An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRESENTATION SUMMARY • Introduction • Overview (M. Ryan) • Geography • Living with the Red (M. Clamen) • Conclusions and Recommendations • Accomplishment's • Improvements in Flood Forecasting (D. Luna) • Mitigation (Structural/non-structural/Policy/Legislation changes) • North of the Border • Manitoba (D. McNeil) • South of the Border • US Federal (J. DeHarnais) • US State—North Dakota (Dale Frink) • Summary • What’s next (M. Ryan) • Questions Mitigation – US State

  2. Post 1997 Flood Accomplishments: North Dakota ND State Engineer Dale L. Frink, P.E. Mitigation – US State

  3. Substantial Progress • Project Development • Funding • Coordination Mitigation – US State

  4. Accomplishments: ND Legislation • Water Development Trust Fund - 1999 - 45% of tobacco settlement revenues to water - Bonding for water projects • Resources Trust Fund - Oil Extraction Tax • Floodplain management enhancements- 1999 and 2003 Mitigation – US State

  5. Structural Accomplishments: Corps’ Projects • Grand Forks-East Grand Forks flood control - Substantially complete - $400 M total cost / 50% non-federal - $52 M from North Dakota Mitigation – US State

  6. Structural Accomplishments: Corps’ Projects • Wahpeton flood control - Construction underway - operational - $16 M total cost - $3.5 M from ND • Baldhill Dam- 5-ft flood pool raise - Completed in 2004 - $12 M total cost - $1.3 M from ND Mitigation – US State

  7. Structural Accomplishments: Maple River Dam • 60,000 AF temp. storage • - Started in 2004; completed 2007- $29.7 M total cost- $14.6 M from ND Mitigation – US State

  8. Structural Accomplishments: Rural Ring Dikes • May 2001: increased SWC cost-share to 50% Mitigation – US State

  9. Other Accomplishments: Floodplain Management - Rec. #13 • FEMA and ND: Map Modernization • - DFIRMs: 16 counties, 2 communities in progress- DFIRMs: 4 counties and 1 community completed Mitigation – US State

  10. Other Accomplishments: International Cooperation - Rec. #50 • Red River Basin Commission • - International Red River Board Mitigation – US State

  11. Other Accomplishments: Waffle Concept - Rec. #1 Courtesy of EERC • EERC completed Waffle study • - EERC concluded Waffle is economically feasible to mitigate flooding in large cities- More study needed on benefits of mitigating localized damages Mitigation – US State

  12. Recommendation #33: Farm Chemical Clean-up/Storage • Following ‘97 flood, EPA worked with ND to distribute info regarding farm chemical storage in flood-prone areas in RRB • - Collected about 91,000 lbs. of chemicals in months following ‘97 flood- ND Ag Dept’s “Project Safe Send” continues Courtesyof Dept of Ag Mitigation – US State

  13. Additional Needs and Gaps • Fargo flood control • Grafton flood control • More modeling: Red & Pembina • Border Dike - ND/MB Mitigation – US State

  14. Great Progress and Still Working! Mitigation – US State