5 10/12 03/13 09/13 03/14 17.0 17.5 18.0 NM System Releases

  7. 16.5 10/12 03/13 09/13 03/14 NM System Releases – ASM Deliverables RSA FL Band CDR ID for re-routing Exit time areas Interoperability EAD/CACD Interoperability ASM tools

  8. 17 10/12 03/13 09/13 03/14 NM System Releases – ASM Deliverables Network Impact Assessment AUP validity time CIAM development RSA NOP Portal Interoperability EAD/CACD Interoperability ASM tools

  9. 17.5 10/12 03/13 09/13 03/14 NM System Releases – ASM Deliverables eRAD via B2B Lead AMC Real time data on NOP Network Impact Assessment Interoperability EAD/CACD Interoperability ASM tools

  10. 18 10/12 03/13 09/13 03/14 NM System Releases – ASM Deliverables Buffer area in CIAM Additional ATM data in ADR Review AUP format Remote provision of non AIP data Improve EAUP/EUUP on NOP

  11. QUESTIONS?

More Related